TM/26/00424/DR3 - Erection of a new leisure centre to facilitate the relocation of the Angel Leisure Centre

Decided Committee 3 papers

AI summaryCouncil agrees to grant planning permission for a new leisure centre on the Sovereign Way Mid Car Park, to replace the Angel Centre, subject to biodiversity, flood risk and other conditions.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeDecidedSubject to conditions and delegated issue
MoneyNot stated
What happens nextDirector to issue decisionAfter revised BNG metric and KCC ecology sign-off
Who it affectsNot stated

What was decided

The Council resolved to grant planning permission for a new leisure centre on the Sovereign Way Mid Car Park to replace the Angel Centre, subject to the conditions and requirements set out in the report. Report 7.1

Issue of the decision is delegated to the Director of Planning, Housing and Regulatory Services, in consultation with the Mayor as chair of the Planning Committee, once a revised biodiversity net gain metric is received and Kent County Council's Ecological Advisory Service is satisfied with it. Report P2, P3, P4

Why

The Borough Council is the applicant and the proposal is for a replacement leisure centre, with the existing Angel Centre to remain in use until the new one is operational. Report P2

Conditions cover time limits, contamination and piling risks, flood risk, construction traffic, materials, sustainable drainage, lighting and landscaping, and require development in line with the approved plans and supporting documents. Report P7, P9, P16, P28, P32, P36, P40, P42, P50, P52

What happens next

A revised baseline biodiversity net gain metric must be submitted and Kent County Council's Ecological Advisory Service must be satisfied with it before the decision is issued. Report P2, P3

Pre-commencement requirements include a contamination strategy, a construction traffic management plan, a scheme showing the ground floor slab is no lower than 23.05 metres above Ordnance Datum, and a sustainable surface water drainage scheme. Report P16, P31, P32, P42

The development must begin within three years of the date of the permission, in accordance with the approved plans and documents listed in the conditions. Report P7, P9, P10, P11

Options considered

  • Chosen: Grant planning permission subject to conditions and delegated issue. Recommended by officers as set out in the report Report 7.1, P2, P3, P4

Implications

  • Environment and climate: Development must deliver a biodiversity net gain, with a revised baseline metric required and Kent County Council's Ecological Advisory Service to confirm satisfaction before the decision is issued. Report P2, P3
  • Risk: Conditions require investigation and remediation of potential land contamination, restrictions on piling without a piling risk assessment, and notification of any previously unidentified contamination found during construction. Report P16, P17, P18, P19, P26, P28
  • Environment and climate: Flood risk is managed by requiring a scheme showing the ground floor slab is no lower than 23.05 metres above Ordnance Datum and a sustainable surface water drainage scheme with verification. Report P31, P32, P42, P48

Who and where

  • Users of the existing Sovereign Way Mid Car Park, which is the site of the proposed new leisure centre Report P2
  • Visitors and users of the existing Angel Centre, which will remain in use until the new leisure centre is operational Report P2
  • Nearby residents and road users affected by construction traffic and deliveries Report P36, P37

Timeline

  • 2026-07-14: Council meeting resolves to grant planning permission subject to conditions
  • 2027 to 2032: Approved Travel Plan period set out in the supporting documents Report P11
  • Within three years of the date of permission: Development must be begun, in line with Section 91 of the Town and Country Planning Act 1990 Report P7, P8

Plain English for the jargon

  • BNG: Biodiversity Net Gain, a way of measuring the improvement to habitats from a development
  • CTMP: Construction Traffic Management Plan, a plan for managing construction vehicle routes, parking and deliveries
  • SuDS: Sustainable Drainage Systems, ways of managing surface water that reduce flood risk
  • NPPF: National Planning Policy Framework, the government's planning policy guidance for England
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
ItemC 26/69

Resolved

RESOLVED : ... view the full minutes text for item C 26/69
Word for word from the decision Tonbridge and Malling published for this meeting. Source: democracy.tmbc.gov.uk

Follow this further

Built from Tonbridge and Malling's papers

What the report saysPro

Report to Council

Planning Committee

Tonbridge 14 July 2026 TM/26/00424/DR3 Cage Green and Angel

Proposal: Erection of a new leisure centre to facilitate the relocation of the Angel Leisure Centre

Location: Sovereign Way Mid Car Park Sovereign Way Tonbridge Kent TN9 1RG

Go to: Recommendation

1. Description:

1.1Permission is sought by the Borough Council to build a new leisure centre on the site of the existing Sovereign Way Mid Car Park. The new leisure centre will replace the existing Angel Centre which will remain in use until the new centre is operational.

1.2At ground floor level, the new centre will contain a four court/community hall, 3 studios, two of which can be opened up to become one larger space, either for leisure or other community use. A soft play area will also be accommodated, as well as a wellness hub. In addition to these primary facilities, a reception area, plant room, kitchen, servery, changing rooms and stores will also be provided at ground floor level.

1.3At first floor level, a gym and dedicated spin studio will be provided, together with larger changing rooms.

1.4Access to the building will be via a ramp and separate stepped access at the north end of the building via the footpath MU35. Internally, access to the upper floor will be provided by a main staircase and lift located at the northern end of the building and a secondary staircase located at the south end of the building.

1.5The building will have a wedge-shaped plan form with the north elevation being wider than the southern one facing Avenue de Puy. The primary building material will be red brick with panels of living wall on the south and east elevations as well as panels of grey rain screen cladding also being present on the north, east and south elevations. Large areas of glazing will feature on the east elevation and to a lesser extent on the northern side. The single storey entrance lobby located on the north side will be highly glazed with entrances on both east and west elevations.

1.6Whilst brick will be the predominant material, it will be used in different ways to achieve subtle changes in the appearance of certain walls. Sections of hit and miss brick panels will be present around the base of the building to create a void

Part 1 Public Planning Committee

should the area flood. The building will also feature recessed panels of stacked brickwork and hit and miss panels as well to add tone and texture to the larger walls of the building.

1.7An area of landscaping will be present along the western side of the building. This is now to be landscaped as a wildflower meadow, containing trees and a play trail.

1.8No car parking will be provided on site but a bank of cycle parking will be located outside the south east corner of the proposed building.

2. Reason for reporting to Council:

2.1In accordance with the Council’s constitution.

3. The Site:

3.1The site is located within the urban confines of Tonbridge, within the town centre. The site forms part of the East of High Street Masterplan (Adopted June 2025) (Parcel E01) and measures 0.29ha in area. It is allocated for a new leisure centre. The site is bound by Sovereign Way to the north east, Avenue Du Puy to the south east, PROW MU35 to the north west and south west (with the car park serving the existing Angel Centre immediately beyond that). The Botany and Gas Works Streams lie to the north of the site and footpath MU35.

3.2The site is currently laid out and used as a public car park (Sovereign Way Mid) containing 112 car parking spaces. A market also takes place on the site on a Sunday.

4. Planning History (relevant):

TM/04/01461/FL Grant With Conditions 22 July 2004

Change of use from car park to Sunday market

TM/04/01469/AT Refuse 31 August 2004

Free standing pole mounted sign

TM/21/00506/FL Approved 26 March 2021

Change of use from car parking to Saturday's Traders Market

Part 1 Public Planning Committee

5. Consultees:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
09.01 Map 26/69Plan 6.6 MB Download
PDF
Supplementary report of Director of Planning, Housing and Regulatory Services 26/69Supplementary 60 KB Download
PDF
TM/26/00424/DR3: Erection of a new leisure centre to facilitate the relocation of the Angel Leisure CentreReport 236 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

39 of 44 attended
KT
Councillor Kim TannerChair, present
SH
Councillor Sarah HudsonVice-Chair, present
LA
Councillor Lee AthwalCommittee Member, present
BB
Councillor Bill BanksCommittee Member, apologies
KB
Councillor Kath BartonCommittee Member, apologies
MS
Councillor Mrs Sue BellCommittee Member, present
AB
Councillor Angus BennisonCommittee Member, present
RB
Councillor Robin BettsCommittee Member, present
TB
Councillor Timothy BishopCommittee Member, present
MB
Councillor Matt BoughtonCommittee Member, present
PB
Councillor Paul BoxallCommittee Member, present
GB
Councillor Garry BridgeCommittee Member, present

All 44 on the meeting page

More from Tonbridge and Malling Council

All decisions
MeetingDecisionOutcome
3 Sep 2026 MinutesThat the of the proceedings of the meeting of the Council held on 14 July 2026 be approved as a correct record and si... Approved Open
3 Sep 2026 Scheme of Allowances - Special Responsibility Allowances for Chair/Vice-Chair of Planning CommitteeRESOLVED : That (1) the Special Responsibility Allowance payable to the Chair of the Planning Committee be set at £5,... Agreed Open
3 Sep 2026 Changes to Committee Appointments 2026/27RESOLVED : That Cllr L Chapman replace Cllr R Dalton as a Conservative appointment to the Planning Committee for the ... Decided Open
3 Sep 2026 Local Code of Corporate GovernanceRESOLVED : That the updates and amendments to the Local Code of Corporate Governance (Annex 1) be approved and adopted. Approved Open
3 Sep 2026 Treasury Management Performance Update and Annual Report for 2025/26RESOLVED : That (1) the action taken by Officers in respect of Treasury Management activity for April to May 2026 be ... Noted Open