(1) The progress of the work to date to develop the Homes for Future programme for the West Midlands, with wide-ranging input from the Future Homes Taskforce and local authority partners across the region and other relevant stakeholders be noted. (2) Comments on the final draft of the Homes for Future Strategy be noted. (3) The amendments to the report on costs prepared by Cast Consultancy be noted.
Word for word from the decision West Midlands Combined Authority published for this meeting.Source: governance.wmca.org.uk
Follow this further
Built from West Midlands Combined Authority's papers
Homes for the Future – Technical Standard West Midlands Homes for the Future - Technical Standard - Concept
2030 target scenario - Achieve net zero carbon in construction and in operation Embodied Passive Active Renewables & Net Construction Evidence Carbon Design Design Zero Targets Strategy Required
Energy: • EUI: <35kWh/m2 operational energy use (including regulated and unregulated energy). • Space heating demand of <15KWh/m2/yr Embodied Carbon: • Embodied carbon calculation to verify target equivalent to <300kgCO2/m2 Granular description Construction: • All developments achieve PMV of 55% of how the standards 2025 target scenario - Achieve net zero carbon in operation can be achieved Energy: • EUI: <35kWh/m2 operational energy use (including regulated and unregulated energy). • Space heating demand:15-20 KWh/m2/yr Embodied Carbon • Embodied carbon calculation to verify target equivalent to <400kgCO2/m2 Construction: • All developments achieve PMV of 50% Clearly defined 2023 Minimum Standard trajectory increasing Energy: • EUI: <70kWh/m2 operational energy use (including regulated and unregulated energy). over time • Space heating demand: 15-20KWh/m2/yr Embodied Carbon • Embodied carbon calculation to verify target equivalent to <500kgCO2/m2 Construction: • Preference for 50% PMV • Evidence that DfMA process guidance has been adhered to Definition of the Statutory (plus enhanced measurement & monitoring) evidence required for Energy • 31% reduction on Dwelling Emission Rate against the Target Emission Rate of Building Regulations Part L 2013. funding purposes Embodied Carbon • As a minimum all delivery partners must measure embodied carbon impacts of the proposed construction. Construction • Review opportunity for PMV uplift across all MMC categories West Midlands Homes for the Future: Technical Standard – 2030 target Commentary & Context This standard sets the expectation of achieving net zero carbon in construction and operation in 2025. Again pilot projects may achieve this standard sooner, although it will require significant learning and sharing of intelligence about the design and construction solutions that enable this standard to be achieved. It will also require the construction sector and materials supply chain to respond to client demand to achieve this level of performance. 2030 target scenario - Embodied Carbon Passive Design Active Design Achieve net zero carbon in construction and in operation (in accordance with UKGBC definition).
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Housing & Land Delivery Board at West Midlands Combined Authority and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.