Resolved
(1) The additional funding requirement of £2.1m to take the scheme through to the end of the existing contract in October 2025 was approved. (2) The conclusion of options appraisal of the existing scheme and interim measures taken to improve performance of the scheme and mitigate the challenges reported in Autumn 2023 were endorsed. (3) The original objectives of the scheme and the level to which these were being met through the existing scheme, as set out WMCA Board report 24 July 2020, were noted. (4) The link between the existing West Midlands Cycle Hire scheme and the developing Local Travel Points that would include further cycle hire schemes along with improved safety and security measures was noted.