Torridge District Council
Full Council, Monday 5 September 2022 at 6.30pm

Brunswick Wharf Land Release Fund

Agreed Committee 2 papers

Full Council agreed this item on Monday 5 September 2022. Below is the council's own wording, with the papers it was decided on.

Item58

Resolved

That before entering into a Grant Agreement with Red Earth for the use of the £797,000 LRF grant, the conditionality required by DLUHC and the One Public Estate team be put in place and the Council’s position in relation to grant claw back be protected prior to drawing down the grant. (Vote: For – 24, Abstentions – 3)
Word for word from the decision Torridge published for this meeting. Source: democracy.torridge.gov.uk

Follow this further

Built from Torridge's papers

What the report saysPro

Report to Full Council

Reference: Bideford Brunswick Wharf

Date: 3.6.19

Harbour Wall. Aide Memoire:

Location:

Design: Remediation design and specification proposals were put forward by John Grimes Partnership (JGP) acting for both the Developer and the Authority.

Page |1 The initial proposals were as described by annotated JGP’s drawings: • 14466 201 P1 • 14466 202 P2 • 14466 203 P2 • 14466 204 P2 • 14466 205 P2 Drawings under separate cover. These propose several degrees of associated and related forms of remediation as noted below to the existing harbour wall of varying height of the order of 5m above the sediment layer for a length of the order of 170m with a 4m (approx.) return , namely: • Repair type 1. Catering for masonry face strengthening and replacement and fixing back to harbour wall substrata • Repair type 2. Catering for repointing and fixing back to harbour wall substrata • Harbour wall upgrade including retention via ‘dead man’ block. This is located at the optimal position whilst remaining outside the development demise. T and fixing back to harbour wall substrata that is within 7m of harbour wall. New RC Coping.

The total specification above caters for the highest of specifications without a ‘life expectancy’ benchmark being pre-set ,however JGP anticipate this to be of the order of 60 years with minimal maintenance.

The specification caters for : • Stainless steel tie backs, Grade 316 ties at 3m centres horizontally and approximately 2m vertically between ‘dead block’ and wall face with D70 H/W retaining fenders. • Stainless steel grade 316 ties with resin bond at horizontal and vertical 450mm centres. • Stainless steel joint reinforcement • Stone replacement • Marine grade grout and mortar to fill and joints • Weep pipes

Page |2 • Mass concrete ‘dead man’ block for entire length of wall section 2m x 3m deep with SS tie fixings

Construction cost. The cost to undertake the above works was ‘market tested’ with specialist contractors for each of work sections, namely civils works, stone repair and tie drilling and wall construction. The works to be undertaken under a single contract based on an agreed standard industry prime cost form due to the uncertain nature and type of works being undertaken. Budget Costs, Harbour Wall Repair. Stone wall repair: £ £ • Masonry repair 15,550.00 • Re-pointing 4,650.00 • Helical bar fixing 65,100.00 • Drill holes for grout 18,300.00 • Grouting holes 13,250.00 • Grout 45,750.00 • Weep holes 2,300.00 164,900.00

Specialist tie bars: 27mm stainless at 3m spacing per JGP specification £ • Mobilisation 7,000.00 • Horizontal ties 179,200.00 • Horizontal drainage 53,200.00 239,400.00

Civils constructions : £ • Preliminaries 25,600.00 • Excavations 50,800.00

Page |3 • Concrete and backfills 174,300.00 • Temporary works 80,000.00 • Sundries 10,000.00 340,700.00

Fenders: D70 52,700.00 52,700.00

Total } £ 797,700.00

Scope: The scope is based on a total of 112Nº 27mm diameter stainless steel ties each 6.5m in length installed as pairs at 3m centres over the 170m wharf length together with 112Nº 4m long horizontal drains in pairs at 3m centres all as detailed on The John Grimes Partnership drawing Nº205 rev P2.

Ties The ties would consist of 27mm diameter stainless steel thread bars as specified installed with 114mm diameter permanent steel casings installed from commencement level through the existing wall and hearting material terminating in the Deadman block excavation using the ‘odex’ drilled installation system.

The horizontal drains would be drilled using the same method using slotted steel casing, with a suitable slotted plastic well liner installed as specified on completion.

No allowance is made at this stage for rotary core drilling through the face of the wall.

Installation The ties and drainage boreholes would be installed using a drilling unit mounted within a load tested working platform suspended from a suitable telescopic handler standing on the wharf. Compressed air for the drilling

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
13a: Reference Brunswick Wharf 3.6.19Report 347 KB DownloadRead as text
PDF
Brunswick Wharf Land Release FundReport 119 KB Download

At this meeting

Whole meeting

Who was there

26 of 49 attended
TO
Tope OjikutuOfficer, expected
DB
Councillor Doug BushbyChair, present
RB
Councillor Richard BoughtonCommittee Member, present
DB
Councillor David BrentonCommittee Member, apologies
CB
Councillor Chris BrightCommittee Member, present
MB
Councillor Margaret BrownCommittee Member, present
RC
Councillor Rachel ClarkeCommittee Member, present
CC
Councillor Cheryl Cottle-HunkinCommittee Member, present
RC
Councillor R CraigieCommittee Member, present
AD
Councillor Anna DartCommittee Member, apologies
LF
Councillor Len FordCommittee Member, present
JG
Councillor Jude GubbCommittee Member, present

All 49 on the meeting page

On this subject at Torridge

Search all
  1. Brunswick Wharf Land Release FundThis decision
  2. Brunswick Wharf Land Release FundDecided
  3. Brunswick Wharf Land Release FundAgreed
  4. Brunswick WharfDecided
  5. Application 1/1266/2016/ADV - Installation of two temporary for sale boards - Brunswick Wharf, Barnstaple Street, Bideford.Decided

More from Torridge Full Council

All decisions
MeetingDecisionOutcome
27 Jul 2026 Council MinutesThat the minutes of the meeting held on the 22 nd June 2026 be confirmed as a correct record and signed by the Chair.... Decided Open
27 Jul 2026 Written Notice of Motion from Councillor C LeatherThat the Notice of Motion be approved. (Vote: For – Unanimous). The Motion was carried. Approved Open
22 Jun 2026 Council MinutesThat the minutes of the meeting held on 27 th April 2026 be confirmed as a correct record and signed by the Chair. (V... Decided Open
22 Jun 2026 Agreement of Agenda Items Part I and IIThat the agenda as circulated be agreed. (Vote: For, Unanimous) Agreed Open
22 Jun 2026 Northam Neighbourhood PlanThat Full Council: 1. Accept the recommendations of the Examiner in relation to the Northam Neighbourhood Plan, as se... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies