That in respect of planning application 0719/FUL relating to Land to the South of Northfield, Skelmersdale: (i) That the decision to grant planning permission be delegated to the Corporate Director of Place and Community in consultation with the Chairmanot Vice Chairman of the Planning Committee subject to the applicant entering into a planning obligation under S106 of the Town and Country Planning Act 1990 to require: The terms and conditions of the affordable housing. (ii) That any planning permission granted by the Corporate Director of Place and Community be pursuant to the conditions as set out on pages 982 to 987 of the Book of Reports.
Word for word from the decision West Lancashire published for this meeting.Source: democracy.westlancs.gov.uk
1.1This application is for the construction of 27 dwellings. Six of the dwellings will be affordable. The proposed design, layout and appearance is considered to be acceptable. The development will not have a significant detrimental impact on highway safety and adequate parking has been provided. Satisfactory interface distances have been achieved in order to protect neighbouring residential amenity. I consider the proposal complies with the relevant policies of the Local Plan and is acceptable in principle.
2.0RECOMMENDATION: APPROVE WITH CONDITIONS AND A S106 AGREEMENT
3.0THE SITE
3.1The site is an undeveloped overgrown field which lies to the east of Whalleys Road, to the north of Ashurst Road and to the south of Northfield, an access road which serves St. James Catholic Primary School is located to the east of the site. The site is mainly grassed with trees and shrubs.
4.0THE PROPOSAL
4.1This application seeks planning permission for the construction of 27 dwellings. Six of the dwellings will be affordable. The units will comprise of a mix of 2, 3 and 4 bed, detached and semi-detached two storey properties. A new vehicular access is proposed to the south of the site off Ashurst Road.
5.0PREVIOUS RELEVANT DECISIONS
5.1None.
6.0OBSERVATIONS OF CONSULTEES
6.1LCC School Planning Team (24.07.19) - Contribution towards educational places not required.
6.2LCC Highways (05.08.19 & 28.02.20) – No Objections subject to conditions.
6.3United Utilities (13.08.19) – No objection subject to conditions.
6.4The Coal Authority (05.18.19) - No objection subject to conditions.
6.5MEAS (29.08.19) - No Objection; Suggests conditions.
6.6Lead Local Flood Authority (20.09.19) No Objections subject to conditions. 6.7 Environmental Health (11.10.19) – No Objections subject to phase 2 ground investigation condition.
6.8Environmental Health (23/10/19) – No Objections subject to noise assessments.
7.0OTHER REPRESENTATIONS
7.1I have received a considerable number of objections from local residents in response to the proposal. I have also received a petition containing approximately 145 signatures. The main points of concern are summarised as follows:
Loss of wildlife – deer, hedgehogs, bats and birds. Loss of mature trees. Loss of amenity area used by dog walkers and children. Loss of open greenspace. Importance of green spaces to mental and emotional wellbeing. Damage to nature conservation.
Increase in traffic congestion in an already busy area. Increase in traffic pollution. Highways safety issues – danger to school children entering and leaving the school.
Too many new houses being built in the area – five sites currently under construction within 500m of the site – an excess of 1000 new homes.
Lack of services for new house owners which include schools, doctors, dentist, buses. The area is being overwhelmed by housing with no regard for the fact that there is only one GP practice, one dental surgery, very few shops and insufficient parking. School availability is inadequate for the increasing population. The infrastructure simply cannot cope. Public transport is non-existent after 7pm.
Lack of parking in the area – existing parking problems with the school next door, this land would be best put to use as a car park for the adjacent school. Believe the school have previously enquired about using this land as a car park but have been turned down.
Increase in surface water flooding from increase in hard surface area and flash flooding when surface water is piped to the river. The subway out of Melbreck has been permanently flooded since before Christmas. Building more houses would not improve the area.
Increase in noise, dust and large vehicles during construction stage.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.