Resolved
That in view of the fact 3 hours had elapsed since the meeting had commenced, that the meeting should continue. (Vote: For – Unanimous) The ... view the full minutes text for item 6f
Plans Committee decided this item on Thursday 25 July 2024. Below is the council's own wording, with the papers it was decided on.
Resolved
That in view of the fact 3 hours had elapsed since the meeting had commenced, that the meeting should continue. (Vote: For – Unanimous) The ... view the full minutes text for item 6f
Committee Report – 25.07.2024
© Application Number: Crown copyright and database 1/1225/2023/FULM rights 2012 Ordnance Survey 100022736
Registration date: 21 December 2023
Expiry date: 21 March 2024
Applicant: Elgin Energy EsCo Ltd
Agent: RPS Consulting Services
Case Officer: [name removed] Address: Land At Ebberley Down, Ebberley, Devon, EX38 7JS,
Proposal: Construction and operation of a grid-connected solar photovoltaic farm, incorporating battery storage, with infrastructure, landscaping and biodiversity enhancements
Recommendation: Grant
© Crown copyright and database rights 2024 Ordnance Survey 100022736 Reason for referral:
The application has called-in by Cllr Lock, as Ward Member, to be heard at Plans Committee. No reasons were specified – none are required in the Council’s Constitution.
Relevant History:
Application No. Description Status Closed 1/0128/1993 ERECTION OF A POLY PER 26.02.1993 TUNNEL FOR HORTICULTURAL USE 1/1394/1995 PROPOSED POLYTUNNEL PER 29.09.1995
Site Description & Proposal
Site Description The application site is located approximately 1.17km to the southwest of the settlement boundary of High Bickington, which is designated as a ‘Local Centre’ and 1.7km to the northeast of Roborough, which is considered a ‘Rural Settlement’ in the adopted North Devon and Torridge Local Plan (NDTLP). The application site is divided into five parcels of greenfield land extending to approximately 30 hectares and is predominantly used for agricultural purposes. The existing site includes hedgerows around the existing agricultural fields with a small parcel of woodland, particularly in the central section of the site.
The site is located within the North Devon Biosphere Transition Area but does not fall within any other allocated land designation. Beaford Moor Site of Special Scientific Interest, is the closest protected designated landscape, located approximately 3.35km to the southwest of the application site and Upcott Wood County Wildlife Site is located approximately 1.9km to the east of the site.
The landscape character for the site falls within ‘Lowland Moorland and Culm Grassland’ (1F) and High Culm Ridge (32). In addition to this, the site falls solely within a Zone 1 Flood Risk and therefore it has less than 1 in 1,000 annual probability of river flooding and is considered a low probability of flooding.
The closest protected heritage assets are located approximately 5 metres to the northeast of the site, known as Dadlands Farmhouse (List Entry: 1326594) and barn, horse engine house, stable, granary and cartshed to southeast of Dadlands Farmhouse (List Entry: 1105044), and are Grade II designated assets. The closest residential properties to the south of the site, are located approximately 333 metres in distance.
There are no public highways or public rights of way that extend through the site. The site is accessed from the public, classified (Class A), highway which forms the southern boundary of the site. There is an unnamed stream that transects the site through the centre and further runs along the southeast boundary of the northern fields.
Proposed Development This application seeks the installation of a photovoltaic (PV) solar farm together with a battery energy storage system, ancillary infrastructure and associated works.
The proposed development seeks the addition of solar PV cells arranged in lines across the existing fields orientated to the south mounted on fixed metal frames to a maximum height of 3.2 metres, spaced at approximately 4.15 meters to minimise overshadowing effects. The solar panels will be arranged in arrays, with full bank and half banks, with either of the following: - Full bank; typically comprising of 60 panels, made up of 2 rows and 30 columns, and; - Half bank; typically comprising of 30 panels, made up of 2 rows and 15 columns
The proposed solar installation will have a generation capacity equating to approximately 27.76MW, with an anticipated project lifespan of 40 years.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Application No. 1/1225/2023/FULMReport | 538 KB | DownloadRead as text |
Follow Plans Committee at Torridge and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 30 Jul 2026 | Application No. 1/0001/2026/FULMResolved – That the ... view the full minutes text for item 288. | Decided | Open |
| 30 Jul 2026 | Application No. 1/0386/2026That the application is approved subject to the conditions outlined in the report. A recorded vote was taken. COUNCIL... | Approved | Open |
| 30 Jul 2026 | Application No. 1/0258/2026/FULThat the application be approved, with an informative added for solar, rainwater capture and heat pump provision. A r... | Approved | Open |
| 30 Jul 2026 | Planning DecisionsResolved - That the Planning decisions for the period 23 rd June 2026 – 15 th July 2026 be noted. | Noted | Open |
| 2 Jul 2026 | Planning DecisionsResolved - That the Planning decisions for the period 20/5/2026 – 23/6/2026 be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.