Resolved
Resolved (unanimously) – that the application be approved subject to the following conditions: 1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 2. Except where modified by the conditions attached to this planning permission, the development hereby approved relates to and shall be carried out in accordance with the following approved plans: P21-2391_01-A Detailed Soft Landscaping Proposals P21-2391_02-A Detailed Soft Landscaping Proposals Proposed Boundary Treatments Site Plan P403 Rev. D Proposed Elevations Dwg no. P200 rev. D Gatehouse Information Dwg no. P110 rev. B Proposed Roof Plan Dwg no. P101 rev. B Proposed Floor Plan Dwg no. P100 rev. C Proposed Site Plan Dwg no. P402 rev. E Proposed Surface Treatments Site Plan Dwg no. P404 rev. C Proposed External Lighting Layout Dwg No. 2390/E01 rev. P1 Site Location Plan Dwg no. P401 rev. B 3. Notwithstanding any description of materials in the application, no above ground construction works shall take place until samples and / or full specification of materials to be used externally on the building(s) have been submitted to and approved in writing by the Local Planning Authority. Such details shall include the material type, colour and texture. The development shall be carried out only in accordance with the agreed schedule of materials and method of construction. 4. Prior to commencement of development, a Construction Environmental Management Plan (CEMP) document shall be submitted to and approved in writing by the Local Planning Authority in consultation with Natural England. The CEMP should address and propose measures to minimise the main construction effects of the development and, amongst other things, should include details of ecological mitigation, pollution prevention and soil resource management. The CEMP would normally be expected to include the agreed method statements to mitigate or avoid adverse environmental impacts. The CEMP should include, but not be limited to, the following: · pollution prevention measures as set out in paragraph 6.3.3 of the shadow HRA report (Information for a Habitats Regulations Assessment, RPS, ECO02904 March 2023, Rev E, Final); · details of construction lighting, designed to avoid light spillage into the adjacent Liverpool Bay SPA; · details of measures to reduce significant noise effects to waterbirds during construction. These details should include the location and specification of acoustic fencing to be installed upon site boundary; and · details of the Ecological Clerk of Works ( ECoW ) that will be employed onsite throughout construction period to assist with avoidance of visual disturbance effects to waterbirds within the adjacent Liverpool Bay SPA, as set out in paragraph 6.4.9 of the shadow HRA (Information for a Habitats Regulations Assessment, RPS, ECO02904 March 2023, Rev E, Final). 5. A scheme of noise control for any plants and equipment to be installed ... view the full minutes text for item 7.