CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Nov27Monday

Audit & Risk Committee

WaverleyHeldPapers from modgov.waverley.gov.uk
Monday 27 November 2023, 7.00pmHeld 1091 days ago.
Committee Room 1Council Offices, The Burys, Godalming. Open to the public except for exempt items.
17 items, 11 papersAbout 9.2 MB, led by 2023-24 Audit Plan from Grant Thornton.
1 item with exempt partsExclusion of Press and Public may be taken in private.
This meeting was held27 November 2023
17items
11papers
–decisions
1exempt
Running order, sized by papersItem AUD 37/23 to AUD 53/23
ReportsProcedureExempt parts

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item.

37
Procedure
Item AUD 37/23

Apologies for Absence

To receive apologies for absence.

38
Procedure
Item AUD 38/23

Minutes

To confirm the Minutes of the Meeting held on 11 September 2023 and published on the Council’s website.

39
Procedure
Item AUD 39/23

Disclosure of Interests

To receive from Members, declarations of interests in relation to any items included on the Agenda for this meeting, in accordance with the Waverley Code of Local Government Conduct.

40
Procedure
Item AUD 40/23

Questions by Members of the Public

The Chairman to respond to any questions received from members of the public of which notice has been duly given in accordance with Procedure Rule 10.

41
Procedure
Item AUD 41/23

Questions from Members

The Chairman to respond to any questions received from Members in accordance with Procedure Rule 11.

42
Procedure
Item AUD 42/23

WBC 2022/23 - Planning Enquiries

To formally agree our enquiries of management with reference to planning staffing and potential risks.

43
Procedure
Item AUD 43/23

Risk Management

To receive any updates on Risk Management. Including: Any near misses Changes in controls Notable successes Recruitment of Risk Officer

44
Report
Item AUD 44/23

Enquiries of Management

The purpose of this report is to contribute towards the effective two way communication between the Waverley Borough Council’s external auditors and the Audit and Standards committee, as ‘those charged with governance’.

1 paper, 404 KBSearch inside with Pro
ReportEnquiries of Management404 KBDownload
45
Report
Item AUD 45/23

2023-24 Audit Plan from Grant Thornton

To receive the Waverley 23-24 Audit Plan from Grant Thornton.

Report2023-24 Audit Plan from Grant Thornton6 MBDownload
46
Report
Item AUD 46/23

Annual Governance Statement - Interim Review & Consideration of Potential Governance Issues.

To receive an update on the AGS and enable the Committee to raise any potential emerging governance issues that may need to be addressed. Recommendation The Committee is invited to raise any potential emerging governance issues for consideration.

1 paper, 974 KBSearch inside with Pro
ReportAnnual Governance Statement: Interim Review & Consideration of Potential Governance Issues.974 KBDownload
47
Report
Item AUD 47/23

Review Audit Committee's Terms of Reference

To review the current terms of reference and make any recommendations to council for changes if necessary.

1 paper, 137 KBSearch inside with Pro
ReportReview Audit Committee's Terms of Reference137 KBDownload
48
Report
Item AUD 48/23

Audit Committee Annual Report

To note the committee annual report outlining the issues considered in 2022/23.

1 paper, 246 KBSearch inside with Pro
ReportAudit Committee Annual Report246 KBDownload
49
Report
Item AUD 49/23

REVIEW OF PROGRESS IN THE IMPLEMENTATION OF INTERNAL AUDIT ACTIONS

To inform the Audit Committee of Senior Management’s progress in implementing the actions raised by Internal Audit following a review in their service areas. This report will enable the Committee to consider what action is required in respect of those that are overdue or appear likely to be implemented later than the target date. Recommendation It is recommended that the Committee considers the information contained...

1 paper, 295 KBSearch inside with Pro
ReportREVIEW OF PROGRESS IN THE IMPLEMENTATION OF INTERNAL AUDIT ACTIONS295 KBDownload
50
Report
Item AUD 50/23

Review of the progress in achieving the Audit Plan

The Committee’s Terms of Reference include provision for the Committee to approve, monitor and comment on the progress made in the achievement of the Internal Audit Plan. An update on the current position of the internal audit reviews is attached. Recommendation It is recommended that the Committee notes the contents of the Internal Audit Progress report as attached.

2 papers, 630 KBSearch inside with Pro
AppendixAppendix 1: INTERNAL AUDIT PLAN 2023-24 PROGRESS REPORT APRIL 2023 TO OCTOBER 2023 V3.2 50/23439 KBDownload
ReportReview of the progress in achieving the Audit Plan191 KBDownload
51
Report
Item AUD 51/23

Fraud Investigation Summary

The report provides an update to the Committee on the work being completed in investigating fraud, primarily focusing on Housing Tenancy Fraud. Recommendation It is recommended that the Audit Committee notes the success of the fraud investigation activity.

2 papers, 308 KBSearch inside with Pro
AppendixAppendix 1: Fraud Investigaton Summary Qtr 1 & 2 of 2023-24 V0.1 51/23153 KBDownload
ReportFraud Investigation Summary155 KBDownload
52
Report
Item AUD 52/23

Audit Committee Recurrent Annual Work Programme

The Committee’s annual recurrent work programme is attached. The work programme details regular items, but other items can be submitted to each meeting on an ad hoc basis or at the request of the Committee. Recommendation The Audit Committee is invited to note its recurrent annual work programme.

1 paper, 224 KBSearch inside with Pro
ReportAudit Committee Recurrent Annual Work Programme224 KBDownload
53
Exempt parts
Item AUD 53/23

Exclusion of Press and Public

To consider the following recommendation on the motion of the Chairman: Recommendation That pursuant to Procedure Rule 20 and in accordance with Section 100A(4) of the Local Government Act 1972, the press and public be excluded from the meeting during consideration of the following item(s) on the grounds that it is likely, in view of the nature of the business to be transacted or the nature of the proceedings, that...

Read inside all 11 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

What this meeting moved on

1 journey

Every paper for this meeting

All 11 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
Enquiries of ManagementItem AUD 44/23, Enquiries of Management
404 KB
Kept 3 Oct
2023-24 Audit Plan from Grant ThorntonItem AUD 45/23, 2023-24 Audit Plan from Grant Thornton
6 MB
Kept 3 Oct
Annual Governance Statement: Interim Review & Consideration of Potential Governance Issues.Item AUD 46/23, Annual Governance Statement - Interim Review & Consideration of Potential Governance Issues.
974 KB
Kept 3 Oct
Review Audit Committee's Terms of ReferenceItem AUD 47/23, Review Audit Committee's Terms of Reference
137 KB
Kept 3 Oct
Audit Committee Annual ReportItem AUD 48/23, Audit Committee Annual Report
246 KB
Kept 3 Oct
REVIEW OF PROGRESS IN THE IMPLEMENTATION OF INTERNAL AUDIT ACTIONSItem AUD 49/23, REVIEW OF PROGRESS IN THE IMPLEMENTATION OF INTERNAL AUDIT ACTIONS
295 KB
Kept 3 Oct
INTERNAL AUDIT PLAN 2023-24 PROGRESS REPORT APRIL 2023 TO OCTOBER 2023 V3.2 50/23Appendix 1, item AUD 50/23, Review of the progress in achieving the Audit Plan
439 KB
Kept 3 Oct
Review of the progress in achieving the Audit PlanItem AUD 50/23, Review of the progress in achieving the Audit Plan
191 KB
Kept 3 Oct
Fraud Investigaton Summary Qtr 1 & 2 of 2023-24 V0.1 51/23Appendix 1, item AUD 51/23, Fraud Investigation Summary
153 KB
Kept 3 Oct
Fraud Investigation SummaryItem AUD 51/23, Fraud Investigation Summary
155 KB
Kept 3 Oct
Audit Committee Recurrent Annual Work ProgrammeItem AUD 52/23, Audit Committee Recurrent Annual Work Programme
224 KB
Kept 3 Oct

Last time, and what carried over

The committee last met on 11 September 2023. 5 of its items lead into this meeting; 3 items are new. Point at any item to follow a thread. Procedural items are left out.

Sep11
11 September 202321 items, 24 papers
Held
carried over
Nov27
27 November 202317 items, 11 papers
Held
AUD 22/23
Statement of AccountsThe purpose of this report is for the Audit Committee to consider and...
AUD 23/23
External Audit Findings Report2021-22. The Audit findings report presents the observations arising...
AUD 24/23
Value for Money ReportCommittee to note the Value for Money report.
AUD 25/23
Local Audit Delay Cross-system Statement and DLUHC Letter UpdateCommittee to note and comment.
AUD 26/23
2022-23 Annual Information and Data Management (IDM) ReportAUD 26/23 The purpose of this report is to reflect the journey taken...
AUD 27/23
Covert Surveillance PolicyCommittee to look at Reviewof WaverleyBorough Council’s...
AUD 28/23
Anti Money Laundering UpdateAnnual update and review of our Anti Money Laundering Policy. To...
AUD 29/23
Financial Regulations UpdateAUD 29/23 The Audit Committee is asked to consider the update to the...
AUD 31/23
Annual Governance Statement - Consideration of Potential Governance Issues.To enable the Committee to raise any potential emerging governance...
AUD 32/23
Review of the progress in achieving the Audit PlanThe Committee’s Terms of Reference include provision for the...
AUD 33/23
Review of Progress in the implementation of Internal Audit ActionsTo inform the Audit Committee of Senior Management’s progress in...
AUD 34/23
Audit Committee Recurrent Annual Work ProgrammeThe Committee’s annual recurrent work programme is attached. The work...
AUD 35/23
Exclusion of Press and PublicTo consider the following recommendation on the motion of the...
AUD 44/23
Enquiries of ManagementNew this time
AUD 45/23
2023-24 Audit Plan from Grant ThorntonTo receive the Waverley 23-24 Audit Plan from Grant Thornton.
AUD 46/23
Annual Governance Statement - Interim Review & Consideration of Potential Governance Issues.To receive an update on the AGS and enable the Committee to raise any...
AUD 47/23
Review Audit Committee's Terms of ReferenceTo review the current terms of reference and make any recommendations...
AUD 48/23
Audit Committee Annual ReportNew this time
AUD 49/23
REVIEW OF PROGRESS IN THE IMPLEMENTATION OF INTERNAL AUDIT ACTIONSTo inform the Audit Committee of Senior Management’s progress in...
AUD 50/23
Review of the progress in achieving the Audit PlanThe Committee’s Terms of Reference include provision for the...
AUD 51/23
Fraud Investigation SummaryNew this time
AUD 52/23
Audit Committee Recurrent Annual Work ProgrammeThe Committee’s annual recurrent work programme is attached. The work...
AUD 53/23
Exclusion of Press and PublicTo consider the following recommendation on the motion of the...

The threads

  • Annual Governance Statement - Consideration of Potential Governance Issues. leads to item AUD 46/23, Annual Governance Statement - Interim Review & Consideration of Potential Governance Issues.
  • Review of the progress in achieving the Audit Plan leads to item AUD 45/23, 2023-24 Audit Plan from Grant Thornton
  • Review of the progress in achieving the Audit Plan leads to item AUD 47/23, Review Audit Committee's Terms of Reference
  • Review of the progress in achieving the Audit Plan leads to item AUD 49/23, REVIEW OF PROGRESS IN THE IMPLEMENTATION OF INTERNAL AUDIT ACTIONS
  • Review of the progress in achieving the Audit Plan leads to item AUD 50/23, Review of the progress in achieving the Audit Plan
  • Review of Progress in the implementation of Internal Audit Actions leads to item AUD 47/23, Review Audit Committee's Terms of Reference
  • Review of Progress in the implementation of Internal Audit Actions leads to item AUD 49/23, REVIEW OF PROGRESS IN THE IMPLEMENTATION OF INTERNAL AUDIT ACTIONS
  • Review of Progress in the implementation of Internal Audit Actions leads to item AUD 50/23, Review of the progress in achieving the Audit Plan
  • Audit Committee Recurrent Annual Work Programme leads to item AUD 52/23, Audit Committee Recurrent Annual Work Programme
  • Exclusion of Press and Public leads to item AUD 53/23, Exclusion of Press and Public

Not carried over

Statement of Accounts, External Audit Findings Report, Value for Money Report, Local Audit Delay Cross-system Statement and DLUHC Letter Update and 4 more do not return this time.

See the 11 September meeting

This committee over time

Every Audit & Risk Committee meeting we have read, the dates it has set for the future, and each time those dates have changed.

85 meetings, 2008 to 2026Dot size shows the number of papers
2008201120142017202020232026
HeldThis meeting
MeetingItemsPapers
9 Dec 2026Wednesday
0items
0papers
UpcomingOpen
16 Sep 2026Wednesday
13items
18papers
HeldOpen
27 Jul 2026Monday
16items
22papers
HeldOpen
11 Mar 2026Wednesday
12items
12papers
HeldOpen
28 Jan 2026Wednesday
11items
11papers
HeldOpen
26 Nov 2025Wednesday
12items
9papers
HeldOpen
21 Oct 2025Tuesday
6items
7papers
HeldOpen
10 Sep 2025Wednesday
16items
22papers
HeldOpen
18 Jun 2025Wednesday
19items
16papers
HeldOpen
24 Mar 2025Monday
20items
20papers
HeldOpen
27 Jan 2025Monday
11items
9papers
HeldOpen
25 Nov 2024Monday
19items
24papers
HeldOpen
9 Sep 2024Monday
17items
26papers
HeldOpen
8 Jul 2024Monday
6items
7papers
HeldOpen
17 Jun 2024Monday
17items
18papers
HeldOpen
25 Mar 2024Monday
15items
12papers
HeldOpen
29 Jan 2024Monday
0items
0papers
HeldOpen
27 Nov 2023Monday, this meeting
17items
11papers
11 Sep 2023Monday
21items
24papers
HeldOpen
8 Aug 2023Tuesday
0items
0papers
HeldOpen
20 Jun 2023Tuesday
15items
15papers
HeldOpen
13 Mar 2023Monday
15items
8papers
HeldOpen
28 Nov 2022Monday
14items
10papers
HeldOpen
12 Sep 2022Monday
13items
7papers
HeldOpen
13 Jun 2022Monday
16items
15papers
HeldOpen
28 Mar 2022Monday
19items
21papers
HeldOpen
31 Jan 2022Monday
0items
0papers
HeldOpen
29 Nov 2021Monday
12items
8papers
HeldOpen
8 Nov 2021Monday
15items
6papers
HeldOpen
20 Sep 2021Monday
0items
0papers
HeldOpen
6 Sep 2021Monday
18items
20papers
HeldOpen
2 Aug 2021Monday
15items
12papers
HeldOpen
1 Mar 2021Monday
16items
12papers
HeldOpen
30 Nov 2020Monday
7items
3papers
HeldOpen
9 Nov 2020Monday
14items
10papers
HeldOpen
14 Sep 2020Monday
18items
16papers
HeldOpen
20 Jul 2020Monday
15items
14papers
HeldOpen
2 Mar 2020Monday
14items
16papers
HeldOpen
26 Nov 2019Tuesday
17items
16papers
HeldOpen
24 Sep 2019Tuesday
16items
11papers
HeldOpen
22 Jul 2019Monday
15items
11papers
HeldOpen
4 Mar 2019Monday
21items
27papers
HeldOpen
5 Nov 2018Monday
17items
11papers
HeldOpen
25 Sep 2018Tuesday
17items
18papers
HeldOpen
24 Jul 2018Tuesday
20items
20papers
HeldOpen
27 Mar 2018Tuesday
18items
13papers
HeldOpen
20 Nov 2017Monday
16items
15papers
HeldOpen
26 Sep 2017Tuesday
15items
12papers
HeldOpen
24 Jul 2017Monday
16items
16papers
HeldOpen
21 Mar 2017Tuesday
16items
13papers
HeldOpen
15 Nov 2016Tuesday
15items
18papers
HeldOpen
13 Sep 2016Tuesday
12items
15papers
HeldOpen
21 Jun 2016Tuesday
16items
22papers
HeldOpen
15 Mar 2016Tuesday
12items
9papers
HeldOpen
17 Nov 2015Tuesday
13items
6papers
HeldOpen
15 Sep 2015Tuesday
13items
9papers
HeldOpen
23 Jun 2015Tuesday
13items
11papers
HeldOpen
23 Mar 2015Monday
16items
14papers
HeldOpen
19 Nov 2014Wednesday
13items
11papers
HeldOpen
17 Sep 2014Wednesday
13items
7papers
HeldOpen
25 Jun 2014Wednesday
0items
0papers
HeldOpen
18 Mar 2014Tuesday
0items
0papers
HeldOpen
19 Nov 2013Tuesday
0items
0papers
HeldOpen
17 Sep 2013Tuesday
0items
0papers
HeldOpen
25 Jun 2013Tuesday
0items
0papers
HeldOpen
19 Mar 2013Tuesday
0items
0papers
HeldOpen
20 Nov 2012Tuesday
0items
0papers
HeldOpen
18 Sep 2012Tuesday
0items
0papers
HeldOpen
26 Jun 2012Tuesday
0items
0papers
HeldOpen
20 Mar 2012Tuesday
0items
0papers
HeldOpen
22 Nov 2011Tuesday
0items
0papers
HeldOpen
20 Sep 2011Tuesday
0items
0papers
HeldOpen
21 Jun 2011Tuesday
0items
0papers
HeldOpen
8 Mar 2011Tuesday
0items
0papers
HeldOpen
23 Nov 2010Tuesday
0items
0papers
HeldOpen
28 Sep 2010Tuesday
0items
0papers
HeldOpen
22 Jun 2010Tuesday
0items
0papers
HeldOpen
22 Mar 2010Monday
0items
0papers
HeldOpen
24 Nov 2009Tuesday
0items
0papers
HeldOpen
22 Sep 2009Tuesday
0items
0papers
HeldOpen
29 Jun 2009Monday
0items
0papers
HeldOpen
10 Mar 2009Tuesday
0items
0papers
HeldOpen
25 Nov 2008Tuesday
0items
0papers
HeldOpen
23 Sep 2008Tuesday
0items
0papers
HeldOpen
24 Jun 2008Tuesday
0items
0papers
HeldOpen

Follow the Audit & Risk Committee

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

Waverley, Audit & Risk Committee

Audit & Risk Committee: 3 kinds of updateWaverley, sent the same day
PDF
11 papers published for 27 November2023-24 Audit Plan from Grant Thornton and 10 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 27 NovemberThe committee's resolutions, the day they are recorded
ABC
"audit" found in 7 papers2023-24 Audit Plan from Grant Thornton and Review Audit Committee's Terms of Reference
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Audit & Risk Committee, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies