Wateringbury Crossroads

Noted Committee 1 paper

Joint Transportation Board noted this item on Monday 18 November 2019. Below is the council's own wording, with the papers it was decided on.

ItemJTB 19/25

Resolved

That the report be received and noted.
Word for word from the decision Tonbridge and Malling published for this meeting. Source: democracy.tmbc.gov.uk

Follow this further

Built from Tonbridge and Malling's papers

What the report saysPro

Report to Joint Transportation Board

Summary

Kent County Council (KCC) developed a scheme to reduce congestion at the crossroads in Wateringbury, A26 Tonbridge Road / Bow Road / Red Hill. The junction is used by vehicles aiming to travel between Maidstone, Tonbridge, Nettlestead and East Malling and a number of pedestrians accessing the local amenities. However, the anticipated costs for this scheme are considerably higher than the available funding. There are few other options that can be implemented at the crossroads.

1.0Introduction and Background

Funding of £300,000 has been allocated from the South East Local Enterprise Partnership (SELEP) to improve the crossroads in Wateringbury to reduce Congestion.

Wateringbury Crossroads is a well-used traffic route and suffers from congestion which leads to pollution. There is limited road space available to make adjustments, but there is some potential to improve capacity at the junction which should see traffic flow more smoothly. The scheme aimed to maximise the potential of the available road-space while making improvements for pedestrians where possible.

The scheme proposed included:  A new dedicated right turn lane on the Tonbridge Road heading West towards the junction.  A new dedicated left turn lane on the Bow Road heading North towards the junction. This would result in a narrower pavement.  Using 0.5m of Parish land to widen the junction, allowing a vehicle to turn right into Bow Road without impeding the traffic behind.  Pedestrian phases added to the two remaining arms of the crossing  Improved traffic signal technology allowing ‘reactive’ management of the lights to optimise traffic flows.  Re-surfacing of carriageway and footways.  May result in the loss of three trees on the Tonbridge Road to accommodate widening. Can be mitigated with replacement tree planting.

2.0The expected benefits The traffic modelling for the scheme shows that there would be a 50% increase in capacity. However, this would still leave the junction at -20% practical reserve capacity in the AM peak and -14% in the PM peak. Therefore, after any changes are made the junction it will be operating as efficiently as possible but is likely queues will remain at peak times – albeit shorter queues than the current situation.

The proposed scheme offers the best improvement in capacity possible at the junction which Officers have been able to identify within the land available. This is due to the close proximity of the buildings which means additional engineering measures are not currently feasible.

3.0Programme for the works

It is expected the works would take up to 30 weeks to complete with considerable disruption to the local road network. This includes up to 15 weeks to divert the utilities.

4.0The cost

Initial estimates from the utility companies came in at a prohibitively high price. Further development work with the utility companies and trial holes were undertaken to give greater clarity of the expected cost to deliver the scheme. Although the estimates were reduced considerably; the utility diversion costs alone are expected to be around £250,000

Total cost to deliver the scheme including contingency = £868,000

To date a total of £56,000 has been spent on design development. To carry out the scheme this leaves a funding shortfall of £624,000 to deliver the scheme. There is no funding stream currently identified to meet that shortfall.

5.0The alternative option

KCC have explored the potential to upgrade the traffic signals at the crossroads at a lower cost to a full scheme. This would include upgrading controlled pedestrian crossings from far- sided pelican to near-sided puffin type and to implement Microprocessor Optimised Vehicle Actuation (MOVA) control strategy.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Wateringbury CrossroadsReport 484 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

11 of 27 attended
DL
Councillor David LettingtonChairman, present
MP
Michael PayneVice-Chair, apologies
RB
Councillor Robin BettsCommittee Member, present
VB
Councillor Vivian BransonCommittee Member, present
DD
Councillor Dave Davis CEng FICECommittee Member, present
AK
Councillor Andrew KennedyCommittee Member, apologies
NS
Councillor Nick StapletonCommittee Member, present
MT
Councillor Mike TaylorCommittee Member, present
MB
Matthew BalfourCommittee Member, present
TD
Trudy DeanCommittee Member, present
SH
Sarah HohlerCommittee Member, present
PH
Peter HomewoodCommittee Member, apologies

All 27 on the meeting page

On this subject at Tonbridge and Malling

Search all
  1. Wateringbury CrossroadsThis decision
  2. Wateringbury Crossroads - ConsultationNoted

More from Tonbridge and Malling Joint Transportation Board

All decisions
MeetingDecisionOutcome
2 Dec 2024 Parking UpdateThat the current progress and approach to the Parking Team’s work programme, be noted. Noted Open
2 Dec 2024 Parking Action Plan, Access Group 9That the decision of the Cabinet Member for Transformation and Infrastructure to set aside the objections attached at... Noted Open
17 Jun 2024 Scope of the Joint Transportation Board and local/public transportThat consideration be given to the scope of the Joint Transportation Board at the next meeting. Decided Open
21 Nov 2022 Proposed Single Yellow Line Waiting Restrictions - Oldbury LaneThat the Traffic Regulation Order for double yellow lines be implemented on Old Lane Only, as shown in the plan at Ap... Decided Open
6 Jun 2022 Proposed 40mph Speed Limit - B2016 Seven Mile Lane, MereworthThat the 40mph speed limit on the B2016, Seven Mile Lane, be implemented as shown on the plan at Appendix D to the re... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies