Resolved
(1) The additional funding requirement of £2.1m to take the scheme through to the end of the existing contract in October 2025, requiring WMCA Board approval, was endorsed. (2) The conclusion of options appraisal of the existing scheme and interim measures taken to improve performance of the scheme and mitigate the challenges reported in Autumn 2023 was endorsed. (3) The original objectives of the scheme and the level to which these are being met through the existing scheme, as per WMCA Board report 24 July 2020 were noted. (4) The link between the existing WMCH scheme and the developing Local Travel Points that would include further cycle hire scheme along with improved safety and security measures was noted.