Resolved
RESOLVED : that the report be noted.
Joint Transportation Board noted this item on Monday 21 July 2014. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED : that the report be noted.
This report describes the progress to date and anticipated progress over the next three months of all programmed highway improvements and those schemes that are expected to be included in Kent County Council’s 2014-15Capital Programme.
Background and Discussion
1 This report gives details of the specific schemes which are expected to be progressed in Tunbridge Wells.
2 Appendix A summarises the schemes and gives an overview of the progress to date and anticipated progress prior to the next meeting of this Board.
3 Appendix B summarises the schemes committed under Kent County Council’s Member Highway Fund for each County Member as well as details of applications which are currently being progressed.
That Members note the progress of programmed highway improvements.
Appendices A Highway Improvement Schemes.
B Member Highway Fund Schemes.
Sources of Information: Circular Roads 1/2013 Setting Local Speed Limits. The background papers pertaining to the report are held on file. Appendix A - Highway Improvement Programme: Tunbridge Wells Borough 2014-15
Allocation
Forecast Out-turn Original
2014-15
2014-15 Anticipated Actions for KCC Highways, Current Location Description of Works next 3 months Transportation Progress (Prior to next JTB) & Waste
Casualty reduction B2079 works – improvements Outline designs Move to detailed design North Road junc. Steven Noad to junction layout, and scheme once costs established £5k £5k Ballard’s Hill 03000 41 81 81 signage and road costs underway ahead of build programme Goudhurst markings. A229 Casualty reduction Outline designs Move to detailed design Cranbrook Road works – minor Steven Noad and scheme once costs established £500 £500 junc. Heartenoak improvements to 03000 41 81 81 costs underway ahead of build programme Road junction signage.
Casualty reduction Outline designs Move to detailed design A228 works – maintenance Steven Noad and scheme once costs established £10k £10k Colts Hill of previous CRM 03000 41 81 81 costs underway ahead of build programme works. Appendix B – Combined Member Fund
Combined Member Fund programme update for the Tunbridge Wells District
The following schemes are those which have been approved for funding by both the relevant Member and by John Burr, Director of Highways and is up to date as of 30th June 2014.
The details below are for Highway Schemes only and do not detail contributions Members have made to other groups such as Parish or District Councils.
More detail on their schemes can be accessed by each Member via the online database or by contacting their Highway Project Engineer.
2013/14 Member Highway Fund Schemes
John Davies
Scheme Cost Status Salt bins at Redland Avenue and Grange Road 700 Installation Complete Mount Ephraim Zebra Crossing 20550 Handed Over Delivery
Sean Holden
Scheme Cost Status Implement changes to the junction layout at 21250 Design is on going Waterloo Road j/w Angley Road A229 to give traffic priority on the main A road. Works include extension to the centre island, new signing and lining, relocation of lit street furniture and double yellow line parking restrictions Christopher Hoare
Scheme Cost Status Installation of parking restrictions in the vicinity 1000 Design and consultation of St Philips Court, Sandhurst on going 2 Day Gang Hire – Pembury Parish 1599 Works identification on- going St Barnabus School, Quarry Road, Tunbridge 6000 Design on-going Wells – 20mph proposal Highway Trees – Greggs Wood Road 1010 Works Complete Gang Work and path clearance – Pembury 4669 Works identification on- Parish going Sandrock Road, Tunbridge Wells – Installation 1500 Design on-going of School Warning Signs Kerb Realignment – Greggs Wood Road 4662 Handed Over for Delivery junction with Liptraps Lane Salt Bin – The Coppice, Pembury 350 Handed Over for Delivery
Alex King
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Highway Improvement Scheme: Progress reportReport | 154 KB | DownloadRead as text |
PDF |
Highway Improvement Scheme Progress Report Appendix A /14Appendix | 54 KB | Download |
PDF |
Highway Improvement Scheme Progress Report appendix B /14Appendix | 69 KB | Download |
Follow Joint Transportation Board at Tunbridge Wells and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 13 Jul 2026 | Minutes of the meeting dated 20 April 2026RESOLVED : That the minutes of the Joint Transportation Board meeting dated 20 April 2026 be accepted as an accurate ... | Decided | Open |
| 13 Jul 2026 | Parking Consultation York Road and Dudley Road, Tunbridge WellsRESOLVED – That the Joint Transport Board notes the results of a public consultation proposing changes to waiting res... | Decided | Open |
| 13 Jul 2026 | Active Travel UpdateRESOLVED – The report was noted. | Noted | Open |
| 20 Apr 2026 | Minutes of the meeting dated 2 February 2026RESOLVED – That the minutes of the meeting dated 2 February 2026 be approved as a correct record. | Approved | Open |
| 20 Apr 2026 | Parish Highways Improvement Projects GrantsRESOLVED – The report was noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.