Resolved
RESOLVED That the Committee grant Listed Building consent, subject to the conditions set out in section 9 of the report. COUNCILLOR LEWING IN THE CHAIR
AI summaryWorcester City Council's Planning Committee granted Listed Building Consent for repairs to the Grade II listed bandstand in Gheluvelt Park and replacement of the park's timber bridge, subject to four conditions [D] [P64]. Work must start within three years, with repair details approved in advance [P65] [P70].
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Resolved
RESOLVED That the Committee grant Listed Building consent, subject to the conditions set out in section 9 of the report. COUNCILLOR LEWING IN THE CHAIR
1.1The application was registered on 30 September 2025 and was due for a decision on 25 November 2025. An extension of time for the determination of the application has been agreed until 15 December 2025 to allow determination by the Planning Committee.
1.2The application is presented to Planning Committee as the Applicant is Worcester City Council
2. The site and surrounding area
2.1This application relates to the bandstand and bandstand bridge located within Gheluvelt Park.
2.2Gheluvelt Park is a public park in Worcester located along the A449 (Barbourne Road) and stretches across to the River Severn. It is a Grade II Listed war memorial park, including homes for ex-servicemen, designed and laid out by Alfred Hill Parker and including parts of the layout of an earlier garden landscape on the site. The Barbourne Brook, which leads to the Severn, feeds a duck pond within which is a Bandstand. The park also contains a children's play area, Sons of Rest building, tennis courts and a splash pad. The bandstand is a grade II listed structure in its own right.
Photos of draw bridge and concrete pillars 2.3 The listing description for the bandstand provides the following description;
A cast-iron band stand and wooden bridge of c.1923, standing on an island in the middle of an ornamental pond. The band stand was the gift of the High Sheriff of Worcestershire, Alfred Wiggin, in May 1923, at the time that the park was being laid out as a municipal amenity and war memorial. The bridge across the pond was given by James Ward, at the same time.
PLAN: the octagonal band stand sits on a circular island. It is approached by a wooden bridge from the north shore of the pond.
EXTERIOR: the side of the circular island has stone blocks, and the upper surface is of concrete, with a brick kerb to the edge and a step up to the central bandstand. The bandstand has eight, cast-iron columns with decorative capitals and bases. A balustrade of wrought and cast iron encloses the lower body of the bandstand. Above the capitals of the columns are arched brackets with foliage tracery to their spandrels. The roof has wood shingles with lead flashings to the angles. At the apex is a wrought iron weather cock. At the base of each column is a makers mark, which has become illegible due to layers of paint. The bandstand is approached on its northern side by a wooden bridge which is supported by two concrete cut-waters. The deck supports balustrades to either side which have lattice panels. There is a drawbridge panel of decking to the northern end, between the northern cutwater and the shore.
INTERIOR: the ceiling is a flat sounding board.
3. The proposals
3.1This application seeks Listed Building Consent for:
• External redecoration and minor repairs to the bandstand, including refixing or replacing slipped or missing roof tiles, clearing gutters, clearing the rockery, refixing or replacing loose or missing stones, and carrying out repairs to metalwork.
• Replacement of the existing timber walkway bridge leading to the bandstand, which is now beyond repair. The proposal includes reusing the existing brick and concrete piers and incorporating the existing metal drawbridge into the new bridge design.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Application 25/00868/LB: Gheluvelt Park, Barbourne RoadReport | 9 pages | DownloadRead as text |
Follow Planning Committee at Worcester and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 13 Aug 2026 | Minutes of Previous Planning CommitteeThat the minutes of the meeting held on 23 rd July 2026 be approved as a correct record and signed by the Chair, subj... | Approved | Open |
| 23 Jul 2026 | Minutes of Previous Planning CommitteeThat the minutes of the meeting held on 21 st May 2026 be approved as a correct record and signed by the Chair. | Approved | Open |
| 23 Jul 2026 | Application 26/00440/LB - Worcester City Museum and Art Gallery, Foregate StreetThat the Committee grant Listed Building Consent, subject to conditions set out in section 9 of the report. | Decided | Open |
| 23 Jul 2026 | Planning Committee Annual Report 2025/26That the Committee approve the Planning Committee Annual Report and recommend it to Council for information. | Approved | Open |
| 21 May 2026 | Minutes of Previous Planning CommitteeThat the minutes of the meeting held on 16 th April 2026 be approved as a correct record and signed by the Chair. | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.