CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Wandsworth
Planning Applications Committee, Wednesday 15 April 2026

Applications (Paper No. 26-112)

Approved Planning 6 papers

AI summaryWandsworth’s Planning Applications Committee unanimously approved listed building consent with conditions for replacement of the front door canopy and brackets [D] [1.1] [1.3]. Work must follow the drawings, Heritage Statement and Method Statement [P19] [P20].

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApprovedCanopy and bracket replacement [1.1] [1.3]
MoneyNot stated
What happens nextCarry out replacement [D] [1.1]Follow drawings, Heritage Statement and Method Statement [P19] [P20]
Who it affectsCanopy and brackets [1.1]Listed building’s historic fabric [1.1] [1.2]

What was decided

The committee unanimously approved listed building consent with conditions for Application 1 [D]

The approved works replace the decayed front door canopy and its two timber brackets with a matching replica [1.1] [1.2] [1.3] [P14] Report 1.1, 1.2, 1.3, P14

Condition 01 sets 3 years, and condition 02 requires work in accordance with drawings [P19] Report P19

Why

Widespread rot and beetle infestation meant that most of the canopy could not be reused or sensibly repaired [1.2] [1.3] Report 1.2, 1.3

The brackets were compromised when the canopy was removed, remain embedded in brickwork and are not normally visible [1.2] [1.5] Report 1.2, 1.5

The report found that loss of historic fabric would cause less than substantial harm, justified by decay, inability to repair and an unchanged external appearance [1.3] [1.5] [P17] Report 1.3, 1.5, P17

What happens next

Implement the replacement to the method statement, using the retained canopy as the model [1.3] [P14] [P20] Report 1.3, P14, P20

Comply with the condition requiring work in accordance with the drawings [P19] Report P19

Use the listed drawing, unnumbered proposed front elevation, Heritage Statement and Method Statement [P20] Report P20

Options considered

  • Chosen: Replace the canopy and brackets with a matching replica. Most of the timberwork was beyond repair, and a replica would preserve the building’s appearance [D] [1.2] [1.3] [1.5] [P17] Report 1.2, 1.3, 1.5, P17
  • Rejected: Retain and reuse the timber brackets. The brackets were damaged during removal and are now compromised and embedded in brickwork [1.2] [1.5] Report 1.2, 1.5
  • Rejected: Use Scots pine for the new timber. Scots pine was unavailable, so an alternative timber was specified and will be painted [1.3] Report 1.3
  • Rejected: Repair and retain more of the existing canopy. Rot and beetle infestation meant that no other part could be reused and sensible repair was impossible [1.2] [1.3] Report 1.2, 1.3

Implications

  • Legal: The consent is conditional, with one condition giving 3 years and another requiring works to follow the drawings [D] [P18] [P19] Report P18, P19
  • Other: The building’s character and appearance would not change, but historic fabric would be lost, causing less than substantial harm [1.3] [1.5] [P17] Report 1.3, 1.5, P17
  • Risk: The decayed canopy posed a potential collapse risk, and its removal had already compromised the brackets [1.2] [1.5] Report 1.2, 1.5
  • Other: Consultation sent 9 letters and used site and press notices [P1]. It received one objection, no comments and no letters of support [P1] Report P1
  • Other: The specified alternative timber will be painted, so its colour, texture and grain will not be visible [1.3] Report 1.3
  • Other: The Georgian Group, the statutory consultee, did not object [1.4] Report 1.4
  • Legal: Relevant national, London and Wandsworth planning policies and guidance were identified for the assessment [P3] [P4] [P5] [P6] [P7] Report P3, P4, P5, P6, P7

Who and where

  • The applicant Report P2
  • The listed building Report 1.1
  • The front door canopy and brackets Report 1.1
  • An objector Report P1, P2
  • The Georgian Group Report 1.4

Timeline

  • 2026-04-15: The Planning Applications Committee approved the application unanimously [D]
  • 3 years: The consent includes a condition giving 3 years [P19] Report P19

Plain English for the jargon

  • Listed Building Consent: Approval for the listed canopy and bracket replacement, granted with conditions [1.1] [P18]
  • Historic fabric: Original material forming part of the historic canopy structure, whose loss the report assesses [1.2] [P17]
  • Less than substantial harm: The report’s category for loss of historic fabric, balanced by inability to repair and a matching replacement [P17]
  • NPPF: National Planning Policy Framework (2024), covering sustainable development, decision making and the historic environment [P3]
  • NPPG: Other National Guidance (2025) [P4]
  • London Plan: The 2021 plan with policies on London’s form, site capacity and good design [P5]
  • SPG: Mayor of London’s Supplementary Planning Guidance, covering housing, character and context, and sustainable design and construction [P6]
  • Wandsworth Local Plan: The 2023 plan covering design, general development principles, extensions and alterations, and the historic environment [P7]
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item3

Resolved

RESOLVED – (unanimous ) that listed building consent with conditions be approved as set out in the report. Application 2 ( 2025/3409 ) 35-37 Ransomes Dock Business Centre, Parkgate Road, SW11 4NP A Member sought clarification about whether one of the modifications included a green roof. In response, the Area Team Manager (East Team) confirmed that the opportunities for green roofs were extremely limited due to the architecturally sawtooth roof, therefore this was not carried through. He added that there were, however, landscape opportunities. RESOLVED – (unanimous) that the variation of Conditions 2 and 14 be approved as set out in the report, noting the additional information as set out in the late items of correspondence paper. Application 3 ( 2025/3651 ) Meadbank Nursing Home, 12 Parkgate Road, SW11 4NN The Senior Planner introduced the application and explained that the application site was bordered by Parkgate Road to the north, Battersea Bridge Road to the west, and the Ethelburga estate which was accessible via Searles Close to the south and east. He added that the existing site was vacant and was historically used as a care home that provided residential dementia and nursing care for the elderly that totalled 176 bed spaces. The Committee was informed that the facility was currently unoccupied and depending on the outcome of this application, the current arrangement would provide for pedestrian and vehicular access from Parkgate Road to the north, while to the east, a dedicated service area would be provided and would be accessible via Searles Close. It was also confirmed that the site was not locally or statutory listed, nor within a conservation area. The Senior Planner explained that the application was for the demolition of existing buildings and site redevelopment, in order to provide replacement Class C2 care accommodation within a part 4, 5 and 7 storey building with basement level that would provide up to 139 care beds and suites. The application also proposed associated communal, wellness and ancillary facilities, hard and soft landscaping and associated car parking, as well as servicing, cycle parking, substation and plant equipment. The Committee was informed about what the main body of the existing site consisted of, and it was noted that the proposal was submitted in response to recent feedback from the Care Quality Commission (CQC) which confirmed that the existing care home would not meet current or future CQC requirements for securing a new registration. This was due to 80% of the existing bedrooms not having a full wet room bathroom facilities , and there was also insufficient communal space for dining, recreation and social activities. The proposal sought to replace the existing, non-compliant CQC accommodation with a modernised care village within a sustainable urban setting, whilst achieving a high standard of sustainable design and architecture. It was noted that the care home Class C2 use would be maintained and secured by the legal agreement. Members were informed that the seventh ... view the full minutes text for item 3.
Word for word from the decision Wandsworth published for this meeting. Source: democracy.wandsworth.gov.uk

Follow this further

Built from Wandsworth's papers

What the report saysPro

Report to Planning Applications Committee, 7 pages

Consultation

Number of letters sent 9 Site Notice Yes Press Notice Yes Number of responses received 1 Number of objections 1 Number of comments 0 Number of letters of support 0

Consultation Summary objection comment. while accepting that much of the canopy has decayed and may well require replacement focuses on the timber support brackets, which were embedded in the brickwork. It is questioned why these were sawn through during the removal of the canopy and not retained, as it is likely they could have been integrated into the new canopy. Also questions why Scots pine cannot be used for the replacement canopy, as this is likely to have been the original timber source

RELEVANT PLANNING POLICIES: National Planning Policy Framework (NPPF) (2024) Section 2: Achieving sustainable development Section 4: Decision–making Section 16: Historic Environment

Other National Guidance NPPG (2025)

London Plan (2021) D1 (London’s form, character and capacity for growth) D3 (Optimising site capacity through the design-led approach) D4 (Delivering good design)

Mayor of London’s Supplementary Planning Guidance (SPG’s): Housing SPG (2016) Character and Context (2014) Sustainable Design and Construction (2014)

Wandsworth’s Local Plan (2023): LP1 (The Design-led Approach) LP2 (General Development Principles) LP5 (Residential Extensions and Alterations) LP3 (Historic Environment). Official

PLANNING CONSIDERATIONS: The main considerations material to the assessment of this application have been summarised as follows:

• Impact on the building’s special architectural or historic interest • Design

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Application 1: 2026-0350Report 7 pages DownloadRead as text
PDF
Application 2: 2025-3409 EastReport 35 pages Download
PDF
Application 3: 2025-3651 EastReport 107 pages Download
PDF
Applications (Paper No. 26-112)Frontsheet 1 pages Download
PDF
Background paperReport 1 pages Download
PDF
LATE ITEMS PAC APRIL 2026Report 6 pages Download

At this meeting

Whole meeting

On this subject at Wandsworth

Search all
  1. Applications (Paper No. 26-112)This decision
  2. Applications (Paper No. 26-207)Refused
  3. Applications (Paper No. 26-184)Decided
  4. Applications (Paper No. 26-164)Deferred
  5. Applications (Paper No. 25-449)Refused
  6. Applications (Paper No. 25-401)Noted

More from Wandsworth Planning Applications Committee

All decisions
MeetingDecisionOutcome
17 Sep 2026 Minutes - 20th August 2026RESOLVED – The minutes of the Planning Applications Committee meeting held on 20th August 2026 were confirmed as a co... Decided Open
17 Sep 2026 Declarations of InterestCouncillor Cooper would like it noted for each meeting that she was a Member of the London Assembly for Merton and Wa... Noted Open
17 Sep 2026 Applications (Paper No. 26-207)Application 1 ( 2026/0584 ) Arch 79, Rear Of 326 To 342 Queenstown Road, Queens Circus, SW11 8NE – (7 for, 1 against ... Refused Open
17 Sep 2026 Decisions (Paper No. 26-208)RESOLVED – That the report be received for information. Decided Open
17 Sep 2026 Closure of Investigation Files (Paper No. 26-209)RESOLVED – That the report be received for information. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies