Resolved
RESOLVED : That planning permission be GRANTED in accordance with the submitted details, conditions, reasons and informatives set out in the report, and supplementary report, of the Director of Planning, Housing and Environmental Health, subject to (1) the amendment of condition 4 to read as follows: 4. No above ground development shall take place until a scheme of hard and soft landscaping and boundary treatment has been submitted to and approved by the Local Planning Authority. The scheme shall include appropriate measures to ensure all hard surfacing is reflective of the rural character of the locality whilst being of a suitable type to withstand vehicle movements including refuse vehicles and maintain its quality in the long term. All planting, seeding and turfing comprised in the approved scheme of landscaping shall be implemented during the first planting season following occupation of the buildings or the completion of the development, whichever is the earlier. Any trees or shrubs removed, dying, being seriously damaged or diseased within 10 years of planting shall be replaced in the next planting season with trees or shrubs of similar size and species, unless the Authority gives written consent to any variation. Any boundary fences or walls or similar structures as may be approved shall be erected before first occupation of the building to which they relate. Reason: In the interests of visual amenity. and (2) the addition of conditions 12. Prior to the commencement of the development hereby approved, arrangements for the management of all construction works shall be submitted to and approved by the Local Planning Authority. The management arrangements to be submitted shall include (but not necessarily be limited to) the following: · The days of the week and hours of the day when the demolition and construction works will be limited to and measures to ensure these are adhered to; · Procedures for managing all traffic movements associated with the construction works including (but not limited to) the delivery of building materials to the site (including the times of the day when those deliveries will be permitted to take place and how/where materials will be offloaded into the site) and for the management of all other construction related traffic and measures to ensure these are adhered to; and · The specific arrangements for the parking of contractor’s vehicles within the site during construction and any external storage of materials or plant throughout the construction phase. The development shall be undertaken in full compliance with the approved details. Reason: In the interests of residential amenity and highway safety in accordance with Policy CP24 of the Tonbridge and Malling Borough Core Strategy 2007. 13. Development shall not begin in any phase until a detailed sustainable surface water drainage scheme for the site has been submitted to (and approved in writing by) the local planning authority. The detailed drainage scheme shall demonstrate that the surface water generated by this development (for all rainfall durations and intensities up to and including the climate change adjusted critical 100 year storm) can be ... view the full minutes text for item AP1 20/16