Proposal Retention of 20 hectares of polytunnels throughout the year (5.6 hectares heated by heat pumps drawing heat from the on-site reservoir, 14.4 hectares without heating), (located in particular fields identified as acceptable) on the farm; 40 further hectares of polytunnels to be on site (in fields identified as acceptable for polytunnels) from 1 April until 31 October, with the retention of hoops on the further 40 hectares of polytunnels (removing plastic covers only between 1 November and 1 April) (as amended by plans received 14/05/2021). Decision Permission GRANTED, subject to conditions 1-16 and informatives 1-8 and the addition of condition 17, set out in the update sheet, which states: The proposed extended season at the site shall not be commenced unless and until a HGV Delivery Management Plan to include but not be limited to details of: • Location of Deliveries clearly marked on a Location Plan; • Times of Deliveries and Collections each day, including communication of delivery timings; • A commitment to avoid HGV movements between AM and PM peak travel times; • An approved route for all HGVs accessing the site via Tuesley Lane, Station Lane and the A3100; • Number of Deliveries and Collections each day. • Size and type of the vehicles used; • Detailed design of loading/unloading areas within the site, including measures to prevent private cars from parking in the HGV loading/unloading bays. And informative 9 requesting a Liaison Group be established to provide better communication between the applicant and Parish Council.
Word for word from the decision Waverley published for this meeting.Source: modgov.waverley.gov.uk
The application has been brought before the Area Committee at the request of the Local Member, Councillor Richard Seaborne. The application was previously deferred from the April meeting to allow for further consultation with Natural England, and to await the outcome of an EIA screening direction from the Secretary of State.
The application proposes to retain 20ha of polytunnels throughout the year, 5.6ha of which would be heated by pumps drawing heat from the on-site reservoir and 14.4ha unheated. The polytunnels to be heated would be those closest to the on-site reservoir. These fields are those that have been identified as acceptable for year-round coverage.
Permission is also sought for a further 40ha of polytunnels across the site in fields identified as being acceptable. These would be erected on site between 1st April and 31st October. The plastic sheeting of the polytunnels would be removed between 1st November and 31st March each year, with the legs and hoops remaining.
Page 1 of 47 The total area of fields identified as suitable for coverage by polytunnels totals approximately 66.2ha, with no more than 60ha coverage in one year during the period 1st April to 31st October. Polytunnel legs and hoops would remain through the winter down period of 1st November and 31st March on those fields proposed to have polytunnels on them the following year.
The most significant areas of concern in relation to the application are the impact on the landscape character and the resultant impact on highway safety and vehicular movements.
The application is supported by a Landscape and Visual Assessment (LVA) by Huskisson Brown Associates (HBA) which has been independently reviewed by LVIA Ltd. on behalf of the Council. Two subsequent addendum statements to this LVA have been produced, responding to the amendments of the scheme since original submission to remove fields 5b, 5c, 16a and 22. The independent review by LVIA Ltd. accepts that the methodology is broadly in line with the GLIVA3 guidelines and allows a reader to consider the points and follow the process of appraisal. The outcomes of the LVA are concluded to be reasonable. Neither landscape, nor visual effects from the proposal are considered to be materially harmful and over time, subject to successful implementation of landscape management works, the proposed polytunnels would have a reduced impact on the landscape character and visual amenity of the area.
The application is also supported by a Transport Statement by Bellamy Roberts LLP which sets out that the proposal would not result in an increase in vehicular movements during peak times. The proposal would increase the picking season by approximately 2 months but would not impact upon yield at peak times. No material impact on the road safety is considered to result.
The remaining areas of assessment are set out in detail within the below report, including the impact on heritage assets, residential amenity and flood risk among others.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Wa/2021/01837 - amlets lane cranleighMembers resolved to DEFER the application, pending further evidence regarding how the proposed development would acco...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.