Planning Application DC/18/2013/FUL - Water Pumping Station Corner of A143, Haverhill Road, Little Wratting (Report No: DEV/SE/19/014)
ApprovedPlanning3 papers
St Edmundsbury Development Control Committee approved this item on Thursday 7 February 2019. Below is the council's own wording, with the papers it was decided on.
Decision Planning permission be GRANTED subject to the following conditions: 1 The development hereby permitted shall be begun not later than 3 years from the date of this permission. 2 The development hereby permitted shall not be carried out except in complete accordance with the details shown on the approved plans and documents. 3 The new vehicular access shall be laid out and completed in all respects in accordance with Drawing No. WAT-06742-KEHRWW-SS-PLG-0007 and made available for use prior to the water ... view the full minutes text for item 90.
Word for word from the decision West Suffolk published for this meeting.Source: democracy.westsuffolk.gov.uk
Report to St Edmundsbury Development Control Committee
DEV/SE/19/014
Development Control Committee 7 February 2019 Planning Application DC/18/2013/FUL – Water Pumping Station Corner of A143, Haverhill Road, Little Wratting
Date 09.10.2018 Expiry Date: 08.02.2019 Registered:
Case Julie Barrow Recommendation: Approve Application Officer:
Parish: Little Wratting Ward: Withersfield
Proposal: Planning Application - New water treatment works
Site: Water Pumping Station Corner of A143, Haverhill Road, , Little Wratting
Applicant: [name removed] - Anglian Water Services Ltd
Synopsis: Application under the Town and Country Planning Act 1990 and the (Listed Building and Conservation Areas) Act 1990 and Associated matters.
Recommendation: It is recommended that the Committee determine the attached application and associated matters.
Prior to the submission of the application the applicant requested a Screening Opinion from the Local Planning Authority. The LPA determined that the proposal does not constitute environmental impact assessment development for the purposes of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017.
The application is referred to Development Control Committee as it relates to a major planning application and Kedington Parish Council objects to the proposal. The site is located in the Parish of Little Wratting, however given its proximity to Kedington, Kedington Parish Council were consulted and objected to the application.
A site visit will take place on 31 January 2019.
Proposal:
1. The application seeks consent for the construction of a water treatment works on land to the south-west of the B1061 / A143 junction. The works will occupy a footprint of approximately 7200m2 and will comprise the following components: Settlement tanks Surge vessel Balance tanks Filter plat Switchroom kiosk Hypochloride dosing kiosk Orthophosphoric dosing kiosk Sampling kiosk Switch room kiosk Pump building Sampling kiosk Stand-by generator and fuel tank building Welfare building DN0 metering kiosk Hundon pumping station
2. The various components of the water treatment works will vary in size and height with the filtration plant being the tallest structure with a maximum height of 7.8m. The adjacent settlement tanks will have a maximum height of 5.9m. The equipment is located towards the centre of the site, where the ground level will be reduced to approximately 3-4m below the level of the ground to the west of the site.
3. With the exception of the access off the B1061 Haverhill Road, the treatment works will be surround by an earth bund approximately 2.5m high. The site will be enclosed by 3.9m high steel security fencing (painted green) with space provided for landscaping.
4. A pump station kiosk and a metering kiosk will be installed adjacent to an existing borehole immediately to the north of the site of the proposed treatment works. Land to the west of the borehole will be used during the construction process as a temporary compound and soil storage area. 5. The proposed water treatment works will treat water from the existing abstraction borehole located adjacent to the works. The new process will pump water from the borehole through filtration and disinfection processes.
6. A new pipeline is also proposed to support the water treatment works. This does not form part of this application as Anglian Water has established that the installation of the pipeline can be carried out as permitted development and an express planning permission is not therefore required.
Application Supporting Material:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow St Edmundsbury Development Control Committee at West Suffolk and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.