Resolved
Resolved (10:1) – T hat the application be approved subject to the following conditions: The development hereby permitted shall begin not later than [3] years from the date of this decision. The development hereby permitted shall be carried out in accordance with the approved plans received by the local planning authority on 05/04/2022 & 16/08/2023 and listed as follows: - 2768.P1 - 2768.P1 Rev A - 20 018 05 Rev A - 20 018 06 Rev A - FRA Rev 4 Base Energy - Full Structure Report CASE No development involving the use of any facing materials and driveway materials shall take place until samples or details of the materials to be used in the construction of external surfaces of the building and hard standing have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. The driveway shall be laid and completed using the agreed materials prior to the first occupation of the dwelling hereby approved. The development shall be carried out in accordance with the submitted flood risk assessment (ref: March 2022/Flood Risk Assessment Rev4/Base Energy Service Limited) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 0.3 metres above existing floor levels. - Flood resilient and resistant construction technology to be incorporated into the design and fabric of the building. - Residents/occupant to register to receive flood warning information from the Environment Agency. - A flood management plan to be prepared and adopted by the resident/ occupant. - Incorporation of simple SuDS techniques within the surface water drainage design of the Page 35 development. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme’s timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. No tree felling, scrub clearance, hedgerow removal, vegetation management, ground clearance and/or building works is to take place during the period 1 March to 31 August inclusive. If it is necessary to undertake works during the bird breeding season then all buildings, trees, scrub, hedgerows and vegetation are to be checked first by an appropriately experienced ecologist to ensure no breeding birds are present. If present, details of how they will be protected are required to be submitted for approval. No works are to be carried out within a minimum of 5 metres of the top of the bank to the north of the site due to potential proximity to water vole, details of methods of ... view the full minutes text for item 61.