Kent County Council (KCC) developed a scheme to reduce congestion at the crossroads in Wateringbury, A26 Tonbridge Road / Bow Road / Red Hill. The junction is used by vehicles aiming to travel between Maidstone, Tonbridge, Nettlestead and East Malling and a number of pedestrians accessing the local amenities. However, the anticipated costs for this scheme are considerably higher than the available funding. There are few other options that can be implemented at the crossroads.
1.0Introduction and Background
Funding of £300,000 has been allocated from the South East Local Enterprise Partnership (SELEP) to improve the crossroads in Wateringbury to reduce Congestion.
Wateringbury Crossroads is a well-used traffic route and suffers from congestion which leads to pollution. There is limited road space available to make adjustments, but there is some potential to improve capacity at the junction which should see traffic flow more smoothly. The scheme aimed to maximise the potential of the available road-space while making improvements for pedestrians where possible.
The scheme proposed included: A new dedicated right turn lane on the Tonbridge Road heading West towards the junction. A new dedicated left turn lane on the Bow Road heading North towards the junction. This would result in a narrower pavement. Using 0.5m of Parish land to widen the junction, allowing a vehicle to turn right into Bow Road without impeding the traffic behind. Pedestrian phases added to the two remaining arms of the crossing Improved traffic signal technology allowing ‘reactive’ management of the lights to optimise traffic flows. Re-surfacing of carriageway and footways. May result in the loss of three trees on the Tonbridge Road to accommodate widening. Can be mitigated with replacement tree planting.
2.0The expected benefits The traffic modelling for the scheme shows that there would be a 50% increase in capacity. However, this would still leave the junction at -20% practical reserve capacity in the AM peak and -14% in the PM peak. Therefore, after any changes are made the junction it will be operating as efficiently as possible but is likely queues will remain at peak times – albeit shorter queues than the current situation.
The proposed scheme offers the best improvement in capacity possible at the junction which Officers have been able to identify within the land available. This is due to the close proximity of the buildings which means additional engineering measures are not currently feasible.
3.0Programme for the works
It is expected the works would take up to 30 weeks to complete with considerable disruption to the local road network. This includes up to 15 weeks to divert the utilities.
4.0The cost
Initial estimates from the utility companies came in at a prohibitively high price. Further development work with the utility companies and trial holes were undertaken to give greater clarity of the expected cost to deliver the scheme. Although the estimates were reduced considerably; the utility diversion costs alone are expected to be around £250,000
Total cost to deliver the scheme including contingency = £868,000
To date a total of £56,000 has been spent on design development. To carry out the scheme this leaves a funding shortfall of £624,000 to deliver the scheme. There is no funding stream currently identified to meet that shortfall.
5.0The alternative option
KCC have explored the potential to upgrade the traffic signals at the crossroads at a lower cost to a full scheme. This would include upgrading controlled pedestrian crossings from far- sided pelican to near-sided puffin type and to implement Microprocessor Optimised Vehicle Actuation (MOVA) control strategy.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Wateringbury CrossroadsReport | 484 KB | DownloadRead as text |
Follow Joint Transportation Board at Tonbridge and Malling and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 2 Dec 2024 | Parking UpdateThat the current progress and approach to the Parking Team’s work programme, be noted. | Noted | Open |
| 2 Dec 2024 | Parking Action Plan, Access Group 9That the decision of the Cabinet Member for Transformation and Infrastructure to set aside the objections attached at... | Noted | Open |
| 17 Jun 2024 | Scope of the Joint Transportation Board and local/public transportThat consideration be given to the scope of the Joint Transportation Board at the next meeting. | Decided | Open |
| 21 Nov 2022 | Proposed Single Yellow Line Waiting Restrictions - Oldbury LaneThat the Traffic Regulation Order for double yellow lines be implemented on Old Lane Only, as shown in the plan at Ap... | Decided | Open |
| 6 Jun 2022 | Proposed 40mph Speed Limit - B2016 Seven Mile Lane, MereworthThat the 40mph speed limit on the B2016, Seven Mile Lane, be implemented as shown on the plan at Appendix D to the re... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.