Resolved
That the Committee note the contents of the report.
Environment Committee noted this item on Tuesday 27 June 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
That the Committee note the contents of the report.
1.1That the Committee note the contents of the report.
2.1The A44 (New Road) at this location is a key arterial route through Worcester and is the primary connection between east and west Worcester. New Road also serves as a pedestrian and cycle link from the west side of Worcester into the heart of the City. This three lane section of road has a history of flooding events and was subject to closure in 2007 and 2014 due to serious flood events. Therefore serious disruption to the city is caused if the road is closed during these times.
2.2Therefore, Worcestershire County Council has produced an enhanced drainage system which will dramatically reduce closure periods due to flooding and reduce the disruption to the city.
2.3This scheme is a high priority for Worcestershire County Council and its partners as a key improvement in the local transport network.
3. Information
3.1The aim of the proposed scheme is to increase the flood resilience of New Road during periods of high river levels and ensure that the road remains open and usable for a longer duration than is currently possible. The proposed scheme will not completely eradicate flooding along the road but will allow it to remain open at levels seen in 2014.
3.2The proposed scheme will involve improvements to the existing A44 carriageway at New Road in Worcester in order to improve the flood resilience of this key link in the local transport network.
3.3In order to reduce disruption in this area from flood events in the future the proposed scheme includes:
Installation of a culvert inlet structure (a “plughole”) in Cripplegate Park.
Installation of a box culvert 66m in length trenched under New Road from the culvert inlet to the playing fields (Kings School). Raising of the road and the footway by a maximum of 380mm from the outside (plaza) area of the Cricket Club to just past the main entrance into the cricket ground. The raising of the road will be graduated.
Changes to the three splitter islands to allow for two way traffic during times of flood only (at junctions with Hylton Rd, North Parade & All Saints Rd).
Property Level Protection to the garage on Hylton Road and also the Pavilion in the Park.
Twelve trees are to be removed from New Road as they are currently located close to the road and will make working with the services difficult. Replacement trees will be planted in Cripplegate Park.
An area of hedgerow to be removed to allow for new double width gated access point into Cripplegate Park.
3.4This scheme will enable the road to remain open during flood events equivalent to and in excess of those experienced in 2007 and 2014 (1 in 25yr). In flood events beyond a 1 in 50yr return period the road will probably need to be closed. However, the enhanced drainage will dramatically reduce the closure period.
3.5A planning application is due to be submitted to the county council in June 2017. The City Council will be a statutory consultee for the planning application and the County Council will also need to obtain permission to undertake any works within the park, which is City Council owned.
3.6This scheme will have some implications for Cripplegate Park and the Riverside:
3.7The “Plughole” and entrances to the park
Whilst limited in foot print, the scheme provides an opportunity to secure enhancements to Cripplegate Park. Officers have been working with County Council colleagues to agree detailed design of the “plughole” and surrounding surface treatments. It is anticipated that the scheme will also provide an opportunity to improve the entrance to the park at the corner of Hylton Road and New Road. Potential improvements could include the creation of a new public space that directs pedestrians through the park.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
New Road Flood Alleviation/Cripplegate Park ImplicationsReport | 3 pages | DownloadRead as text |
Follow Environment Committee at Worcester and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Mar 2026 | MinutesThat the minutes of the meeting held on 27 th January 2026 be approved as a correct record and signed by the Chair. | Approved | Open |
| 10 Mar 2026 | Proposed Committee Scorecard for 2026/27That the committee agree the proposed content of the Environment Performance Scorecard for 2026/27. | Agreed | Open |
| 10 Mar 2026 | Parking and Environmental Enforcement Service UpdateThat the Committee note the contents of the report. | Noted | Open |
| 27 Jan 2026 | MinutesThat the minutes of the meeting held on 4 th November 2025 be approved as a correct record and signed by the Chair. | Approved | Open |
| 27 Jan 2026 | Medium Term Financial Plan (MTFP) UpdateThat the Committee note the update on the Medium-Term Financial Plan (MTFP) as detailed in Appendix 1. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.