Resolved
Resolved (12:0) – that the application be approved subject to the following conditions. APP/19/00564 - TO CONSTRUCT 178 DWELLINGS WITH ASSOCIATED PARKING, ACCESS AND LANDSCAPING - CLEARED SITE, BEAUFORT ROAD, BIRKENHEAD - APPROVED 1. The development hereby permitted shall be begun before the expiration of 3 years from the date of this permission. 2. The development hereby permitted shall be carried out in accordance with the approved plans received by the local planning authority on 11th April 2019 and listed as follows: KHNW-MB-01; KMT/PL-106-2; KMT/PL-106-3; SK04-1; 1030-1; 1040-1; 1070-1; 1080-1; 1090-1; 1130-1; 1140-A; 1170-1; 1200-1; 1210-1 3. The external finishes of the development shall correspond with the submitted Materials Plan (Drawing KHNW-MB-01 Revision F) unless otherwise agreed in writing by the Local Planning Authority 4. No residential development besides remediation and land clearance shall commence until the final detailed sustainable drainage design, for the management and disposal of surface water from the site which shall be limited to a discharge rate of 21 l/s and based on the principles and details identified in the following document has been submitted to and approved in writing by the Local Planning Authority, in consultation with the Lead Local Flood Authority: · Flood Risk Assessment Report for Beaufort Road at Birkenhead (01/04/2019/ File Ref: 6738FRA_RevA/ Coopers) 5. The development hereby permitted by this planning permission, including all components of the sustainable drainage system, shall be carried out in accordance with the approved final Sustainable Drainage Strategy, including any phasing embodied within, and maintained in perpetuity in accordance with an agreed Operation and Maintenance Plan, to be submitted for each development phase, approved by the Local Planning Authority, in consultation with the Lead Local Flood Authority. The surface water drainage system shall be offered for adoption to United Utilities at adoptable standards where adoption has been submitted in the drainage strategy. The approved drainage scheme shall be fully constructed prior to occupation in accordance with the approved details, phasing and timetable embodied within the approved final Sustainable Drainage Strategy, or within any other period as may subsequently be agreed, in writing, by the Local Planning Authority in consultation with the Lead Local Flood Authority. ‘As built’ drainage design/layout drawings and a final Operation and Maintenance Plan, confirming asset details and maintenance arrangements, shall be submitted to the Lead Local Flood Authority, in accordance with any approved phasing, prior to occupation. 6. No development other than demolition and remediation shall take place until a Site Waste Management Plan (or similar waste audit), confirming measures to achieve efficient use of resources and including designing out waste and minimisation of off-site disposal, has been submitted to and approved in writing by the Local Planning Authority. The approved Plan ... view the full minutes text for item 49.