RESOLVED – (A) That the application will propose a satisfactory form of development for the site upon the completion of an appropriate Legal Agreement and that such Legal Agreement be entered into to secure a maximum financial contribution of £3,221 split between £1,193 towards Highway and Active Travel Infrastructure, £1,098 towards Public Transport Schemes and £930 towards Specific Green Infrastructure (to be reduced by £310 per tree planted on site in accordance with an approved landscaping scheme). (B) That upon the satisfactory completion of the above Legal Agreement planning permission be granted subject to the conditions now determined.
Word for word from the decision Trafford published for this meeting.Source: democratic.trafford.gov.uk
ERECTION OF 2 STOREY BUILDING TO ACCOMMODATE AN A3 (RESTAURANT) AND A5 (HOT FOOD TAKEAWAY) USE AND DRIVE-THROUGH, INCLUDING CUSTOMER ORDER DISPLAY AND CANOPY, ASSOCIATED PARKING, AND LANDSCAPING FOLLOWING DEMOLITION OF EXISTING PUBLIC HOUSE
Bass Drum, 1235 Chester Road, Stretford, M32 8NB
APPLICANT: McDonalds Restaurants Ltd
AGENT: Planware Ltd
RECOMMENDATION: MINDED TO GRANT SUBJECT TO A S106 AGREEMENT IN RELATION TO PLANNING PERMISSION 81449/FULL/2013
This application was considered at the meeting on the 10th April 2014 where the Committee resolved that it would grant conditional planning permission for the proposed development outlined in the description above. In order to enable both the applicant and the LPA to enter into a legal agreement and enable the collection of financial contributions by the Local Planning Authority in accordance with Policy L8 and SPD1: Planning Obligations as set out in the Observations section of the original report, the recommendation should be amended to minded to grant subject to a Section 106 agreement.
It is therefore recommended that the amended recommendation of minded to grant subject to a S106 agreement is approved by Committee.
RECOMMENDATION: MINDED TO GRANT SUBJECT TO LEGAL AGREEMENT
(A) That the application will propose a satisfactory form of development for the site upon completion of an appropriate legal agreement to secure a maximum financial contribution of £3,221.00 split between: £1,193.00 towards Highway and Active Travel Infrastructure; £1,098.00 towards Public Transport Schemes; and £930.00 towards Specific Green Infrastructure (to be reduced by £310 per tree planted on site in accordance with an approved landscaping scheme; and
(B) That upon satisfactory completion of the above legal agreement, planning permission be
GRANTED subject to the following conditions: - 1. Standard 2. Comply with submitted drawings 3. Materials to be submitted 4. Details of materials of wall to site frontage, to be provided prior to first use 5. Hard and soft landscaping 6. Bin storage details 7. Tree protection measures 8. Method statement to demonstrate retention of retaining structure on site or how it would be replaced without disrupting existing trees 9. Opening hours – 0600-2300 – 7 days a week 10. No deliveries or waste collection outside of 0900 -1900 on weekends and bank holidays, and every week day between 0700-1900 11. Parking to be made available and retained for that purpose. 12. Extract and odour abatement scheme to be implemented in accordance with the submitted scheme including details of visual appearance. 13. Management plan to be submitted and implemented in accordance with the submitted scheme 14. Submission of details of acoustic fence, including location, and implementation of submitted details 15. Removal of PD rights to allow change to A1 use class 16. Submission of Crime Prevention Plan, and implementation of submitted details. 17. Submission of details of CCTV and implementation of submitted details 18. External lighting scheme to be implemented in strict accordance with the approved scheme 19. Travel Plan 20. Cycle and motorcycle parking 21. Site investigation 22. Drainage scheme to limit surface water run-off 23. Construction Method Statement (to include wheel wash; the parking of vehicles of site operatives and visitors; loading and unloading of plant and materials; storage of plant and materials used in constructing the development; measures to control the emission of dust and dirt during construction).
RW TCBs
PC PH
1 1 S t M a tth e
E T w 's
R E
2 1 Ch u
S T r ch
O N L S N E PW
3 1 1 5 2 1 6 1 1 1 2
8 6 1 2
7 8 Hall
8 8 St Matthews 1 Court 2 1 6 5 2 11
2 C R
1 0 O S S F O R D
9 7 ST R E 1 ET 1 6
Bass Drum (PH)
1 8 4 6 1 2
2 2 A D R O
9 9 R
1 1 T E
1 2 E S C H
E T 2
R E S T C K 1 3 t
N C O o 4 2
H A R T O U
1 1 1 3 E C V IN 1 2
ta b S
16 S u E l
E l S u b S ta 3 5 3
B R U N S W 1 1
IC K 1 2
S T R 1 2 E E T 4 9
7 1 L B 7 5 S A d e l T U R
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.