Resolved
That the content of the report be noted.
Joint Transportation Board noted this item on Monday 20 September 2021. Below is the council's own wording, with the papers it was decided on.
Resolved
That the content of the report be noted.
This paper provides an update on the DfT’s Emergency Active Travel Fund relating to the Tonbridge town-wide 20mph limit trial and specifically the feedback received to the public consultation.
This report is for information only and will be followed by a full report with project recommendations at a future JTB meeting.
1.1Kent County Council (KCC) was awarded £1.6 million from the Department for Transport’s (DfT) Emergency Active Travel Fund (EATF) (tranche 1) to invest in walking and cycling initiatives across the county. This was in response to the Covid 19 pandemic and the social distancing restrictions that were in place, which reduced the capacity of public transport.
1.2Demand for cycling has been growing nationally, with cycling retailers experiencing high demand over the past 18 months. There has been an increasing demand across the county for town-wide and area specific 20mph schemes too. In response to the opportunity of EATF a decision was made by the KCC Cabinet Member for Highways and Transportation to progress East and West Kent town-wide trials, to assess how these schemes work for large scale areas before similar schemes are considered elsewhere. Tonbridge and Faversham towns were chosen as the trial areas.
1.4Due to the ‘emergency’ nature of the fund, the DfT informed all highway authorities that works must be started within four weeks of providing the funding, and then completed within eight weeks which meant the “go live” date for the trial needed to be in place by 18 September 2020.
1.5The trial was introduced through an Experimental Traffic Regulation Order (ETRO) which can be utilised for 18 months if required. This allows for changes to the highway to be implemented quickly and consulted on throughout the trial, whilst the public are experiencing the change. It also means KCC can test the impact and monitor to see how it performs. 1 1.6 The trial 20mph zone was agreed following discussion with the Leaders and respective portfolio holders of both KCC and Tonbridge and Malling Borough Council (TMBC). The zone was defined on the ground using signing and road markings alone. No traffic calming measures such as buildouts or road cushions/humps were installed.
1.7The aim of the town-wide 20mph speed limit is to encourage active travel by reducing vehicle speeds, which helps to support the sharing of road space with cyclists, especially where other dedicated measures can’t be provided due to a lack of available highway land and other constraints. This scheme can support walking and cycling, as part of a range of network improvements which will be confirmed in the forthcoming borough Active Travel Strategy.
1.8Supporting walking and cycling especially for local journeys can also help to improve physical and mental health, reduce traffic congestion, contribute towards improved air quality and compliment ongoing infrastructure upgrades which include the recently opened cycle hub at Tonbridge Station.
1.9The success of the trial will be determined by analysing several sources of information, which include pre, during and post-trial surveys and other monitoring data: Consultation feedback (1,123 responses received) Attitudinal surveys (face to face questionnaires – approx. 600). Pedestrian counts in certain locations Cycle counts in certain locations Average speeds in certain locations Crash collision data although this ideally would need to be over a longer period, usually 3 years. Air quality although this ideally would need to be analysed over a longer period as many factors can affect air quality. There are only air quality monitoring stations in Tonbridge High Street presently and none in Faversham.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Plan of extent of Townwide 20mph trial area (002) 21/26Appendix A | 5.6 MB | Download |
PDF |
Tonbridge Town wide 20mph consultation questionnaire_ (002) 21/26Appendix B | 477 KB | Download |
PDF |
Consultation feedback report 21/26Appendix C | 1 MB | Download |
PDF |
Additional appendices to consultation feedback report: appendices 1-6 21/26Appendix D | 1.8 MB | Download |
PDF |
Tonbridge Town: 20 mph Zone TrialReport | 227 KB | DownloadRead as text |
Follow Joint Transportation Board at Tonbridge and Malling and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 2 Dec 2024 | Parking UpdateThat the current progress and approach to the Parking Team’s work programme, be noted. | Noted | Open |
| 2 Dec 2024 | Parking Action Plan, Access Group 9That the decision of the Cabinet Member for Transformation and Infrastructure to set aside the objections attached at... | Noted | Open |
| 17 Jun 2024 | Scope of the Joint Transportation Board and local/public transportThat consideration be given to the scope of the Joint Transportation Board at the next meeting. | Decided | Open |
| 21 Nov 2022 | Proposed Single Yellow Line Waiting Restrictions - Oldbury LaneThat the Traffic Regulation Order for double yellow lines be implemented on Old Lane Only, as shown in the plan at Ap... | Decided | Open |
| 6 Jun 2022 | Proposed 40mph Speed Limit - B2016 Seven Mile Lane, MereworthThat the 40mph speed limit on the B2016, Seven Mile Lane, be implemented as shown on the plan at Appendix D to the re... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.