That planning application 2023/0922/FUL relating to Land to West of Appley Lane North, Appley Bridge be refused against officer recommendation on grounds of impact on the amenity of local residents and the nearby school. The proposal by virtue of the excessive comings and goings of heavy goods vehicles (HGVS) would give rise to adverse impacts on the living conditions of residents of Appley Lane North, and adverse impacts on the visitors and pupils of the All Saints School and is therefore contrary to Policy GN3 of the West Lancashire Local Plan 2012-2027 and the relevant provisions of the National Planning Policy Framework revised December 2023. The proposal by virtue of the excessive levels of light pollution would give rise to adverse impacts on the living conditions of residents of Appley Lane North and is therefore contrary to Policy GN3 of the West Lancashire Local Plan 2012-2027 and the relevant provisions of the National Planning Policy Framework revised December 2023.
Word for word from the decision West Lancashire published for this meeting.Source: democracy.westlancs.gov.uk
1.1To advise Planning Committee on an application which seeks retrospective planning permission for Erection of 3 no. cement silos, 2 no. round metal cylinders, 5m high retaining wall, storage bays. Installation of 12 no. high lamp posts, diesel tank with metal hoarding surround. Erection of portacabin to be used as temporary site office, temporary storage tent. Construction of settling pit & wash pit.
1.2The application was deferred at the meeting on 15th February 2024 to allow officer consideration of the Network Rail comments received on the day of the meeting. The application returns for determination following the receipt of additional supporting information and having undergone a full re-consultation in that regard. An update to the original report is provided at section 12.
2.0RECOMMENDATION TO PLANNING COMMITTEE
2.1That the planning application is granted for a temporary period of five years subject to conditions set out at section 13 of this report.
3.0THE SITE 3.1 The application site is located to the west of Appley Lane north and sits directly alongside the Manchester-Wigan railway line. Access is via an existing vehicular access from Appley Lane North.
3.2Other than a right of way to the highway (which is indicated on the plans) the site is self-contained and is not connected either in ownership or operation to the adjoining land to the north.
4.0PROPOSAL
4.1The application is retrospective in form and seeks planning permission to retain the following structures: • Construction of 3no cement silos, 2no. round metal cylinders, 5m high retaining wall, storage bays. • Installation of 12no high lamp posts, diesel tank with metal hoarding surround, portacabin to be used as temporary site office and temporary storage tent, together with the construction of settling pit & wash pit.
5.0PREVIOUS RELEVANT DECISIONS
5.12005/1028 - County Matter - Retention of rail terminal (including a rail siding) and concrete pad together with related infra structure including road from Appley Lane North - Withdrawn
5.22013/0140/CMA - County Matter - The installation and operation of a 5mw bio- liquid to power generation facility - Granted (17/04/2013)
5.308/13/0140NM1 - Non material amendment to allow the use of tallow along with cooking oil as a bio liquid for the use of energy generation on site and amend condition 10 to include tallow, the delivery of cooking oil and tallow - Granted (12/12/2013)
5.4L/2015/0088 - Low temperature pyrolysis plant to convert low worth waste plastic into diesel and gasoline. The facility includes a fuel reception hall, conveyors, chemical treatment, fractionation columns, fuel storage tanks, a generator set and offices. The facility uses the non-condensable gases and some of the product gasoline as fuel to meet the plants heat and power requirements - Withdrawn
5.5LCC/2018/0055 - County Matter - Construction Of A 5mw Gas Fired Power Plant - Granted (23/01/2019)
6.0OBSERVATION OF CONSULTEES
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.