RESOLVED : That planning permission be GRANTED in accordance with the submitted details, conditions, reasons and informatives set out in the report of the Director of Planning, Housing and Environmental Health; subject to (1) Additional Conditions: 26. The scheme of photovoltaic panels and air source heat pumps specified within section 4 of the Energy Strategy shall be installed on each building prior to its first occupation and shall be retained at all times thereafter. Reason: In order to reduce greenhouse gas emissions in accordance with paragraph 154 of the National Planning Policy Framework. 27. None of the buildings shall be occupied until electric vehicle charging points have been installed in accordance with details that have first been submitted to and approved by the Local Planning Authority. Reason: In order to help reduce vehicle emissions in the interests of air quality and in accordance with paragraph 112 of the National Planning Policy Framework 2021. 28. The cycle storage facilities shown on the approved plan shall be installed prior to the first occupation of the buildings hereby approved. Reason: In order to facilitate sustainable transport choices for the occupiers of the development, in the interests of highway safety and in accordance with paragraph 112 of the National Planning Policy Framework 2021. [Speakers: [name removed], agent]
Word for word from the decision Tonbridge and Malling published for this meeting.Source: democracy.tmbc.gov.uk
Aylesford 25 October 2021 TM/21/02866/FL Aylesford South
Proposal: Construction of five buildings to provide six units for industrial processes (Use Class E(g)(iii)); industrial (Use Class B2); and/or storage and distribution (Use Class B8)) purposes, with ancillary offices and associated landscaping, car parking, servicing and access arrangements Location: Land East Of Little Preston Yard And North Of M20 Coldharbour Lane Aylesford Kent Go to: Recommendation
1. Description:
1.1Permission is sought for a development of approx. 28,000 sqm of commercial floor space (industrial or warehousing) including small areas of ancillary office accommodation inside each unit. In all, six no units are proposed arranged in five distinct buildings.
1.2Three of the larger buildings would be arranged along the southern part of the site adjacent to the east bound carriage of the M20 at jct 5, with the three remaining units located towards the northern end of the site.
1.3The individual units would range in size from the largest having 10,1271 sqm of floor space to the smallest one having 1,272 sqm of floor space. They would take the form of modern warehouse buildings, clad with different types of metal cladding and glazed curtain walling and each having a shallow pitched roof form. The buildings would range in height from 12.8m for Units 5 & 6 to 18.2m for Unit 2 (the largest one in the development). Each unit would have a solar PV array located on the roof above the office element and make use of air source heat pumps.
1.4The development would be accessed of Coldharbour Lane close to its junction with the Jct 5 roundabout of the M20. The access currently serves a commercial property and the National Highways depot site. A total of 337 car parking spaces would be provided for the development. Cycle storage would also be provided for each unit.
2. Reason for reporting to Committee:
2.1Given the balance to be struck between diverging and significant material planning considerations.
3. The Site:
3.1The site measures approx. 6.7ha in area (19 acres) and lies outside the defined urban confines of the Medway Gap settlement. It lies immediately north of the
Part 1 Public 14 July 2022 Area 3 Planning Committee
M20, west of Junction 5. The existing National Highways depot and a separate commercial site lie immediately to the west of the site between it and Coldharbour Lane from which the site would be accessed.
3.2The site contains an area of Ancient Woodland (AW) at its western end adjacent to where the access enters the main body of the site. The remaining site is agricultural with the AW almost separating a larger field at the southern end of the site from a smaller located to the north. A separate (larger) area of AW adjoins the site to the northeast.
3.3A section of the Medway Valley walk (PROW MR479) bisects the site in an east/west orientation and follows the north edge of the AW within the site and the southern edge of the Aw that lies outside it. The northern edge of the site is bound by the Medway Valley railway line.
3.4The land within the site undulates gently in the main, with the highest land located in the southwest corner, which then drops away to the east and north. The land rises steeply at its western end just beyond the Highways England depot from north to south where an existing field gate is located. Indeed the land all around the southwest corner of the AW within the site rises sharply to the south.
4. Planning History (relevant):
TM/21/02437/EASC screening opinion EIA 21 September 2021 not required Request for Screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2011:To provide up to 27,500sqm (GIA)of employment space across seven units ranging between 13m and 18m in height.
5. Consultees:
5.1National Highways: see Appendix 1 for full comments
5.2KCC (H&T): See Appendix 2 for full comments
5.3KCC (PROW): See Appendix 3 for comments
5.4KCC (SUDS): See Appendix 4 for comments
5.5KCC (Ecology): See Appendix 5 for comments
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.