Holsworthy Leisure Centre . That the investment at Holsworthy leisure centre for decarbonisation and energy efficiency projects be approved. That the replacement of the Holsworthy Pool roof be approved. That the Public Sector Decarbonisation award and the associated funding package for the project be approved and added to the Capital programme accordingly. That the Capital Programme be increased by £1.834m for the cost of the roof and decarbonisation works at Holsworthy Leisure Centre be approved. Town Hall and Old Library That the roof work progress immediately (already approved in capital programme but will need an increase) be approved. That the refurbishment and renovation of the interior of the Town Hall and Old Library be approved and that a lease with Active Torridge for their occupation of part of the building for a term to ... view the full minutes text for item 327.
Word for word from the decision Torridge published for this meeting.Source: democracy.torridge.gov.uk
This summary report sets out the potential for Members to consider opportunity to develop underutilised assets, which would bring them back into a productive and operational use for the growth in leisure services for the district. It comprises the culmination of the constructive collaboration between the Economic Development, Climate, Leisure, Projects and Estates Teams and pulls together evidence of issues associated with some of the Councils existing operational premises and the opportunities that exist for the development of Leisure Services.
1. INTRODUCTION Background
Working together, officers have aligned the operational needs and the anticipated growth of Active Torridge, the opportunity to occupy vacant space and also meeting the need to maintain some deteriorating assets and make a positive contribution towards the Council’s carbon commitment.
The work proposed will require a capital commitment from the Council but will also be substantially funded by external grant funding recently secured by the respective teams.
2. REPORT Holsworthy Leisure Centre
By way of background, Torridge District Council declared a climate emergency on 1st July 2019 and pledged to make the Council carbon neutral by 2030 as part of a Devon-wide carbon reduction plan being organised by Devon County Council.
Whilst a substantial part of the works required can be funded through external grants already secured, the work can only be fully achieved through significant capital investment by the authority. This report sets out in further detail the actual works required or proposed, the likely costs involved and the grant funding available.
As signatory to the Devon Climate Emergency Declaration the Council is committed to reviewing its carbon plan to meet the above target, to reach net-zero for the District by 2050, and to publicly report our carbon emissions every year.
The Council’s carbon footprint shows that the three Active Torridge sites are the biggest contributors to carbon emissions from our properties. In 2023/2024 their emissions were 55% of our Property carbon footprint. Total property emissions – 2023/24 Top 5 Sites (Tonnes CO2 equivalent) Total HOLSWORTHY LEISURE CENTRE 243.7 TORRIDGE LEISURE CENTRE 209.7 TORRINGTON SWIMMING POOL 103.2 APPLEDORE FISHDOCK A and B 77.6 RIVERBANK HOUSE 74.1
As part of the wider Estate Management, opportunities have been considered for reducing the carbon footprint of the entire Leisure operation. The most significant contribution identified related to the replacement of the oil-fired heating plant at Holsworthy Leisure centre and potential operational savings that this might achieve for Active Torridge.
In 2023 Leisure Energy were commissioned by Active Torridge to carry out energy surveys at Holsworthy Leisure Centre, Torrington Swimming Pool and Torridge Leisure Centre. Their report identified energy and carbon saving projects in the form of Energy Conservation Measures (ECMs) for each site. In addition to the ECMs, options for decarbonising the facilities were also provided.
The Public Sector Decarbonisation Scheme (PSDS) offers grant funding for reducing carbon emissions from buildings. Leisure Energy and Active Torridge subsequently developed a bid to this scheme to decarbonise Holsworthy Pool and Torridge Leisure Centre, the two oldest and most inefficient sites. PSDS grants are competitively awarded based on greatest carbon savings, and so Torridge Leisure Centre was dropped from the bid as it weakened our overall case. In November 2023 a £1.17M bid was submitted by Torridge District Council to install an air to water source heat pump at Holsworthy Pool. Funding was granted in May 2024, to be spent by March 2026.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.