RESOLVED : to grant planning permission for application P20/V1439/FUL subject to the following conditions: 1. Time Limit 2. Approved plans Compliance condition 3. Vision splay 4. The proposed development shall be delivered in accordance with the Construction Environmental Management Plan (CEMP) measures as specified 5. The proposed development shall be delivered in accordance with the Tree Protection Plan
Word for word from the decision Vale of White Horse published for this meeting.Source: democratic.whitehorsedc.gov.uk
S GAS IP GAS GA S GAS G GAS 7290006 .47 AS GA IP GAS S T37 CULVERT 0.5Ø
Lodge Hill GA S IP GA H49 S 1.90005 4
IP GA S
G74A IP S 90004 .56
GA S IP
TR AC GA
K S 1.90003 4
IP GA S
GA IP S 4 A3 GA S IP GA S
IP
1.6IP
IP
IP 1.6
IP WOODLAND G50
TRACK IP
T38 G45 IP
IP 4 A3
IP 1.6
IP
IP G34 H39 IP
K TRAC IP 1.7
IP
IP
IP T51 1.8 IP
IP T52 4 A3
IP
1.6H53 G54 IP
IP
IP G55 IP
IP
IP G42 1.5
(A4183) IP G40
ROAD OXFORD IP 1.4
G41 IP T43
h 1-1 Pitc (U1otball 2) T33 T15
Fo IP T16 IP
IP IP
IP T17 IP 4 CULVERT A3
IP
T18 T19 IP
G5 IP
T20 T6 T4
83) (A41 T8 T7 IL70.39
ROAD lp
RD G10
OXFO Track G21 G9 W13 DUNMORE ROAD 4
LC A3
T11
DK DUNMORE ROAD
T32 T22 ROAD ORE DUNM
G23 G14
83) (A41 H30
AD OAD
RO ER OR
FORD NM DU
OX G31 G24
WOODLAND
H AT
T25 FO OTP
GATE POST
G28 T26 OR E RO A D G59 NM DU H114 H AT TP O FO
) 83 (A41 OAD DR T27
OR OXF W12
Athletics WOODLAND DU NM OR E RO AD
G82 HA
G29 W85 Arena FO O TP AT H
O L LY NS
AD
N RO RE O NM DU
K S G81
CL ON
REV COMMENT BY DATE Tilsley OTP ATH
DR C FO BLI PU
G80 RD
BA TWEL
E VE ACRE DRIVE
IV E Park AV
LL
A Space to live. R D CH David Wilson Homes E AV DAVID WILSON HOMES SOUTHERN CH
Norgate House Tealgate D Charnham Park B A LLA R Hungerford
ON C LO Berkshire th S S
E X A N D E R CL RG17 0YT Pa G I B R O SE
Sports VE WA Telephone 01488 680 300
E A SE
RO S E Y Fax 01488 681 594
K A trading name of BDW TRADING LIMITED WO RO
Pitches L C Project C
TO E North Abingdon OD
N OAD R
M AT R E Oxfordshire L H AN S O N LE Y C L
C U L
Drawing Title
AL Location Plan
Scale W 1:1250 @ A0 O O D LE FO
Y C Date L April 2020 Pa
S th
T Drawn By Checked By ER JM GN AD
L O YD C R D LO S RO
Drawing Number Revision E NORT HFIEL H8018/LP/02 - D NOTES 1. See drawing 8170542/6402 for general design notes.
N KEY Land ownership site boundary
H Existing highway boundary
H H New highway boundary
Extent of S.38/278 works
Site layout
2.4m x 120m visibility splay
120m forward visibility for right turning vehicles
120m forward visibility to signal heads
Indicates amendments from previous drawing revision
Existing lighting column to be retained
See NSA drawings LC (lantern to be upgraded)
Indicative street lighting design.
for details. LC Existing lighting column to be removed
New lighting column
New 3.0m shared footway/cycleway link to existing uncontrolled crossing Highway beyond to be offered for adoption Realign kerb line and widen carriageway 2 New Toucan crossing 5 New uncontrolled crossing 2 LC New central site LC access junction
LC
Dunmore Road LC
LC New bus shelter
New 3.0m shared footway/cycleway 3 4 New westbound bus stop LC New eastbound New 3.0m shared bus stop lay-by footway/cycleway Existing 3.0m segregated New bus shelter footway/cycleway
LC
New 3.0m shared Boulter Drive
footway/cycleway
C2 Status amended to CONSTRUCTION 21/09/2018 MF LC T.Hart
2 C1 Issued for CONSTRUCTION 18/09/2018 MF New uncontrolled T.Hart crossing A3 Updated in accordance with Technical 12/09/2018 MF Audit comments 12/09/2018 T.Hart
A2 Updated in accordance with Technical 16/05/2018 MF Audit comments 26/04/2018 P. Kleberc LC
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.