Resolved
Resolved (10:2) That the application be approved subject to the following conditions: 1. The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. 2. No development shall take place until samples of the materials to be used in the external construction of this development have been submitted to and approved in writing by the Local Planning Authority. The approved materials shall then be used in the construction of the development. 3. The development hereby permitted shall be carried out in accordance with the original submission as amended by the approved plans received by the local planning authority on the 27 September 2016 and listed as follows: Project No. P14-079 Drawing No. 02-02-001; Project No. P14-079 Drawing No. 02-03-001_I; Project No. P14-079 Drawing No. 02-03-002_G; Project No. P14-079 Drawing No. 02-03-003_G; Project No. P14-079 Drawing No. 02-03-004_A; Project No. P14-079 Drawing No. 02-05-001_G; Project No. P14-079 Drawing No. 02-05-002_G; Project No. P14-079 Drawing No. 02-05-003_H and Project No. P14-079 Drawing No. 02-05-004_G 4. No development shall take place until a site waste management plan, confirming how demolition and construction waste will be recovered and re-used on the site or at other sites, has been submitted to and approved in writing by the Local Planning Authority. The approved plans shall be implemented in full unless otherwise agreed in writing with the Local Planning Authority. 5. Prior to the first occupation of the dwellings arrangements for the storage and disposal of refuse, and vehicle access thereto, shall be made within the curtilage of the site, in accordance with details to be submitted to and agreed in writing by the Local Planning Authority. The approved details shall be implemented in full unless otherwise agreed in writing with the Local Planning Authority. 6. The development permitted by this planning permission shall only be carried out in accordance with the approved Flood Risk Assessment (FRA) undertaken by RBA Ltd and dated September 2016 (Ref:4018) and the Proposed Mitigation Measures detailed in Paragraph 5.0 (Page 3) of the FRA including: 1. Construction of finished floor levels of the proposed development at a minimum level of 7.80m AOD; 2. Incorporation of the development onto the Environment Agency's Flood Warnings Direct Service; 3. Service entries (gas, electricity, etc.) should be located 600mm above finished ground floor level; and 4. Flood resistant and resilient building materials and construction techniques shall be incorporated into the construction of the ground floor of the development. T he mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the timing / phasing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the local planning authority. 7. ... view the full minutes text for item 120.