Item10
Resolved
That the Strategic Director for Place be given delegated authority to grant planning application 18/00833/FUL subject to: (i) Completion of Section 111 to obligate the developer to enter into a Section 106 agreement on taking possession of the land to secure: · £2,500 per unit towards the expansion and relocation of Loxdale Primary School which is located adjacent to the Application Site; · £2,500 per unit towards the creation, enhancement and maintenance of open space located adjacent to the Application Site; · The creation of a management company to maintain: o the on-site open space that is not privately maintained along with a long-term Landscape Management Plan o the underground drainage system (not adopted by Severn Trent Water) for the life of development and long-term drainage maintenance plan. Provision of 25% Affordable Housing £12,000 towards provision of Traffic Regulation Order Legal costs (iii) Subject to any appropriate conditions including (but not limited to): Commencement Phasing plan Approved plans Materials schedule Final finished floor levels to be agreed, with maximum 2.5m retaining for plots 223, 233 and 234 Submission of detailed landscaping scheme Boundary treatment – across the site and adjacent the canal Drilling and grouting implementation Verification report of Remediation and Enabling Works Strategy Mine workings – treatment Traffic calming, bus lane signage Visibility Splays Implement in accordance with Travel Plan HGV routing plan Hoarding plan SKM04-HP-01 to be implemented Ecological mitigation in accordance with submitted details Updated badger survey should be undertaken within 2 months of the start on site and an amended mitigation strategy provided as necessary Detailed drainage design to include details of SUDS/infiltration trench drainage Tree Protection / removal in accordance with approved plan Noise mitigation (inc acoustic glazing, mechanical ventilation and 2.5 acoustic fencing) Floodlighting / school MUGA – prior to occupation impacts Details of connections to existing PRoW’s Construction methodology, materials and measures to prevent vehicles/motorbikes in pedestrian linkages to canal. Details of the new footpath link to the adjacent site along with access control. Temp PRoW to be implemented Diversion of PRoW Implementation of the Written Scheme of Investigation – Archaeology Implementation of Energy Statement. Electric vehicle charging points Updated Employment and training plan TRO – scheme to be submitted Retaining structure design / structural calculations, including any fill materials to proposed gabion baskets. Management and maintenance plan where adjacent highway, CRT land, public open space, and existing neighbours. Details of existing (retained) retaining structures adjacent canal. Updated Skills and Employment Plan submission Construction Management Plan Removal of Permitted Development rights (to protect residential amenity and impact on canal) Bin collection point location
Word for word from the decision Wolverhampton published for this meeting.
Source: wolverhampton.moderngov.co.uk