CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Wirral Borough Council

Road Condition Update

Noted Scrutiny 1 paper

Business Overview and Scrutiny Committee noted this item on Tuesday 4 July 2017. Below is the council's own wording, with the papers it was decided on.

Item5

Resolved

Resolved – That the report be noted.
Word for word from the decision Wirral published for this meeting. Source: democracy.wirral.gov.uk

Follow this further

Built from Wirral's papers

What the report saysPro

Report to Business Overview and Scrutiny Committee

Business Overview and Scrutiny Committee 4 July 2017

REPORT TITLE: ROAD CONDITION UPDATE

REPORT OF: STRATEGIC COMMISSIONER FOR ENVIRONMENT

REPORT SUMMARY

This report provides an explanation into the current condition of Wirral’s roads, how the information is captured, and how it is reported to the Department for Transport (DfT).

The maintenance of highways is a statutory duty for the Council under the Highways Act 1980 (as amended).

Maintenance and improvement of highways contributes to the Wirral Plan pledge to provide transport and technology infrastructure fit for the future, and is key to delivery of the Connecting Wirral Transport Strategy.

This matter affects all Wards within the Borough.

RECOMMENDATION/S

That Members note the contents of this report. SUPPORTING INFORMATION

1.0REASON/S FOR RECOMMENDATION/S

To ensure members of the Business Overview & Scrutiny Committee have an understanding of the condition of Wirral’s roads and how the information is captured, used and reported to the Department for Transport (DfT).

2.0OTHER OPTIONS CONSIDERED

Other options are not relevant to this report.

3.0BACKGROUND INFORMATION

The total length of Wirral’s road network is approximately 1138km and can be broken down as follows: ‘A’ Classified Roads Principal 130km ‘B’ Classified Roads Non-Principal 62km ‘C’ Classified Roads Non-Principal 54km ‘U’ Unclassified Roads 892km.

In accordance with national best practice the Council undertakes surveys of the highway network in order to determine the condition of the carriageways. Information gathered during these surveys is used to develop the Structural Maintenance Programme and helps to prioritise highway schemes. Wirral’s road network is surveyed annually by external suppliers procured through a contract framework with all of the Liverpool City Region Authorities as well as Cheshire West and Chester Council. The current survey supplier for classified roads is WDM Ltd and for unclassified roads is Yotta Ltd.

Classified road network For the assessment of the classified road network WDM Ltd undertake a scanner survey from a vehicle. Road Assessment Vehicles (RAVs) carry out high speed data acquisition and recording of road surface conditions, including automatic recognition of surface cracking. This provides performance indicator data to enable maintenance work to be prioritised and National Indicators (NIs) to be calculated. These vehicles have been the primary provider of SCANNER survey data throughout the United Kingdom and are designed to survey at speeds up to 100 km/hr. whilst measuring and recording road geometry, texture profile and cracking.

Unclassified Road Network Coarse Visual Inspection (CVI) is intended to be a rapid survey. CVI is the standard survey used to produce the Best Value Performance Indicators (BVPI) on the condition of local authorities’ roads as required by DfT, and which allows comparisons to be made between authorities on the basis of the overall condition of their carriageways. A CVI survey is normally undertaken from a slow moving vehicle, using the “simple” cross-section position method, where the carriageway is assessed as a whole. Both types of surveys are undertaken after completion of the structural maintenance works programme for that year, to allow for the survey results to reflect the investment the Council has committed to the carriageway network. From the surveys undertaken, the existing condition of the highway network is reported through a small number of NIs.

4.0ROAD CONDITION RESULTS

4.1The performance of Wirral’s road network is shown on Table 1, which details the last six years. All the recorded measurements indicate the percentage of the network that requires immediate maintenance for each classification of road. The condition of the Principal and Non-Principal Classified roads are Wirral Plan indicators in the Connecting Wirral Transport Strategy.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Road Condition UpdateReport 116 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

17 of 18 attended
MS
Councillor Michael SullivanChair, present
PH
Councillor Pat HackettVice-Chair, present
RA
Councillor Ron AbbeyCommittee Member, present
EB
Councillor Eddie BoultCommittee Member, apologies, sent representative
GE
Councillor Gerry EllisCommittee Member, present
JH
Councillor John HaleCommittee Member, apologies, sent representative
AL
Councillor Anita LeechCommittee Member, present
JM
Councillor Julie McManusCommittee Member, apologies, sent representative
DM
Councillor Dave MitchellSpokesperson, present
TP
Councillor Tracey PilgrimCommittee Member, present
JS
Councillor Jean StapletonCommittee Member, present
WW
Councillor Warren WardCommittee Member, absent

All 18 on the meeting page

On this subject at Wirral

Search all
  1. Road Condition UpdateThis decision
  2. RVC/23/01961; The Quadrant Albert Road / Station Road, CH47 2EE Vary Condition 12 (17/01191, 19/00065 & 22/01426) in accordance with the details submitted as set out in phasing plan reference 19084-SK-12 dated 30 July 2021 (Phasing Plan MarApproved
  3. RVC/22/01426; The Beacon Project Albert Road, Hoylake, Wirral, CH47 2AB, Variation of Condition 8 and 12 of previously approved APP/19/00065Approved
  4. App/20/00998: irvine house, 54-56 park road south, birkenhead - variation of condition 2 (approved plans) of planning permission app/16/00732 (conversion of social club to 11 apartments and the erection of 7 dwellings and 21 apartments) toApproved
  5. APP/19/00731: 10 BRANCOTE ROAD, OXTON, WIRRAL, CH43 6TJ, Variation of condition 2 of APP/18/00616 to provide six additional parking spaces.Approved
  6. APP/19/00535: HOYLAKE PRESBYTERIAN CHURCH, ALDERLEY ROAD, HOYLAKE, CH47 2AX - Variation of condition 2 of APP/1/00183Approved

More from Wirral Business Overview and Scrutiny Committee

All decisions
MeetingDecisionOutcome
4 Mar 2020 Update on Liverpool City Region DevelopmentsResolved – That the report be noted. Noted Open
4 Mar 2020 NNDR and Business Rates RetentionResolved – That the report be noted. Noted Open
4 Mar 2020 Financial Monitoring Report Quarter 3 2019/20Resolved – That the report be noted. Noted Open
4 Mar 2020 Management of Campervans in Wallasey and New Brighton Scrutiny ReviewResolved – (1) That the findings of the Scrutiny Review Panel be approved. (2) That the report be referred to the mos... Approved Open
4 Mar 2020 2019/20 Quarter 3 Wirral Plan PerformanceResolved – That the report be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies