That planning application 0060/FUL relating to land adjacent to Railway Line, Sandy Lane, Aughton be refused for the reasons as set out below:- The proposed development, by virtue of its siting, scale and design, would result in harm to the Green Belt by virtue of inappropriateness, loss of openness and conflict with one of the purposes of including land in the Green Belt (safeguarding the countryside from encroachment), contrary to the NPPF and Policy GN1 of the West Lancashire Local Plan 2012-2027 Development Plan Document. The harm is not outweighed by the circumstances of the application. The proposed development, by virtue of its siting, scale and design, would result in harm to the visual amenity of the locality and conflict with the local landscape character and therefore conflict with Policies GN3 and EN2 in the West Lancshire Local Plan.
Word for word from the decision West Lancashire published for this meeting.Source: democracy.westlancs.gov.uk
3.1By virtue of the loss of openness and conflict with one of the reasons for including land in the Green Belt (encroachment) the proposed development constitutes an inappropriate form of development in the Green Belt giving rise to harm to it. This harm must be attributed substantial weight. In addition, the development will give rise to an adverse impact on the character and visual quality of the locality and therefore conflict with Policies GN1, GN3 and EN2 in the West Lancashire Local Plan (WLLP). Whilst some of this impact can be ameliorated by landscape planting, additional weight against the development is recognised.
3.2However, the NPPF, including section 13 relating to the Green Belt, recognises the strategic importance of sustainable transport and the significant wider environmental, social and economic benefits arising in comparison to the use of private petrol and diesel driven vehicles. Whilst the development would have an impact on the immediate locality I consider the wider benefits of sustaining and enhancing public transport provision do amount to very special circumstances and those circumstances outweigh the identified harm. The scheme would not result in significant harm to the surrounding land uses and I therefore recommend that planning permission is granted subject to conditions.
4.0THE SITE
4.1The application site is an area of active agricultural field of approx. 2000 m 2 lying immediately west of the Liverpool-Ormskirk railway line and associated fenced embankment to the north of Sandy Lane. The land lies below the level of the railway lines but above the level of the adjacent narrow lane. To the south-east is the railway underpass to Mickering Lane where residential properties are present. The end dwelling and gardens on the northern side of Mickering Lane lies immediately east of the railway embankment. The site is otherwise surrounded by open arable land.
5.0THE PROPOSAL
5.1The application proposes a line of electricity transformation apparatus serving the adjacent Ormskirk-Liverpool railway line. The apparatus consists of (from north to south): Name Length (m) Depth (m) Height (m) Isolation transformer 1.35 1.3 1.55 Auxiliary transformer 1.5 1.5 2.1 AC Module 7.1 3.5 3.55 Rectifier Transformer 4.2 2.8 4.05 Rectifier Module 6.0 2.7 3.55 DC Module 5.3 3.0 3.05 4no. Track Feeder 2.0 1.2 2.15 Switches All dimensions approximate
5.2The transformers appear as 'naked' apparatus finished in light grey; the remainder of the structures appear as cabinet buildings also finished in light grey. The site is proposed to be fenced and gated by 3.0 metre high, moss green finished, palisade fencing with external landscaping to be agreed. Within the site 0.76 metre high Armco barrier lengths will be offset between 4.5-6.0 metres from the apparatus on their western and southern sides. A curved 6.0 metre wide access track from Sandy Lane is proposed.
5.3Some infrastructure works associated with the development will take place within the existing rail corridor – primarily new cable laying, such works are granted permission by virtue of the Town and Country Planning (General Permitted Development)(England) Order 2015 and are therefore outside the scope of the determination of this application.
6.0PREVIOUS RELEVANT DECISIONS
6.1None
7.0OBSERVATIONS OF CONSULTEES
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.