RESOLVED : to approve the following comments for submission to Oxfordshire County Council on application P18/V3102/CM: 1. This council has no objection in principle to this proposal. 2. This authority is not convinced that the proposal results in a net gain in biodiversity. It is considered the applicant has under estimated the timescales for proposed habitat creation to reach good condition. For example, dense and continuous scrub will take at least 10 years to reach good condition rather than 5 years, broad leaved woodland will take 30+ years to reach good condition rather than 10 years, semi improved grassland will take 20 years to reach good condition rather than 5 years, and species rich hedgerows will take 15 years to reach good condition rather than 5 years. Applying these changes alone to the Biodiversity Impact Calculator results in a net loss of at least 81 biodiversity units. On this basis the proposal is contrary to core policy 46 of the Vale of White Horse Local Plan 2031 Part 1. The applicant should be asked to revise the scheme to ensure it can provide biodiversity enhancements and that revised proposals are supported by a further Biodiversity Impact Calculator. 3. With regard to culvert work beneath the A423 this council is concerned that 24 hour working could result in unreasonable noise disturbance for local residents. The Environment Agency should be asked to provide further information demonstrating that there will be no detrimental impact to the living conditions of local residents . If the applicant is unable to demonstrate or unwilling to demonstrate that 24 hour working would not have a detrimental on residential living conditions, this authority requests that a condition is imposed restricting working to 07:30-18:00 Monday to Friday and 08:00-13:00 on a Saturday; and no work to take place on Sundays or Public Holiday. 4. Should ... view the full minutes text for item 114.
Word for word from the decision Vale of White Horse published for this meeting.Source: democratic.whitehorsedc.gov.uk
Appendix 1 Appendix 2 SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION Notes: Prior to using the works information shown on this drawing the con-tactor must refer to the Designer's design risk assessments reference IMSE500177-CH2-CXB-A2A-RA-HS-0338 and IMSE500177-CH2 -CXB-A2A-RA-HS-0339 for risk concerning this section of the works. The principal contractor and other 1. All dimensions are in millimetres unless otherwise stated. All Existing flood relief culverts to Existing flood relief contractors should note that the risks identified in this document may not be exhaustive and further consideration may be necessary. levels are in metres above Ordnance Datum (mAOD) Newlyn
N
B be removed culvert to be removed Demolition of existing culverts 2. The services locations shown in this drawing are only indicative Retaining wingwalls and based on information received (C2 Returns) from Service 2. Buried and overhead services. Providers in February 2017. Regraded/reprofiled approaches 6. Instability of structure during demolition. 3. Existing flood relief culverts to be decommissioned. to bridge to a slope of 1:3. Construction of new bridge 4. New Accommodation Bridge for combined use by pedestrians, Highway alignment to be confirmed in detailed design stage
8000 1. Working at height. cyclists, equestrian and vehicles. Existing footpath
C 2. Working over/adjacent to watercourse. 5. All timber sourced from sustainable and legal sources. 5. Overhead electric lines and buried sevices. Certification by a qualified independent body provided to the 7. Interface of construction traffic and public and other road Project Manager for approval prior to installation. users. 6. The sizes of all the channels shown are only indicative and are subject to change.
SW(B) SW(B) 8. Breaking out existing old tarmac walkways.
SW(B) 7. Cobbles to cover the verges of the bridge.
SW(B)
SW(B) SW(B) Note: shared access of the existing bollards Existing footpath 11. Unexploded ordnance (UXO). on the existing arch bridge would be required D D Track
C Maintenance and Operation
SW(B) LEGEND
SW(B)
SW(B) Detail 1 SSE HV(D) SSE HV(D) SSE HV(D) SSE HV(D) SSE HV(D) SSE HV(D) 20. Working at height.
.7 Demolition New/Modified Channel Existing HV to be diverted
m onto service ducts on the 24. Instability of structure during demolition. verge A A 300mm Thick Rip Rap
SSE HV(C) SSE HV(C) Changed the extents of Rip Rap. Brick/Stone cladding
B Rip Rap 300mm
SSE HV(C) SSE HV(C) E.G.L Existing ground level Geotextile to CL PLAN VIEW CL Regraded/reprofiled approaches prevent wash out Update to design piles piles SCALE 1:250 to footbridge to a slope of 1:3. 25 25 Highway alignment to be confirmed Movement joint 21430 Movement joint Front random Statutory Undertakers Information 9800 9800 stone cladding surface Underground services 19100 Proposed parapet Clear span of the abutments SSE HV(ST) SSE High voltage electricity cables 20 20 1 1 Internal PVC 25mm movement PAS 128:2014 - Data Quality Level waterstop width joint 230mm Grace ST Survey Type Servitite or equivalent A Verification 1.5 1 +57.12 E E 1.5 DETAIL 1 B Detection 1 E.G.L SCALE 1:25 C Site Reconnaissance
+56.92 Existing flood relief D Desktop utility records search 3 1 in 100 year flood event 3 1 Estimated typical culverts to be removed 1 water level +35% climate change
Rip Rap 300mm thick +54.00
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.