That planning permission be GRANTED in accordance with the submitted details, conditions, reasons and informatives set out in the report of the Director of Planning, Housing and Environmental Health. [Speakers: [name removed] (verbal statement) and [name removed] (written statement read by Principal Democratic Services Officer) β members of the public; [name removed] (verbal address) and [name removed] (verbal address) β agents for application (A) and (B) respectively.]
Word for word from the decision Tonbridge and Malling published for this meeting.Source: democracy.tmbc.gov.uk
East Malling & 10 February 2020 (A)TM/20/00311/FL Larkfield 22 June 2020 (B)TM/20/01136/FL Larkfield North
Proposals: (A)Installation of 16 x light fittings on 6 x 15 metre high masts to light football pitch to the required FA standard of 200 lux
(B)Creation of hardstanding area adjacent to pavilion, creation of tarmac pathway around football pitch, erection of 2no. spectator stands, 2 no. dugouts and a paybooth Location: 251A New Hythe Lane Larkfield Aylesford Kent ME20 6PU Go to: Recommendation
1. Description
Application A: TM/20/00311/FL (floodlighting)
1.1A total of 6no. lighting masts are proposed along the edge of the existing pitch, each 15m high. Three of the six masts are proposed alongside the western side of the playing area, which is 95m long, and the other three opposite them on the eastern side, spaced at approximately 30m intervals. The two central masts would each support two light fittings and the other four masts three each.
1.2The application is supported by a Technical Report by lighting design specialists. This sets out that the floodlights are intended to be used on average one day per week, on a Monday to Friday evening, to no later than 10.15pm, with occasional use on a Saturday afternoon between 2pm and 6pm, if lighting is needed because of weather conditions. Lighting is to be operated by an automatic timer arrangement system.
1.3Retrospective planning permission is sought by this planning application for various elements of operational development connected to the activities at the Club, as follows:
1.4A new area of tarmac hardstanding area has been formed in the southeast corner of the site, to the north and east of the pavilion, up to the edge of the playing area, covering an area which was previously laid to hardcore.
1.5A new 1m wide tarmac pathway has been laid alongside the whole of the eastern and southern edges of the playing area and approximately half of the western side.
1.6Two spectator stands have been constructed, each are 7m wide and comprise an open framework of metal stanchions, painted yellow. Each has a roof and rear wall in corrugated metal sheeting. One stand is for standing spectators. This is 2m
Part 1 Public Area 3 Planning Committee
deep and is located on the west side of the pitch, about midway between the goal line and the centre line. The shallow-pitched roof rises from 2.54m (rear) to 2.64m (front). The other stand provides seats for 49 spectators in five raked rows. The stand is 3m deep and is located on the east side of the pitch, just north of the centre line. The shallow-pitched roof rises from 2.95m (rear) to 3.05m (front).
1.7The two dugouts are each 4m wide by 1m deep and 1.9m high, with a roof and rear face, but otherwise open, and each providing eight seats. They are located on the west side of the pitch, on either side of the halfway line.
1.8The paybooth is a detached prefabricated kiosk, with dimensions of 1.2m by 2.4m by 2.24m high. It is currently in a temporary location but is intended to be moved to the west of the pavilion building.
1.9In support of the application, the submitted Planning Statement advises that
βthe main objectives for the proposal are to provide a ground to the standard FA requirements, to allow Step 5 football to be played and thereby enhance the level of football provided in the local community. The FA stipulate that the ground must provide covered seating for 50 spectators, covered standing for 50 spectators and 2 dugouts to accommodate 8 people. It also requires a paved area around at least 2 sides of the pitch (at least 1m wide) and between the pitch and the changing area (located in the pavilion)β
1.10Further supporting information provided during the course of the submission is summarised as follows:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.