CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Torridge District Council
Plans Committee, Thursday 15 May 2025 at 9.30am

1/0072/2025/FUL

Decided Committee 1 paper

Plans Committee decided this item on Thursday 15 May 2025. Below is the council's own wording, with the papers it was decided on.

Item98

Resolved

That the application be granted subject to the conditions outlined in the report.
Word for word from the decision Torridge published for this meeting. Source: democracy.torridge.gov.uk

Follow this further

Built from Torridge's papers

What the report saysPro

Report to Plans Committee

Committee Report – 15 May 2025

© Application Number: Crown copyright and database 1/0072/2025/FUL rights 2012 Ordnance Survey 100022736

Registration date: 12 March 2025

Expiry date: 7 May 2025

Applicant: Holsworthy Men's Shed

Agent: Piper Architecture Ltd

Case Officer: [name removed] Address: Land At Torridge Way, Holsworthy Industrial Estate, Holsworthy, Devon

Proposal: Timber storage shed

Recommendation: Grant

© Crown copyright and database rights 2025 Ordnance Survey 100022736 Reason for referral:

This application relates to land owned by Torridge District Council.

Relevant History:

Application No. Description Status Closed 1/1435/1990 ERECTION OF 9NO PER 20.11.1990 INDUSTRIAL UNITS AND THE PROVISION OF 3NO SERVICED SITES ON LAND TO THE REAR 1/0786/1997 IMPROVEMENTS TO PER 15.07.1997 INDUSTRIAL UNITS AND REVISED CAR PARK LAYOUT 1/0117/2016/FUL Change of use from offices PER 08.04.2016 (Class B1) to outpatient haemodialysis treatment centre (Class D1)

Site Description & Proposal

Site description

The application site is a parcel of land located on the Holsworthy Industrial Estate within the development boundary of Holsworthy. Holsworthy is defined as a main centre in the North Devon and Torridge Local Plan 2011-2031 (NDTLP). The application site is located to the northwest of existing Torridge District Council units to the north of the Industrial Estate. Access to the site is via an existing access road known as 'Tamar Way' leading off 'River Tamar Way'. Dedicated car parking is located to the north east of the site. The site falls within the Holsworthy Critical Drainage area and is located within a Zone 1 flood risk which represents less than 1 in 1,000 annual probability of river flooding (low probability).

Proposed development

The application seeks planning permission for the construction of a timber storage shed. The roof will be a single pitch and constructed of timber and felt. The shed will be 2.43 metres by 6.09 metres to a maximum eaves height of 2.49 metres and maximum ridge height of 2.63 metres. A single pedestrian door will be included in the east elevation along with two casement windows. Double doors will be included in the north elevation. Torridge District Council Estates Team have reviewed the application and have offered no observations.

Consultee representations:

Holsworthy Town Council: No representations received.

Environmental Protection Officer: The Environmental Protection Team has no objections.

Property Services: No observations. South West Water: Asset Protection Please find attached a plan showing the approximate location of a public 450mm surface water sewer in the vicinity. South West Water will need to know about any building work over or within 3.5 metres of a public sewer or lateral drain.

We will discuss with you whether your proposals will be affected by the presence of our apparatus and the best way of dealing with any issues as you will need permission from South West Water to proceed.

Further information regarding South West Water’s build over of sewers process can be found on our website via the following link: www.southwestwater.co.uk/buildover

Should you require any further information, please contact our Asset Protection Team via email: [email removed].

Surface Water Services The applicant should demonstrate to your LPA that its prospective surface run-off will discharge as high up the hierarchy of drainage options as is reasonably practicable (with evidence that the Run-off Destination Hierarchy has been addressed, and reasoning as to why any preferred disposal route is not reasonably practicable):

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
1/0072/2025/FULReport 286 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

8 of 20 attended
LG
Lauren GloverOfficer, expected
SM
Shelby MayOfficer, in attendance
NM
Nicola McGillOfficer, expected
RL
Councillor Rosemary LockChair, present
CL
Councillor Chris LeatherVice-Chair, present
PH
Councillor Peter HamesCommittee Member, present
DB
Councillor Doug BushbyCommittee Member, present
KH
Councillor Kit HeppleCommittee Member, present
PP
Councillor Philip PenningtonCommittee Member, present
DS
Councillor Doug SmithCommittee Member, present
CW
Councillor Chris WheatleyCommittee Member, present
JW
Councillor Jane WhittakerCommittee Member, apologies

All 20 on the meeting page

On this subject at Torridge

Search all
  1. 1/0072/2025/FULThis decision
  2. Application No. 1/0001/2026/FULMDecided
  3. Application No. 1/0258/2026/FULApproved
  4. Application No. 1/0173/2026/FULApproved
  5. Application No. 1/0857/2025/FULApproved
  6. Application No. 1/0023/2026/FULApproved

More from Torridge Plans Committee

All decisions
MeetingDecisionOutcome
30 Jul 2026 Application No. 1/0001/2026/FULMResolved – That the ... view the full minutes text for item 288. Decided Open
30 Jul 2026 Application No. 1/0386/2026That the application is approved subject to the conditions outlined in the report. A recorded vote was taken. COUNCIL... Approved Open
30 Jul 2026 Application No. 1/0258/2026/FULThat the application be approved, with an informative added for solar, rainwater capture and heat pump provision. A r... Approved Open
30 Jul 2026 Planning DecisionsResolved - That the Planning decisions for the period 23 rd June 2026 – 15 th July 2026 be noted. Noted Open
2 Jul 2026 Planning DecisionsResolved - That the Planning decisions for the period 20/5/2026 – 23/6/2026 be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies