AI summaryWelwyn Hatfield Cabinet Housing Panel notes stock condition survey showing 2.3% of homes fail Decent Homes Standard, with £972.1m 30-year investment forecast and remaining 1,800 surveys to be completed by March 2026.
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Resolved
Cabinet Housing Panel noted the content of the report.
Part I Main author: Janice White Executive Member: Cllr Gemma Moore Wards impacted: All
WELWYN HATFIELD BOROUGH COUNCIL CABINET HOUSING PANEL – 17 FEBUARY 2026 REPORT OF EXECUTIVE DIRECTOR (RESIDENT SERVICES AND CLIMATE CHANGE)
COUNCIL SOCIAL HOUSING STOCK CONDITION SURVEY
1 Executive Summary 1.1 The Social Housing (Regulation) Act 2023 requires landlords to maintain accurate knowledge of their housing stock. While a full survey of all properties is not mandatory, best practice is moving toward a rolling 100% survey every five years. This report outlines findings from the recent survey and the next steps.
2 Recommendation(s) 2.1 Cabinet Housing Panel is asked to note the content of the report.
3 Explanation 3.1 The stock condition survey was undertaken in 2024/25 and assessed properties against the Decent Homes Standard set by the Ministry of Housing, Communities & Local Government (MHCLG). It included checks for hazards under the Housing Health and Safety Rating System (HHSRS) and reviewed key building components, modern facilities, and thermal comfort. 3.2 Overall, the housing stock is in good condition following previous Decent Homes investment. Forecast costs for the next five years are £45.2m, with kitchen and window renewals accounting for around 58% of this. However, significant expenditure is expected in years 6–10, totalling £137.6m, of which £80.8m (59%) relates to external works such as walls, roofs, windows, doors, fencing, and paving. 3.3 At the time of the survey, 151 dwellings (2.3%) failed the Decent Homes Standard, compared to a national average of 11% for social housing (23% private rented, 14% owner-occupied). Works were/are being undertaken to address this, Key Findings 3.4 Survey Coverage: A total of 8,628 homes were assessed, with 79% physically surveyed, including all blocks and communal areas. For properties that could not be accessed, data from similar neighbouring homes was cloned and applied. This approach ensures a complete dataset to support accurate planning for component replacement programmes. 3.5 Condition: Stock remains in good condition following previous investment. 3.6 Non-Decent Homes: 151 properties (2.3%) failed the standard, mainly due to carbon monoxide alarms (which has been addressed). Damp and mould issues identified during the survey have been resolved. 3.7 Energy Efficiency: Average SAP score is 71.4, consistent with the national social housing average. Environmental Impact Rating is 83.3, indicating relatively low CO₂ emissions.
-1- 3.8 Financial Forecast: 3.8.1.1 30-year investment: £972.1m (£112,663 per dwelling). 3.8.1.2 Peak spend in years 6–10: £220.6m, mainly for external works (roofs, walls, windows, doors). 3.8.1.3 Kitchens and heating require the largest investment due to lifecycle replacements. Housing Health and Safety Rating System, (HHSRS) 3.9 The HHSRS assessment found that the vast majority of hazards across the housing stock were rated as typical, with no severe risks identified in most categories. The most notable issues were moderate risks related to carbon monoxide (46%), damp and mould (11%), and structural failure (3%), with 1% of properties showing severe damp/mould and electrical hazards. All severe hazards identified during inspections have been addressed. All reported hazardous were investigated and all works were completed, meaning that the table is a moment in time. 3.10 All properties were inspected, and the elevated number of carbon monoxide hazards was found to be primarily due to residents removing the alarm batteries or relocating the devices. The annual servicing programme ensures that all carbon monoxide alarms are checked and maintained in full working order. 3.11 Where hazards cannot be measured by a stock condition survey, then these are assumed to have a normal risk.
Aids and Adaptations
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
STOCK CONDITION SURVEY REPORTReport | 174 KB | DownloadRead as text |
PDF |
WHBC STOCK CONDITION SURVEY EXECUTIVE SUMMARY REPORTReport | 137 KB | Download |
Follow Cabinet Housing Panel at Welwyn Hatfield and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 18 Jun 2026 | Apologies & substitutionsRESOLVED – that Councillor Scott take the Chair for the meeting. | Decided | Open |
| 18 Jun 2026 | Introduction to Cabinet Housing PanelRESOLVED – that the Panel noted the presentation. | Noted | Open |
| 18 Jun 2026 | Altair Regulatory ReviewRESOLVED THAT – 1. the Cabinet Housing Panel gave due consideration ... view the full minutes text for item 149. | Decided | Open |
| 18 Jun 2026 | Annual Review of Key Housing Service AreasIt was agreed that this could be reviewed at the Cross-Party Housing Group and that regular void performance ... view... | Agreed | Open |
| 18 Jun 2026 | Annual Review - Building SafetyRESOLVED – that the Panel gave due consideration to and appropriately scrutinised the position on performance and the... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.