CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Tunbridge Wells Borough Council
Joint Transportation Board, Monday 17 October 2016 at 6.00pm

Cycle Route Options between Southborough Common and Mabledon

Noted Committee 4 papers

Joint Transportation Board noted this item on Monday 17 October 2016. Below is the council's own wording, with the papers it was decided on.

ItemTB19/16

Resolved

RESOLVED – 1. That the recommendations be supported subject to consideration of further options following a speed survey on the section of the A26 between Southborough Common and Mabledon ; and 2. That the public consultation on the route proposals being progressed be supported subject to it being noted that the above was under consideration.
Word for word from the decision Tunbridge Wells published for this meeting. Source: democracy.tunbridgewells.gov.uk

Follow this further

Built from Tunbridge Wells's papers

What the report saysPro

Report to Joint Transportation Board

Recommendation

That the option not to include any segregated infrastructure for cyclists or alternatively a 30mph speed restriction between Southborough Common and Mabledon be endorsed, as part of the A26 Tonbridge to Tunbridge Wells cycle route proposals.

INTRODUCTION

This report follows consideration of the A26 Tonbridge to Tunbridge Wells cycle route proposals at the 18 July JTB meeting. It responds to member questions concerning the continuity of the proposed route between Southborough Common and Mabledon. In particular concerns were raised regarding the justification provided in the report, relating to the implementation of a 30mph limit along this stretch of the road.

As set out in the report, the design approach sought to provide a safe, coherent, comfortable and attractive route that conforms to established cycle route design principles, providing segregated space where this is achievable along the A26. Where this can’t be achieved due to constrained highway geometry, topography or KCC Highways ownership, consideration was given to reducing traffic speed as a means of improving perceived safety whilst maintaining traffic flow.

Following the appointment of consultants DHA Transport who have prepared the plans, Economic Development Officer Bartholomew Wren and consultants walked the full length of the route to discuss options for improvement. Discussion was informed by measurement of existing carriageway widths which were taken on site. Following the site visit consultants obtained the Kent County Council highway ownership plans; these were used to inform the preparation of the route proposals using OS base mapping, supplemented by topographical surveys in certain locations. OPTIONS CONSIDERED

1. On-Carriageway Cycle Lanes

The starting point for consideration was to provide continuous on carriageway cycle lanes between Southborough Common and Mabledon. This would relate coherently to the proposed on-carriageway lanes at Southborough Common and the segregated cycling infrastructure improvements at Mabledon. Given the numerous side road junctions this approach could also in principle allow the cycle lanes to have priority over vehicular traffic at side junctions, as proposed elsewhere along the route.

Superseded drawings 11011-T-09 and 11011-T-10 show the layout of achievable on carriageway cycle lanes. These have been designed to utilise land that is within the ownership of KCC Highways. Whilst the alignment of the A26 generally becomes broader north of Southborough Common, the usable highway land and existing carriageway width are inconsistent with some clear pinch points.

The drawings show that only advisory cycle lanes can be achieved along this stretch of the road. These vary in width from 1.2m, which is an accepted standard for advisory cycle lanes, to 0.9m, which is less than acceptable. In the vicinity of the junctions with Bidborough Ridge, Vauxhall Lane and Church Road, it is not possible to provide any cycle lanes due to the insufficient width of the highway ownership and the need to retain vehicular right turn lanes.

KCC colleagues have advised that the removal of the right turn lanes would be detrimental to traffic flow in these locations. This is a significant limitation and negates the continuity and priority that cycle lanes could have at these junctions. Notwithstanding a cyclist travelling in the carriageway would otherwise have priority over vehicles waiting to turn at these junctions.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
7 Cycle Route Options between Southborough Common and Mabledon: Report v2 /16Report 88 KB DownloadRead as text
PDF
7a Cycle Route Options: Appendix A: 11011-T-09 Superseded a4 /16Appendix 1.2 MB Download
PDF
7b Cycle Route Options: Appendix B: 11011-T-10 Superseded a4 /16Appendix 625 KB Download
PDF
Cycle Route Options between Southborough Common and MabledonReport 75 KB Download

At this meeting

Whole meeting

On this subject at Tunbridge Wells

Search all
  1. Cycle Route Options between Southborough Common and MabledonThis decision
  2. 21st Century Way Cycle Route Consultation ReportDecided

More from Tunbridge Wells Joint Transportation Board

All decisions
MeetingDecisionOutcome
13 Jul 2026 Minutes of the meeting dated 20 April 2026RESOLVED : That the minutes of the Joint Transportation Board meeting dated 20 April 2026 be accepted as an accurate ... Decided Open
13 Jul 2026 Parking Consultation York Road and Dudley Road, Tunbridge WellsRESOLVED – That the Joint Transport Board notes the results of a public consultation proposing changes to waiting res... Decided Open
13 Jul 2026 Active Travel UpdateRESOLVED – The report was noted. Noted Open
20 Apr 2026 Minutes of the meeting dated 2 February 2026RESOLVED – That the minutes of the meeting dated 2 February 2026 be approved as a correct record. Approved Open
20 Apr 2026 Parish Highways Improvement Projects GrantsRESOLVED – The report was noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies