CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Tunbridge Wells Borough Council
Joint Transportation Board, Monday 3 July 2023 at 6.00pm

Red Brick Footways

Noted Committee 1 paper

Joint Transportation Board noted this item on Monday 3 July 2023. Below is the council's own wording, with the papers it was decided on.

ItemTB8/23

Resolved

RESOLVED – The report was noted.
Word for word from the decision Tunbridge Wells published for this meeting. Source: democracy.tunbridgewells.gov.uk

Follow this further

Built from Tunbridge Wells's papers

What the report saysPro

Report to Joint Transportation Board

To: Tunbridge Wells Joint Transportation Board

By: KCC Highways and Transportation

Date: 3rd July 2023.

Subject: Red Brick Footways – Tunbridge Wells

Classification: Information Only

Summary: This report updates Members on the Kent County Council approach for the preservation of the red brick footways in Tunbridge Wells

1. Introduction / Background.

Tunbridge Wells has a history of footways which were constructed with clay bricks. This originated from when the Pantiles were originally paved in c1700 with 9½” square clay pantiles. The laying of brick footways elsewhere in the town probably developed thereafter, culminating with the High Broom Brick Company manufacturing and supplying paving bricks, from excavated clay within the Tunbridge Wells area from 1885 until 1968.

The legacy of this is that there are now a number of characteristic red brick footways within Tunbridge Wells, some of which are of full brick construction and some part brick, part tarmacadam.

In the case of Tunbridge Wells the red brick footways have become a perennial issue when they are to be repaired, and the maintenance and the replacement of the brick footways has generally caused issues over the years with members of the public becoming concerned and campaigning for the bricks to be renewed rather than replaced with tarmacadam.

2. Current position

The repair and maintenance of the red brick footways continues to be a high-profile issue, highlighted further during the Covid pandemic.

The red brick footways themselves are unfortunately particularly susceptible to damage caused by vehicles parked on footways, as generally the brick footways are old and the sub- base structure was not designed to support such loads. The increased usage of heavier electric vehicles also has a further detrimental impact on these footways.

An increasing number of the red brick footways also suffer from the ground heave, resulting in potential trip hazards for pedestrians, which is caused by tree roots. This damage is occurring both from existing highway trees and also from private trees and vegetation adjacent to the public highway, and it is not possible in many situations to cut the roots to prevent this damage or to re-lay bricks.

The effect of both of these issues is to create trip hazards, consequently increasing the risk of Highway insurance claims and creating an additional maintenance burden, and as such in many locations, repairs have been made using tarmacadam. When carrying out maintenance works, it has not always been practical or possible to replace the bricks when damage had occurred, and as with all highway maintenance, cost effective and sustainable maintenance solutions in line with current and future available funding need to be identified, especially given that reconstruction works on the red brick footways are substantially more expensive than tarmacadam footways.

In addition to these common maintenance issues, local residents and Cllr’s have also highlighted concerns regarding the loss of sections of existing red brick footway following construction of new vehicle crossovers and existing crossover widening works.

3. Future Improvement Works.

Despite the funding issues across the country with regards to highway maintenance, in response to the damage being undertaken to these red brick footways in Tunbridge Wells, Kent County Council, (KCC), for the 2023/24 financial year have allocated a sum of £100.000 for reconstruction works that is ringfenced for the improving the red brick footways in Tunbridge Wells.

For 2023/24 and as identified in the Highway Works Programme report for July 2023, design work has commenced on the footway on the western side of St Johns Road, Tunbridge Wells, between Leighton Close, (leisure centre), and the Tunbridge Wells Boys Grammar School. This section of footway has seen the red brick footway severely impacted by tree roots, and KCC receives regular complaints about this section of footway, which is heavily used.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Red Brick FootwaysReport 79 KB DownloadRead as text

More from Tunbridge Wells Joint Transportation Board

All decisions
MeetingDecisionOutcome
13 Jul 2026 Minutes of the meeting dated 20 April 2026RESOLVED : That the minutes of the Joint Transportation Board meeting dated 20 April 2026 be accepted as an accurate ... Decided Open
13 Jul 2026 Parking Consultation York Road and Dudley Road, Tunbridge WellsRESOLVED – That the Joint Transport Board notes the results of a public consultation proposing changes to waiting res... Decided Open
13 Jul 2026 Active Travel UpdateRESOLVED – The report was noted. Noted Open
20 Apr 2026 Minutes of the meeting dated 2 February 2026RESOLVED – That the minutes of the meeting dated 2 February 2026 be approved as a correct record. Approved Open
20 Apr 2026 Parish Highways Improvement Projects GrantsRESOLVED – The report was noted. Noted Open