RESOLVED (for 14; against 0; abstentions 0) To grant planning permission, subject to: 1. Landscaping scheme implemented in accordance with approval. 2. Tree protection as approved. 3. Boundary details as approved. 4. Plot curtilage boundaries to be demarked. 5. Rear garden lengths. 6. Materials as agreed. 7. No dwelling to have a ridge height more than 9.75 metres. 8. Ecology as approved. 9. Approved highways works completed before 15th unit occupied 10. Parking as approved. 11. Construction traffic management plan as approved. 12. Travel information packs as approved. 13. Footpath routes as approved. 14. Bin storage as approved. 15. Surface and foul water drainage as approved. 16. Sewer connections. 17. Drainage strategy as approved.
Word for word from the decision Vale of White Horse published for this meeting.Source: democratic.whitehorsedc.gov.uk
Vale of White Horse District Council – Committee Report – 30 January 2014
APPLICATION NO. P13/V2560/FUL APPLICATION TYPE FULL APPLICATION REGISTERED 27.11.2013 PARISH KINGSTON BAGPUIZE WARD MEMBER(S) Melinda Tilley APPLICANT Pye Homes (Oxford) Ltd SITE Land South of Faringdon Road, Southmoor, OX13 5BH PROPOSAL Variation of Condition 10 of Planning Permission P12/V1302/O, to allow the off-site highway works to be completed before the occupation of the 15th dwelling. AMENDMENTS None GRID REFERENCE 439523/197931 OFFICER Peter Brampton
1.0INTRODUCTION 1.1 This application relates to a single field on the southern side of Faringdon Road in Southmoor. It comprises a grassed field, enclosed by hedgerows and trees.
1.2Faringdon Road is one of the main thoroughfares of the village, running parallel to the A420 bypass. It is largely residential in character with various shops and local facilities accessed from it.
1.3This application comes to planning committee as Kingston Bagpuize Parish Council recommends refusal, and as four letters of objection have been received.
1.4A location plan is attached as Appendix 1.
2.0PROPOSAL 2.1 In January 2013, following a resolution to grant at committee in September 2012, outline planning permission was granted for the erection of 50 dwellings with public open space and a new access on the land. This outline application sought full consent for access, layout and the scale of the development.
2.2In April 2013, the reserved matters application, which covered the landscaping and appearance of the development, was approved. Subsequent to that, further details of the development were submitted to agree the pre-commencement conditions attached to the outline consent. These details were agreed and work started on site in late 2013.
2.3As is normal with these types of application, the developer needs to do certain works to the public highway to ensure a safe and convenient access to the site for vehicles and pedestrians (both new and existing). To be able to do these works, the developer needs to enter into a Section 278 agreement with the Highways Authority, who is responsible for the maintenance of the public highway network. This is a legal agreement between County Council and developer. The Vale of White Horse is not a party to this agreement, but the proposed works to the highway in that agreement match the works we have approved in respect of condition 10 of the outline consent.
2.4Condition 10 requires the applicant to complete the provision of the new access and associated visibility splays, the relocation of an existing bus stop outside of those Vale of White Horse District Council – Committee Report – 30 January 2014
splays, the provision of street lighting and the construction of a new public footpath. These works need to be completed prior to the first occupation of any dwelling on the site.
2.5Unfortunately, there have been delays in completing the Section 278 agreement to enable these works to start. In the meantime, work has continued on the building of the houses on site. This work has progressed smoothly, with the first dwellings due to be ready for occupation in late February 2014. This first completed phase will include five affordable units that SOHA are due to take on as the registered provider. Private sales will complete a few weeks later.
2.6The applicant is now in a position that, due to the delay in the Section 278 agreement, these houses will be ready for occupation before the highway works are complete. Consequently, the applicants make this application to vary the requirements of condition 10 to allow up to 15 of the 50 units to be occupied before the highway works are complete.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.