to authorise the head of planning to grant planning permission for application P18/V2470/FUL, subject to the following: I. Completion of a deed of variation to the S106 agreement to secure contributions towards local infrastructure and affordable housing; and II. The following conditions: 1. Time limit – development to begin no later than 11 August 2020. 2. Approved plans. 3. Materials (samples). 4. Construction traffic management plan. 5. Parking. 6. New estate roads. 7. Footpath link north details (to Cow Lane). 8. Footpath link south details (to Howard Cornish Road). 9. Footpath links prior to occupation. 10. Travel information pack. 11. Foul drainage strategy. 12. Sustainable drainage scheme. 13. No occupation until drainage scheme implementation. 14. Tree protection. 15. Landscaping scheme. 16. Landscape maintenance. 17. Ecology mitigation measures. 18. Boundary details. 19. Bicycle parking and bin storage. 20. External charging points for electric vehicles - dwellings with garages. 21. Garage accommodation. 22. Hours of operation - construction/demolition sites. Informative - Planning obligation.
Word for word from the decision Vale of White Horse published for this meeting.Source: democratic.whitehorsedc.gov.uk
C this drawing and the building works depicted are the copyrightidp of and may
Appendix 1 N not be reproduced or amended except by written permission. no liability will be accepted for amendments made by other persons.
all dimensions to be checked on site and architect notified of any discrepancies prior to commencement. do not scale.
notes:
Red hatch indicates trees to be removed. See Blue hatch indicates the existing trees to be Arboriculturalist consultation report for further reduced back. information.
Extended link up to Cow Lane
Visitor parking spaces
Red hatch indicates trees to be removed. See Arboriculturalist consultation report for V14 further information. Pedestrian access / link V15 to Sheepstead Road V16
Proposed litter bin location Pedestrian access / link to adjacent pedestrian track Tactile paving at crossing points SHEEPSTEAD ROAD
E34/A2
E34/A2 41 Proposed litter bin location
E11/K 10 09 08 07 06 E34/A3 E34/A3 17 40 39 TYPE H TYPE H 37 36 35 34 TYPE H TYPE H 38 Tactile paving at crossing points E11/K E11/K E21/B E11/K 17
06 E14/J E14/J V13 Total Site Area: 26,163 sq.m 10 07 05 09 08
15% of Total Site: 3,925 sq.m
E14/J 34 41 40 V12 18 39 05 38 1.8m high brick garden wall 11 37 35 36 TYPE G 11 04 33 POS Provided: 4,897 sq.m 18 V11 04
TYPE F Visitor Parking Spaces: 16
E34/A3 19 20 21 33 22 TYPE G
23 24 1.8m high garden wall 12 32
TYPE F 32 62.7m
E34/A3 Area =344
TYPE G 03 25 25 32 25
E11/K Blue hatch indicated extent of 12 03 19
TYPE F 31 trees to be reduced back TYPE H TYPE H 31 13 E21/B
E34/A2 sq.m
TYPE G 20 21 22 23 E21/B V10 24
TYPE F Existing tree belt E34/A2 13 26 02 30
E21/B 26 V9 30 Bike and bin store 0.8m maintenance margin 27 14 29
TYPE G 14 V1 29 V2 V3 V4 V8 V5 29
E21/B Refuse lorry turning area. 02 27 28
TYPE G 28 01 Area =831sq.m 28 Bin collection point 01 Bin collection point. 46 46 45 45 V6 V7 /K E11
E55/F E55/F E55/F Area =172sq.m Turning head for refuse vehicle
Proposed litter bin location Blue hatch indicates the existing trees to be 15 14 Area = 350sq.m 47 47 reduced back. 16 16 15
E34/A2 43 42
Area = 2750sq.m TYPE F TYPE F TYPE F TYPE H TYPE H
Red hatch area indicates trees to be removed. Red hatch area indicates 47 46 45 44 43 trees to be removed. 42
NG WAY H ARDI Site access to be gained via Area = 450sq.m existing road stub
Pedestrian access.
rev: date: comment(s): name: check: 62.0m
ARCHITECTS.
URBAN DESIGNERS. PLANNERS. PROJECT MANAGERS. LANDSCAPE ARCHITECTS. WE ARE IDP. PROPOSED SITE PLAN 1:500 status: FOR COMMENT RIBA Stage: 1
client: Mactaggart and Mickel
job: Kings Field, Marcham
title: Proposed Site Plan
drawn: RE date: 06.09.2018
checked: BF scale @ a1: 1:500
job no: C3538 drg no: (PL) 001 IDP GROUP 27 SPON STREET COVENTRY CV1 3BA 0 5 10 20 30 40 T: +44 (0)24 7652 7600 E:[email removed] scale 1:500 metres www.weareidp.com Appendix 2 0 25 NOTE: ALL DIMENSIONS MUST BE CHECKED ON SITE AND NOT SCALED FROM THIS DRAWING. FOR USE IN PRECISE NAMED LOCATION ONLY. COPYRIGHT RESERVED.
ACCOMMODATION SCHEDULE
Market
4 Bed 9 (GIA 1316sqm/14,165sqft) (Units 16, 17, 18, 19, 24, 29 32, 33, 36) extended link up to Cow Lane 3 Bed 14 (GIA 1380sqm/14854sqft) (Units 4, 5, 14, 15, 20, 21, 25, 26, 27, 28, 30, 31, 34, 35) green hatch indicates trees recommended for removal in 2 Bed 8 (GIA 654sqm/7040sqft) (Units 1, 2, 3, 11, 12, safety survey and also trees 13, 22, 23) recommended for removal as part of ongoing management. See Arboriculturalist Consultant's reports TOTAL GIA: 3350sqm/36059sqft for further information.
Affordable
visitor spaces 3 Bed 6 (GIA 594sqm/6393sqft) V (Units 9, 10, 37, 38 V 43, 44) pedestrian acces/link to V 2 Bed 10 (GIA 800sqm/8611sqft) Sheepstead Road V pedestrian access to adjacent (Units 6, 7, 8, 39, 40, BIN V pedestrian track 41, 42, 45, 46, 47)
proposed bin location 12 13 V
14 15 16 17 V
29 blue hatch indicates the existing TOTAL GIA: 1394sqm/15,866sqft 30 31 33 34 32 35 trees to be reduced back 36 proposed bin location TOTAL 47 UNITS BIN
TOTAL GIA 4744sqm/51,064sqft
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.