Item152
Resolved
RESOLVED that Reserved Matters BE APPROVED, subject to the conditions set out in the agenda report. Response to Parish Council • Amended plans have been submitted to show proposed routes of footpath connection/rights of way and proposed diversions that fall within this reserved matters application. Subsequent reserved matters application(s) will similarly show proposed routes of footpath connection/rights of way and proposed diversions. Full details and specifications are also required through conditions attached to the outline consent and would be discharged through the condition discharge application process. Through these various approval processes the development will be required to deliver the required level of connectivity to the surrounding area. • The matter relating to the bridge over the railway was considered at the outline application. The Inspector attached Condition 18 that restricts occupation of dwellings until a scheme for the provision of safety measures at the Vine No.2 footpath level crossing and the stopping up of level crossings where required has been submitted to and approved in writing by the Local Planning Authority. The issue of a footbridge across the railway line had been raised in consideration of the outline application but was ruled out on issue of prohibitive costs. • The location of the two site accesses are in accordance with the approved access details as conditioned in the appeal decision (Condition 12). • The application is solely for the spine road and infrastructure including surface water drainage. It is noted that some drawings indicate proposed land uses on future phases - however for the avoidance of doubt these would be outside the remit of the extant planning permission and therefore reserved matters and would require a new planning application. • The built development is on Flood Zone 1. Response to Polegate Town Council • The submitted drainage drawings gives the top water level, the base level, the freeboard above top water level, the attenuated volume for the 100 year event including 45% climate change allowance and 10% urban creep. Drainage basins have a 3m maintenance strip around them. • ESCC LLFA have confirmed that the information provided is satisfactory and enables the PCWLMB and LLFA to determine that the proposed development is capable of managing flood risk effectively. The applicant has provided details of overland flow routes/exceedance flows. The applicant will be providing further detailed submissions through the condition discharge process as per the ... view the full minutes text for item 152.
Word for word from the decision Wealden published for this meeting.
Source: council.wealden.gov.uk