Decision/voting – A motion was proposed for both applications by Councillor Backhouse, seconded by Councillor Sloan and a vote was taken to approve the applications in line with the officer recommendation. RESOLVED - That application 15/505896 be approved subject to the plans and conditions as set out in the agenda report.
Word for word from the decision Tunbridge Wells published for this meeting.Source: democracy.tunbridgewells.gov.uk
REFERENCE NO - 15/505896/FULL APPLICATION PROPOSAL Installation of air handling equipment to serve the auditorium requiring installation of air handling plant on roof of theatre, ductwork located in ceiling void over auditorium and installation of extract and intake openings ADDRESS Assembly Hall Theatre Crescent Road Royal Tunbridge Wells Kent TN1 2LU RECOMMENDATION GRANT subject to conditions (See section 11.0 of the report for the full recommendation. SUMMARY OF REASONS FOR RECOMMENDATION/REASONS FOR REFUSAL - The proposal will not cause significant harm to the character or historic fabric of the grade II listed building. - The proposal will preserve the character and appearance of the Conservation Area REASON FOR REFERRAL TO COMMITTEE This Borough Council is the applicant and landowner. WARD Park PARISH/TOWN COUNCIL APPLICANT Property Services N/A AGENT DECISION DUE DATE PUBLICITY EXPIRY DATE OFFICER SITE VISIT DATE 27/11/15 06/11/15 09/10/15 RELEVANT PLANNING HISTORY (including appeals and relevant history on adjoining sites): App No Proposal Decision Date 15/505898/LBC Listed Building Consent - Installation of air Pending handling equipment to serve the Consideration auditorium requiring installation of air handling plant on roof of theatre, ductwork located in ceiling void over auditorium and installation of extract and intake openings 15/505564/LBC Listed Building Consent - Removal of Pending existing orchestra pit lift and replace with Consideration new lift and carry out associated structural and M and E works to be able to accommodate the new lift 15/507293/LBC Listed Building Consent: Floor Pending strengthening works Consideration 15/505428/FULL Change of use of Lower Foyer Bar (LFB) Granted 07/10/15 to mixed use of bar and children's soft play space/child friendly cafe 03/00279/LBC Listed Building Consent - Replacement Granted 16/04/03 ventilation grilles at high level in Planning Committee Report 11 November 2015
auditorium There is extensive further history relating to grants of Listed Building Consent (LBC) for other works, but these are not relevant to this application.
MAIN REPORT
1.0DESCRIPTION OF SITE
1.01The application site concerns the Assembly Hall Theatre, which forms part of the Civic Centre located in a prominent position on the corner of Mount Pleasant Road and Crescent Road.
1.02The Assembly Hall Theatre is positioned with the main entrance and the principal elevation facing onto Crescent Road and is a Grade II listed building.
1.03The application specifically relates to the theatre/auditorium and an area of roof above the main façade of the building. This area of the roof is bounded to the front by a metal railing/guard and by the taller wall of the auditorium to the rear and currently houses a number of small air condensing units.
2.0PROPOSAL
2.01This application seeks planning consent for the installation of an air handling system to serve the auditorium and to provide cool air into the theatre during performances.
2.02This work involves the installation of plant on the flat roof located above the main façade of the building and would be set back from the front elevation and in front of the wall forming the auditorium. This air handling unit would have an air inlet and exhaust projecting to the side of the building and across the adjacent Town Hall roof. This unit is intended to be a brown colour.
2.03In order to accommodate the air handling unit on the roof of the building a roof light which provides light to the internal staircase will be replaced with a lower profile roof polycarbonate roof light.
2.04The ductwork from this air handling unit will enter the building through the wall behind and into the roof void above the auditorium.
2.05Four extract points within the central ceiling of the auditorium are proposed to remove warm air and these will be covered by a concentric square plate designed and painted to match the detailing of the existing ceiling.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.