A. That £325,000 of CIL funding to deliver upgrades at Burscough Wellbeing & Leisure Hub as detailed in this report is approved. B. That the Director of Planning, Economy and Wellbeing be given delegated authority to undertake all steps necessary to deliver the approved works.
Word for word from the decision West Lancashire published for this meeting.Source: democracy.westlancs.gov.uk
status FEASIBILITY This drawing is copyright Bradshaw Gass & Hope LLP and is not to be copied, DRINKING DRINKING reproduced or re-distributed either in whole or in part without the prior written permission of the originator.
FOUNTAIN FOUNTAIN The originator shall have no responsibility for any liability, loss, cost, damage or DG27 expense arising from or relating to any use of this document other than for its intended purpose on this project.
This drawing shall be read in conjunction with all other relevant drawings, specifications and associated documentation. Any discrepancies, errors or omissions are to be reported to the originator before proceeding with work. DG26 GLAZED SCREEN 01 All dimensions are to be checked on site by the contractor prior to proceeding
CIRCULATION F02 F04 with any work.
DG25 G03 CIRCULATION DF01 CIRCULATION Hazard Identification G02 ref hazard date RECEPTION / 7.1m² 7.3m² 43.5m² 42.8m² 26.4m² DG29 DG01 SERVERY 15.2m² G11 DF02 ACC. WC 9580 (MIN.) 5.7m² DG02 HD EXISTING DOORS, FRAME & ARCHITRAVES TO BE REPLACED / EXISTING DADO TRUNKING (ALL ADAPTED FOR ANY POTENTIAL INCREASE IN THICKNESS TO WALLS) TO BE SAFELY DISCONNECTED WALL LININGS - SUBJECT ACOUSTIC CONSULTANT & REMOVED - NEW DOUBLE SOCKET EXISTING PLASTERBOARD WALL LINING & SUBFRAME RECOMMENDATION. (IRONMONGERY MAY REQUIRE REPLACING OUTLETS TO BE INSTALLED - QTY TBC (ALL WALLS) TO BE TAKEN DOWN & REMOVED. TO BE - SUBJECT TO CLIENT & BUILDING CONTROL EQUIREMENTS BY CLIENT REPLACED WITH FULL HEIGHT ACOUSTIC WALL LININIG (BUILD UP RECOMMENDATION & GUIDANCE
EXISTING PLASTERBOARD WALL LINING & SUBFRAME EXISTING SKIRTINGS TO WELLBEING SUITE TO BE G01 TO BE PROVIDED BY ACOUSTIC CONSULTANT) - MIN NR40 ACOUSTIC RATING DG12 (ALL WALLS) TO BE TAKEN DOWN & REMOVED. TO BE CAREFULLY REMOVED & REINSTATED POST REPLACED WITH FULL HEIGHT ACOUSTIC WALL WORKS - SUBJECT TO CONDITION. NEW SKIRTINGS MAIN ENTRANCE
GLAZED SCREEN 02 LININIG (BUILD UP RECOMMENDATION & GUIDANCE TO EXTENDED MULTI-PURPOSE STUDIO I]TO BE TO BE PROVIDED BY ACOUSTIC CONSULTANT) - MIN NR40 ACOUSTIC RATING INSTALLED TO MATCH REINSTATED SKIRTING - ALTERNATIVELY - NEW 125mm HIGH SKIRTING TO LOBBY G05 BE PROVIDED THROUGHOUT 47.4m² MULTI-PURPOSE EXERCISE STUDIO VOID OVER EXISTING CEILING & LIGHTING TO BE CAREFULLY TAKEN DOWN & 123.6m² TILES/LIGHT FITTINGS STORED SAFELY DURING WORKS - NEW PROPOSED MULTI-PURPOSE STUDIO GRID SYSTEM TO BE INSTALLED TO TO EXTEND THROUGH TO ENTIRE PROPOSED MULTI-PURPOSE STUDIO - CEILING HEIGHT - SPORT ENGLAND GUIDANCE MIN. 4.5M HEIGHT - MECHANICAL F03 EQUIPMENT (EXISTING & PROPOSED) & CLIENT REQUIREMENTS 26.6m² 2100mm HIGH MIRRORS
12900 (MIN.) FULL EXTENT OF WALL
LINE OF STEELWORK / LADDER TRUSS - TYPE TBC BY S.ENG TO DETERMINE HEIGHT NEW HEIGHT - EXISTING HEIGHT 3.4M - LINE OF STEELWORK / LADDER TRUSS - TYPE TBC BY S.ENG HEIGHT TBC BY CLIENT
10 ED WG01 EXISTING FULL HEIGHT BLOCK WALL TO BE FULLY TAKEN DOWN & DASHED LINE DENOTES 2.1M HIGH MIRRORS BONDED WALLS MADE GOOD. EXISTING M&E SERVICES & STEELWORK TO G09B TO PLY BACKERBOARD & FIXED OFF MF CARRIER SYSTEM - MIRRORS TO BE INSTALLED FULL LENGTH BE TEMPORARILY SUPPORTED DURING THE WORKS AND NEW STEELWORK (LADDER TRUSS - TBC BY S.ENG) INSTALLED MALE OF WALL & MIRRORS TO COMPLY WITH BS 6262. BETWEEN WALLS TO SUPPORT EXISTING M&E SERVICES & ACOUSTIC RATED STUD PARTITION TO CLOSE OFF
CIRCULATION / VIEWING GALLERY MIRRORS TO BE INSTALLED ABOVE SKIRTINGS SUPPORTING STEELWORK. NEW TRUSS TO ALSO SUPPORT ANY EXISTING SPECTATOR VIEWING AREA - TO ACHIEVE
SHOWER G04 (BALANCE BAR TO BE PROVIDED - TBC BY CLIENT)
INSTALL NEW ADDITIONAL M&E SYSTEM (WITH NEW REQUIRED NEW M&E SERVICES FOR INCREASED AREA - AS REQUIRED. EXISTING FLOOR WHERE WALL HAS BEEN REMOVED RATING AT STATED ELSEWHERE
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Confirmation of Procedural MattersA. That the Working Groups for 2026/27 be noted. B. That Cllr Howard be appointed Vice-Chair of the Member Developmen...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.