(10 voting for, 3 against) That planning permission be refused for the reasons set out in the report of Officers. REFUSED DRAWING NUMBERS Plan Number Revision Number Details Received Date 22823A-02 P11 Proposed Site Plan 24 September 2018 22823A-03 P1 Proposed Site Plan, Sections, Location Plan 24 September 2018 POSITIVE AND PROACTIVE STATEMENT The decision has been made taking into account, where practicable and appropriate the requirements of paragraph 38 of the National Planning Policy Framework and material planning considerations ... view the full minutes text for item 99.
Word for word from the decision Welwyn Hatfield published for this meeting.Source: democracy.welhat.gov.uk
WELWYN HATFIELD BOROUGH COUNCIL DEVELOPMENT MANAGEMENT COMMITTEE – 31 JANUARY 2019 REPORT OF THE CORPORATE DIRECTOR (PUBLIC PROTECTION, PLANNING AND GOVERNANCE)
6/2018/2199/FULL
94 HARMER GREEN LANE DIGSWELL WELWYN AL6 0EP
INSTALLATION OF STAND ALONE SOLAR PV PANELS, ASSOCIATED PLANTING AND GROUND WORKS
APPLICANT: [name removed]
(Welwyn East)
1 Site Description
1.1The application site is in the Green Belt. It comprises a trapezoid of land measuring 55m long and 44m wide covering an area of approximately 1,800sqm within a meadow which belongs to the owners of No 94 Harmer Green Lane and lies to the west side of the landscaped grounds of that property. The new house under construction at No 94 was granted planning permission in 2015 (reference number 6/2015/1588/FULL).
1.2The meadow is currently partly planted as a wild flower meadow which reverts to earth/grass in the winter and also contains a mature tree. It is accessed through a gate on its eastern boundary from the landscaped grounds belonging to No 94. There is also a gate onto the public footpath that runs along the southern boundary of the meadow. The north of the meadow is marked by the hedge on the boundary with the rear gardens of No’s 90 and 92 Harmer Green Lane. To the west the meadow is edged by a thick copse of trees.
1.3The application site is semi-circular and is set in a slight dip in the landscape approximately 19m from the rear garden boundaries of No’s 90 and 92 Harmer Green Lane. At the time of the Officer site visit in December 2018 the land had been further excavated into a slight depression. These excavation works also require planning permission as they are in association with the proposed photovoltaic panels.
2 The Proposal
2.1The applicant seeks planning permission to excavate a hollow to house 67 photovoltaic panels. A similar development was proposed earlier in 2018 for the erection of 67 stand-alone pv panels in straight line on the surface of the meadow (Ref No 6/2018/0195/FULL) was refused for the reasons of inappropriateness and harm to the Green Belt and adverse impact on the Landscape Character Area.
2.2The current proposal seeks to address the reason for refusal. The design has been driven by the technological requirements of a scheme to provide energy for the house. The panels would be connected to the house at No 94 Harmer Green Lane by underground cable. They would provide a 20KWP (kilowatt peak) supply for the house to run a borehole pump, ground source heat pump and for general domestic use.
2.3The amendments from the previous application include
Excavation of a horseshoe shaped hollow (approx. 22m by 20m) 1 to 1.5m deep
Sides bunded approximately 1m above surrounding land to achieve a depth of approximately 2.5m
Flat base 15m x 15m to house 67 photovoltaic panels in five rows
Panels would be black, set on frames on posts in the ground, top edge of panels approximately 1.3m high, angled at 20 degrees to face south
Plant 6 new trees to south of panels
NB all measurements are approximate.
3 Reason for Committee Consideration
3.1This application is presented to the Development Management Committee because Councillor Trigg and Councillor Cragg have called it in.
3.2Councillor Trigg has called it in for the following reason:
“I support environmentally friendly schemes and I believe this revised scheme will not harm the green belt.”
3.3Councillor Cragg has called it in for the following reason:
“I have concerns about the scale of the proposed development and its impact on the visual amenities of neighbouring occupiers and the green belt."
4 Relevant Planning History
4.1Application Number: 6/2015/1588/FULL Decision: Granted Decision Date: 14 December 2015 Proposal: Erection of new dwelling and associated landscaping works following demolition of existing dwelling
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
94 HARMER GREEN LANE DIGSWELL WELWYN AL6 0EP: 6/2018/2199/FULL: INSTALLATION OF STAND ALONE SOLAR PV PANELS, ASSOCIATED PLANTING AND GROUND WORKSReport
9994 HARMER GREEN LANE DIGSWELL WELWYN AL6 0EP - 6/2018/2199/FULL - INSTALLATION OF STAND ALONE SOLAR PV PANELS, ASSOCIATED PLANTING AND GROUND WORKSThis decision
94 HARMER GREEN LANE DIGSWELL WELWYN AL6 0EP - 6/2018/2199/FULL - INSTALLATION OF STAND ALONE SOLAR PV PANELS, ASSOCIATED PLANTING AND GROUND WORKSThis decision
Follow Development Management Committee at Welwyn Hatfield and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.