That (1) a 30mph speed limit be reintroduced in Shipbourne Road to the previous extents prior to the trial; (2) subject to a separate consultation being undertaken, the 30mph gateway on Shipbourne Road near Willow Lea be extended further north to cover Whistler Road, Cherry Tree Road, Horns Lodge Lane and Shandon Close; (3) the 20mph speed limit be retained at Sites 1 & 2 Brook Street, Site 11 The Ridgeway and Site 14 Yardley Park Road; (4) a 30mph speed limit be reintroduced to the previous extents prior to the trial at Site 3 A26 Quarry Hill Road, Sites 4 & 5 Pembury Road and Site 8 B245 London Road; (5) officers investigate whether additional complementary measures could be implemented to support the extended 20mph zone; and (6) a targeted behavioural change campaign to promote the benefits of lower speeds to all road users be undertaken to raise awareness, increase knowledge and positively influence intended behaviours.
Word for word from the decision Tonbridge and Malling published for this meeting.Source: democracy.tmbc.gov.uk
This paper provides an update on the Tonbridge town-wide 20mph limit trial that was funded by the Department for Transport’s Emergency Active Travel Fund.
This report is intended to enable discussion and to consider and debate the officer recommendation.
Background
1.1Kent County Council (KCC) was awarded £1.6 million from the Department for Transport’s (DfT) Emergency Active Travel Fund (EATF) (tranche 1) to invest in walking and cycling initiatives across the County. This was in response to the Covid 19 pandemic and the social distancing restrictions that were in place, which reduced the capacity of public transport and sought to promote more active travel.
1.2Demand for cycling has been growing nationally, with cycling retailers experiencing high demand over the past 18 months. There has been an increasing demand across the County for area wide 20mph schemes. In response to the opportunity that the EATF presented a decision was made, by the KCC Cabinet Member for Highways and Transportation, to progress East Kent and West Kent town-wide trials. The project would enable KCC to assess how these schemes work for large scale areas before similar schemes are considered elsewhere. Tonbridge and Faversham town were chosen as the trial areas.
1.4Due to the ‘emergency’ nature of the fund, the DfT informed all highway authorities that works must be started within four weeks of providing the funding, and then completed within eight weeks which meant the “go live” date for the trial needed to be in place by 18 September 2020. This was particularly challenging and took place during the height of the pandemic.
1.5The trial was introduced through an Experimental Traffic Regulation Order (ETRO) which can be utilised for 18 months if required. This allows for changes to the highway to be implemented quickly with consultation taking 1 place throughout the trial, whilst the public are experiencing the change. It also means KCC can test the impact and monitor to see how it performs. Another benefit of using an ETRO is that it allows for changes to be made during the trial as long as additional roads are not added, as these would not have been consulted on.
1.6The trial 20mph zone was agreed following discussion with the Leaders and respective portfolio holders of both KCC and Tonbridge and Malling Borough Council (TMBC). The zone was defined on the ground using signing and road markings alone. No traffic calming measures such as buildouts or road cushions/humps were installed.
1.7The aim of the town-wide 20mph speed limit is to encourage active travel by reducing vehicle speeds, which helps to support the sharing of road space with cyclists, especially where dedicated measures cannot be provided due to a lack of available highway land and other constraints. This scheme can support walking and cycling, as part of a range of network improvements which will be confirmed in the forthcoming borough Active Travel Strategy.
1.8Supporting walking and cycling especially for local journeys can also help to improve physical and mental health, reduce traffic congestion, contribute towards improved air quality and compliment ongoing infrastructure upgrades which include the recently opened cycle hub at Tonbridge Station.
1.9The success of the trial will be determined by analysing several sources of information, which include pre, during and post-trial surveys and other monitoring data:
Consultation feedback (1,123 responses received) Attitudinal surveys (face to face questionnaires – approx. 600). Pedestrian counts in certain locations Cycle counts in certain locations Average speeds in certain locations Crash collision data although this needs to be over a longer period, usually 3 years.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Joint Transportation Board at Tonbridge and Malling and we tell you when its next papers are published, before the meeting rather than after it.
Parking Action Plan, Access Group 9That the decision of the Cabinet Member for Transformation and Infrastructure to set aside the objections attached at...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.