Decision Listed Building Consent be GRANTED subject to the following conditions: 1 The works to which this consent relates must be begun not later than 3 years from the date of this notice. 2 The development hereby permitted shall not be carried out except in complete accordance with the details shown on the approved plans and documents. 3 No development above ground level shall take place until details in ... view the full minutes text for item 59.
Word for word from the decision West Suffolk published for this meeting.Source: democracy.westsuffolk.gov.uk
Late Paper Item 10 – Planning Application DC/19/0079/FUL and Application for Listed Building Consent DC/19/0080/LB – The Rutland Arms Hotel, 33 High Street, Newmarket
Planning Application DC/19/0079/FUL
1. Fully worded conditions have now been prepared and are set out below.
CONDITIONS
1. The development hereby permitted shall be begun not later than 3 years from the date of this permission.
Reason: In accordance with Section 91 of the Town and Country Planning Act 1990.
2. The development hereby permitted shall not be carried out except in complete accordance with the details shown on the following approved plans and documents:
The development hereby permitted shall be begun not later than 3 years from the date of this permission.
Reason: In accordance with Section 91 of the Town and Country Planning Act 1990.
2 The development hereby permitted shall not be carried out except in complete accordance with the details shown on the following approved plans and documents:
Reason: To define the scope and extent of this permission.
Reference No: Plan Type Date Received 180101-3DR-00- Site Plan 15.01.2019 DR-D-010 P01 180101-3DR-00- Demolition plan 15.01.2019 DR-D-021 REV P01 180101-3DR-00- Prosed Basement floor plan 15.01.2019 DR-D-030 P03 180101-3DR-00- Location Plan 17.01.2019 DR-D001 P02 180101-3DR-01- Proposed First Floor Plan 15.01.2019 DR-D-032 REV P03 180101-3DR-01- Demolition plan 15.01.2019 DR-D022 REV P05 180101-3DR-02- Proposed Second Floor Plan 30.08.2019 DR-D-023 REV P04 180101-3DR-03- Proposed third floor plan 15.01.2019 DR-D-024 P01 180101-3DR-RF- Demolition plan 15.01.2019 DR-D-025 REV P01 180101-3DR-SE- Proposed Ground Floor Plan 23.10.2019 DR-D-031 P09 180101-3DR-SE- Proposed Second Floor Plan 30.08.2019 DR-D-033 REV P07 180101-3DR-SE- Proposed third floor plan 15.01.2019 DR-D-034 REV P03 180101-3DR-SE- Proposed Roof Plan 15.01.2019 DR-D-035 REV P03 180101-3DR-SE- Demolition plan 30.08.2019 DR-D-100 P05 180101-3DR-SE- Proposed Elevations 30.08.2019 DR-D-101 REV P05 180101-3DR-SE- Proposed Elevations 30.08.2019 DR-D-110 REV P06 180101-3DR-SE- Proposed Elevations 15.01.2019 DR-D-111 REV P01 180101-3DR-SE- Proposed Elevations 15.01.2019 DR-D-200 REV P02 180101-3DR-SE- Proposed Elevations 15.01.2019 DR-D-201 REV P02 180101-3DR-SE- Sections 15.01.2019 DR-D-203 REV P02 180101-3DR-SE- Garage Plans & Elevations 30.08.2019 DR-D-210 REV P04 21707 EA-04 Existing First Floor Plan 15.01.2019 21707 EA-09 Existing Elevations 15.01.2019 21707EA-02 Existing Floor Plans 15.01.2019 21707EA-03 Existing Ground Floor Plan 15.01.2019 21707EA-05 Existing Second Floor Plan 15.01.2019 21707EA-06 Existing Third Floor Plan 15.01.2019 21707EA-07 Existing Floor Plans 15.01.2019 21707EA-08 Existing Roof Plan 15.01.2019 21707UG-01 CCTV Location plan 15.01.2019 190830 architects Report 30.08.2019 report
3 Prior to first operational use of the annexe building, at least 25% of on site car parking spaces shall be equipped with working electric vehicle charge points, which shall be provided for staff and/or visitor use at locations reasonably accessible from car parking spaces. The Electric Vehicle Charge Points shall be retained thereafter and maintained in an operational condition. Reason: To promote and facilitate the uptake of electric vehicles on the site in order to minimise emissions and ensure no deterioration to the local air quality, in accordance with Policy DM14 of the Joint Development Management Policies Document, paragraphs 105 and 110 of the National Planning Policy Framework (NPPF) and the Suffolk Parking Standards.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.