Resolved
That the application be Granted subject to the conditions as set out in the report.
Plans Committee decided this item on Thursday 4 February 2021. Below is the council's own wording, with the papers it was decided on.
Resolved
That the application be Granted subject to the conditions as set out in the report.
Committee Report –
© Application Number: Crown copyright and database 1/0992/2020/FUL rights 2012 Ordnance Survey 100022736
Registration date: 4 November 2020
Expiry date: 30 December 2020
Applicant: [name removed]: Sherry Consultants
Case Officer: Tracey Blackmore
Site Address: Field Known As 'Dougies Field', Shebbear, Devon,
Proposal: Foul & surface water drainage to serve previously approved development relating to 1/0795/2017/OUT
Recommendation: Grant
© Crown copyright and database rights 2021 Ordnance Survey 100022736 Reason for referral:
This application has to be determined by Planning Committee as the applicant is a member of staff at Torridge District Council.
Relevant History:
Application No. Description Status Closed 1/0044/2017/OUT Outline planning permission WDN 31.05.2017 for up to 5 dwellings with all matters reserved 1/0795/2017/OUT Outline planning permission PER 16.08.2018 for up to 8 dwellings with all matters reserved 1/0844/2020/REM Reserved matters application PDE for access, appearance, landscaping, layout and scale for 7 no. dwellings pursuant to permission 1/0795/2017/OUT
Site Description & Proposal
Site Description:
The application site is located approximately 1km from the centre of the village of Shebbear. The application site currently is an open field, and measures approximately 0.3 hectares. The site has a mature hedgerow to the northern, eastern and western boundaries which includes mature trees. The southern boundary consists of post and rail fence with some mature trees.
A field access serves the site and is located to the northern boundary, which provides access onto the adjacent classified highway.
Proposed Development:
This application is seeking detailed planning permission for the foul and surface water drainage to the development for up to 8 dwelling previously granted outline planning permission 1/0795/2017/OUT.
Additionally, this application seeks the discharge of and/or compliance of condition 4 (details of foul and surface water drainage) pursuant to outline planning permission 1/0795/2017/OUT.
The reserved matters application for access appearance, landscaping, layout and scale to 1/0795/2017/OUT is dealt with via a separate Reserved Matters Application (1/0844/2020/REM) is also before Members.
The foul and surface water drainage matters require a separate planning application as it is outside of the application site (red outline) of the outline planning permission.
A Drainage Strategy was submitted in support of this application confirming that the foul drainage will be disposed of by a new Package Treatment Plant. The position of the Package Treatment Plant is shown on drawing number S20/20-01A to the south of the dwellings. The Surface Water drainage will be a flood storage pond. The flood storage Pond has been designed in accordance with “Sustainable Drainage Systems, Guidance for Devon”.
Consultee representations:
Shebbear Parish/Town Council: No objections.
The Environment Agency: Having reviewed the details, it appears that the Environment Agency is not a statutory consultee for this application, so we will not be providing a formal response on this application.
The Environment Agency is only a statutory consultee for non-mains drainage when the application is for major development. Applications for non-mains drainage are dealt with by the local planning authority in line with guidance we have provided on non-mains drainage from non-major development.
Environmental Protection Officer: 1st response – 11th November 2020. In relation to the above application, the Environmental Protection Team has reviewed the foul drainage provision. The information provided indicates that the proposed development will be served by a sewage treatment plant discharging to a stream. DEFRA's General Binding Rules state that a watercourse must normally have a continual flow. The Authority will need to be satisfied that the receiving watercourse has a continual flow in order to ensure compliance with DEFRA guidance.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Application No. 1/0992/2020/FULReport | 339 KB | DownloadRead as text |
Follow Plans Committee at Torridge and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 30 Jul 2026 | Application No. 1/0001/2026/FULMResolved – That the ... view the full minutes text for item 288. | Decided | Open |
| 30 Jul 2026 | Application No. 1/0386/2026That the application is approved subject to the conditions outlined in the report. A recorded vote was taken. COUNCIL... | Approved | Open |
| 30 Jul 2026 | Application No. 1/0258/2026/FULThat the application be approved, with an informative added for solar, rainwater capture and heat pump provision. A r... | Approved | Open |
| 30 Jul 2026 | Planning DecisionsResolved - That the Planning decisions for the period 23 rd June 2026 – 15 th July 2026 be noted. | Noted | Open |
| 2 Jul 2026 | Planning DecisionsResolved - That the Planning decisions for the period 20/5/2026 – 23/6/2026 be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.