Resolved
Resolved (unanimously) – That the application be approved subject to the following conditions: 1. The development hereby permitted shall begin no later than 3 years from the date of this decision. 2. The development hereby permitted shall be carried out in accordance with the approved plans listed as follows: LOC/01 rev. B (Location Plan) PLAN/01 rev. E (Proposed Site Plan) PLAN/02 rev. C (Proposed Ground & First Floor Plans) PLAN/03 rev. C (Proposed Second Floor & Roof Plans) PLAN/04 rev. D (Proposed West & South Elevations) PLAN/05 rev. D (Proposed East & South Elevations) PLAN/06 (Bin & Cycle Store Details) PLAN/07 rev. A (Existing & Proposed Caldy Road Streetscene Sections) PLAN/08 rev. A (Existing & Proposed Sections Through 11 Clady Road) PLAN/09 rev. A (Existing Dwelling Plans Elevations) Dusk Survey Results, Issue No. 1, Tyrer Ecological Consultants, 08.06.23 Updated Preliminary Ecological Appraisal, Tyrer Ecological Consultants 08.06.23 Preliminary Ecological Appraisal, Tyrer Ecological Consultants 13.02.21 Dusk Survey Results, Tyrer Ecological Consultants, 12.08.21 Arboricultural Impact Assessment & Method Statement, Tree Solutions. Arboricultural Consultants, ref. 20/AIA/WIRR/81, June 21 Topographical Survey, dwg . no. 8788/01 3. No development above ground shall take place until the adjacent dwelling at no.9 Caldy Road as shown on the hereby approved Location Plan (ref. LOC/01 rev. B) and Proposed Site Plan (PLAN/01 rev. E) and edged in blue has been demolished. 4. The facing materials to be used in the external construction of this development hereby approved and set out in the PLAN/4 Rev. D (Proposed West & North Elevations) & PLAN/5 Rev. D (Proposed East & South Elevations) shall be used in the construction of the development unless agreed otherwise in writing with the Local Planning authority. 5 Prior to occupation of the development hereby approved, all windows in both side elevations of the building hereby approved shall be fixed and obscurely glazed on installation and remain as such thereafter. 6. Prior to the commencement of any works to the superstructure (other than demolition), a detailed scheme for landscaping will be submitted to and approved in writing by the Local Planning Authority The scheme shall comprise of a plan and specification and demonstrate: a. The materials to be used for hard and soft surfacing; b. Tree and hedge planting across the site (including a minimum of 10no. trees) c. Detailed planting plan and specification for soft landscaping of land d. The location and design of fences, gates, walls, railings or other means of enclosure e. The timing of implementation of the scheme; and f. The development shall be carried out strictly in accordance with the approved details. The development shall not be first occupied until the landscaping scheme has been implemented in full and the scheme shall be retained for the life of ... view the full minutes text for item 50.