(Unanimously) 1. That the previous Panel decision of the 31 January 2019 be upheld in light of the fact there have been no changes to the proposal before them and that there has been no change in policy that would result in ... view the full minutes text for item 7.
Word for word from the decision Welwyn Hatfield published for this meeting.Source: democracy.welhat.gov.uk
1.1The appeal is against the refusal of Estate Management (EM) Consent for the Installation of 1 x rear dormer to facilitate extension of existing loft. The application (reference: 6/2019/0221/EM) was refused on the 28 March 2019 for the following reason:
“The rear dormer window would be unacceptable by virtue of its width, height, scale and siting on the rear roof slope of the dwelling which is overtly visible from an number of properties in the area and from the public footpath to the east. The dormer would result in a visually discordant and incongruous feature that would be detrimental to the appearance of the house and wider area, failing to maintain and enhance the amenities and values of the Garden City in accordance with Policy EM1 of the Estate Management Scheme”.
2 Site Description
2.1The appeal site is a two storey mid terrace dwelling house, located on the north side of Howlands. The application property is located within a row of 13 terraced houses. The rear of this terrace, and the appeal property itself, is open to public views from a public footpath that runs across the rear of the terrace to the east.
2.2None of the 13 terraced houses in this group have dormer windows.
3 The Proposal and Background 3.1 The appellant’s proposal is to install a rear dormer to facilitate the extension of existing loft. The proposed rear dormer window would measure at approximately 5.2m in width and be set in 0.74m on the west side and 0.94m on the east side of the party walls of the adjoining properties. Its height would be at the ridge height of the main roof and not set down.
3.2This proposal is identical to an application that was refused EM consent in September 2018 (ref: 6/2018/1861/EM). This September 2018 proposal was heard by the EM Scheme Panel on the 31 January 2019.
3.3The Panel resolved to uphold the original decision and dismiss the appeal. The Panel decision is included as Appendix 1. The Council’s appeal statement is included as Appendix 2.
3.4The appellants then submitted an identical application because they wished for it to be determined and then have another opportunity to have the case heard at the appeal’s panel.
3.5The appellants were advised to alter the proposal to try to overcome the reason for refusal before taking it back to any appeals panel, but this advice was not taken on board.
3.6It should be emphasised that a previous consent in July 2018 allowed for two separate smaller rear dormers that would achieve a similar room layout (bedroom and en-suite) as that required by the appellants. The rear elevation for the two rear dormers as approved is included as Appendix 3.
3.7The appellants were advised that they can implement this July 2018 consent, nevertheless, they wish to have more usable space, so wish to progress the proposal for an elongated dormer window.
4.2In order to be able to respond to the large amounts of requests for roof alterations and energy efficiency measures such as Solar PV panels, following public consultation the council has approved a Policy approach with the Welwyn Garden Estate Management scheme areas to deal with roof alteration as follows:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.