RESOLVED (unanimous by vote): That following a S278 and S106 agreement with the County Council, planning permission for application P13/V1139/FUL be granted, subject to the following conditions: 1. Commencement three years - full planning permission. 2. Approved plans. 3. CN12 - Access for archaeological investigation. (Full). 4. LS2[ I] - Landscaping scheme (implement) (Full). 5. Drainage – SUDS scheme – surface water and sewage – prior to occupation. 6. Archaeology – watching brief, unless otherwise agreed in writing. 7. Materials – submission. 8. Contamination clause – where further pollution is discovered. 9. Contamination – water courses. 10. Agreed travel plan. 11. Use of the vehicle maintenance building, vehicle fuelling and ... view the full minutes text for item 359.
Word for word from the decision Vale of White Horse published for this meeting.Source: democratic.whitehorsedc.gov.uk
Vale of White Horse District Council – Committee Report – 21 August 2013
APPLICATION NO. P13/V1139/FUL APPLICATION TYPE FULL APPLICATION REGISTERED 23.5.2013 PARISH MILTON WARD MEMBER(S) Bill Jones Michael Murray APPLICANT Spen Hill Developments Ltd SITE Former Esso Research Centre Milton Hill Oxfordshire, OX13 6AE PROPOSAL Construction of: A Class B8 home deliveries (Dot Com) centre, with vehicle maintenance building, gatehouse, vehicle fueling and washing facilitiesvan and staff parking, service yard, revised access from A4130, emergency access from Featherbed Lane, landscaping and associated infrastructure. AMENDMENTS None GRID REFERENCE 447391/190391 OFFICER Mark Doodes
1.0INTRODUCTION 1.1 The application site is the 4.8 Ha former Esso Research Centre campus on Milton Hill. The site has been disused for a number of approximately 13 years.
1.2Of note is the 2006 outline permission for a mixed use development for offices, general industrial and storage as well as parking etc. This permission was extended in 2011, and therefore remains extant.
1.3The food retailer Tesco, wish to occupy the unit, to relieve pressure on stores where home deliveries are currently from. This application is in direct response to a surge in online food shopping that is increasing by 15% a year. The proposal is essentially a food supermarket but without members of the public present, customer orders are picked, packed and shipped in a semi automated and highly organised operation that has been based on similar operations in Reading and Croydon. Tesco seek to serve homes within a 45 minute drive of the new centre, covering much of the Vale, South Oxfordshire and West Berkshire.
1.4Copies of the site location plan can be found attached at appendix 1.
2.0PROPOSAL 2.1 The applicant seeks full planning permission for a B8 home delivery centre, to accommodate mezzanines and the degree of automation a taller structure is required than a regular warehouse. The proposals are for a 120m wide, 83m deep building and with a ridge height of 18.5m (eaves of 15m). Parking will be provided for staff and delivery vans (typically of a “Transit” van size), in the form of 260 cars, disabled parking, 18 motorcycle bays and 48 motorcycles. There is a separate parking area for 193 vans serving 28 parking bays. A separate vehicle maintaince building (garage workshop) has been proposed to service and repair the fleet of vans (Tyres, brakes, exhaust, servicing etc). A jet- washing area is also proposed in the car park. Of key note is that half of the site, roughly, will remain undeveloped by these proposals. The illustrative masterplan shows an office-style development, however Councillors should be aware that this is not Vale of White Horse District Council – Committee Report – 21 August 2013
proposed in this application. Detailed plans can be found attached at appendix 2.
2.2Based on the information provided, such an operation will employ 750 people into 500 Full Time Equivalent posts. These staff will work one of three 8 hour shifts, meaning that the operation will run 24 hours a day. As is the case with regular supermarkets, many of the new positions will be part-time and almost all will be shift work. Due to the nature of the work, practically all these posts are expected to be new positions.
2.3Emergency access is proposed on Featherbed lane, to the rear. 9% of the power required to run the operation will be generated on-site by use of Photo Voltaic cells.
2.4The site falls within the Lowland Vale landscape zone and within a designated employment site (Milton Hill Business and Technology Centre). There are no listed buildings nearby and the site is not within a conservation area.
3.0SUMMARY OF CONSULTATIONS & REPRESENTATIONS 3.1 Milton Parish Council – Mixed views. The parish welcome the new jobs but have concerns over traffic generation. No objection overall.
Hugh Coddington – OCC Archeologist – Holding Objection - Recommend an onsite invasive study – Updates to be provided at committee.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.