SWAN LODGE, BELL LANE, BROOKMANS PARK, HATFIELD, AL9 7AY - 6/2016/0168/FULL - ERECTION OF 8 NO. ONE AND TWO BEDROOM APARTMENTS, CAR PORT, REFUSE AND RECYCLING STORE AND ASSOCIATED WORKS FOLLOWING DEMOLITION OF EXISTING BUILDINGS
ApprovedCommittee1 paper
Development Management Committee approved this item on Thursday 21 July 2016. Below is the council's own wording, with the papers it was decided on.
RESOLVED (12 voting for and 3 against) That planning permission for application 6/2016/0168/FULL be approved subject to the amendment of condition 1 as set out below, the deletion of condition 12 and the following amendment to condition 11 as well as the other conditions set out in the report of the Director (Governance) – Condition 1: The development/works shall not be started and completed other than in accordance with the approved plans and details: PSL01 & PSL02 & PSL03 received and dated 2.2.2016 and Landscape Masterplan received 1.6.2016 (and dated 24.5.2016) and PSL05/ RevA & PSL07/ RevA & PSL10 received and dated 23.6.2016 & PSL08 & PSL09 received and dated 26.6.2016 and PSL04/ RevB & PSL06/ RevB received and dated 6.7.2016. REASON: To ensure that the development is carried out in accordance with the approved plans and details. Condition 11: Notwithstanding the approved plans, the areas set aside for car parking shown on Plan Number PSL04/ RevB shall be laid out, surfaced and marked out in accordance with a scheme which has been submitted to and agreed in writing by the Local ... view the full minutes text for item 33.
Word for word from the decision Welwyn Hatfield published for this meeting.Source: democracy.welhat.gov.uk
WELWYN HATFIELD BOROUGH COUNCIL DEVELOPMENT MANAGEMENT COMMITTEE – 21 JULY 2016 REPORT OF THE DIRECTOR (GOVERNANCE)
6/2016/0168/FULL
SWAN LODGE, BELL LANE, BROOKMANS PARK, HATFIELD AL9 7AY
ERECTION OF 8NO ONE AND TWO BEDROOM APARTMENTS, CAR PORT, REFUSE AND RECYCLING STORE AND ASSOCIATED WORKS FOLLOWING DEMOLITION OF EXISTING BUILDINGS
APPLICANT: Restora AC Ltd
(Brookmans Park and Little Heath)
1 Site Description
1.1The application site comprises a detached, two storey building and its gardens and outbuildings on the north-west corner of the junction of Great North Road and Bell Lane, Bell Bar. The site covers 0.18 Hectares, is approximately 40m deep and splays from 18m wide on the southern frontage on Bell Lane to 40m wide at the rear where it abuts the boundary with Richmond House, a detached residential property to the north. To the west of the site is an open area which separates the application site from the buildings at No’s 2 and 2a Bell Lane. To the east is the Great North Road, which is lined with trees.
1.2The building was previously used as a public house but appears to have been in residential use since the 1950’s. The current use is as a short term letting for around eight people.
1.3The building is positioned on the corner of the site and faces onto the road junction. It is set back 1m from the footpath and approximately 2.8m from the carriageway. There is a milestone on the corner of the site against the front wall of the property. The site’s vehicle access is to the south side of the site from Bell Lane and is fenced and gated. There is an area 5m deep for off- street parking in front of the fence. Within the site there is a garage and car port and behind that on the western boundary there is a pool house of sound wooden construction with a brick plinth. The remainder of the garden is lawn and shrubs with some trees along the north and east boundaries. From a mid-point of the site the land falls to the rear boundary.
1.4There are views out across the fields to the north west of the site. Richmond House, to the north, is on lower land and the side elevation of the house is set in 2m from the boundary with Swan Lodge. The open land immediately to the south is 35m wide and the nearest buildings are the Grade II Listed Lower Farm house at No 2 and barn at 2a, which sits behind the house.
2 The Proposal
2.1Full planning permission is sought to demolish the existing building and outbuildings and replace them with a new building of eight flats (6 x 2 bedroom and 2 x 1 bedroom) and a carport/bicycle store.
2.2The new dwelling would be L-shaped with a feature corner facing the junction but positioned 3.5m from the footway (5m from the road). The footprint would be 235sqm measuring 16m wide by 16m deep (excluding the bay windows at ground floor). The building would be two storeys high with accommodation in the roof.
2.3The roof would be pitched with a central crown, dormers to the rear and roof- lights to the front. Amended plans show the roof would be 8m high with 5m high eaves, hipped to the ends and on the corner feature facing the junction.
2.4The external walls would be finished in white render with a natural stone band between ground and first floor. The roof would be tiled in materials and style to be agreed with the Local Planning Authority. The window frames and door frames would be upvc.
2.5The existing vehicle access would be retained. A driveway would provide access to parking for 12 cars: 9 open spaces at the rear of the site and 3 within a repositioned garage/carport. A cycle store would be provided within the garage. A refuse bin store would be provided on the western boundary; 23m from the road.
2.6The site boundary to Bell Lane would consist of 1m high post and rail fencing with evergreen hedging behind to 1.5m. The vehicle access would have 2m high timber gates set 6m back from the footway.
3. Reason for Committee Consideration
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
SWAN LODGE, BELL LANE, BROOKMANS PARK, HATFIELD, AL9 7AY: 6/2016/0168/FULL: ERECTION OF 8 NO. ONE AND TWO BEDROOM APARTMENTS, CAR PORT, REFUSE AND RECYCLING STORE AND ASSOCIATED WORKS FOLLOWING DEMOLITION OF EXISTING BUILDINGSReport
33SWAN LODGE, BELL LANE, BROOKMANS PARK, HATFIELD, AL9 7AY - 6/2016/0168/FULL - ERECTION OF 8 NO. ONE AND TWO BEDROOM APARTMENTS, CAR PORT, REFUSE AND RECYCLING STORE AND ASSOCIATED WORKS FOLLOWING DEMOLITION OF EXISTING BUILDINGSThis decision
Follow Development Management Committee at Welwyn Hatfield and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.