CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Worcester City Council
Planning Committee, Thursday 11 December 2025 at 3.00pm

Application 25/00868/LB - Gheluvelt Park, Barbourne Road

Decided Planning 1 paper

AI summaryWorcester City Council's Planning Committee granted Listed Building Consent for repairs to the Grade II listed bandstand in Gheluvelt Park and replacement of the park's timber bridge, subject to four conditions [D] [P64]. Work must start within three years, with repair details approved in advance [P65] [P70].

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeDecidedFour conditions apply to the consent [D] [P64].
MoneyNot stated
What happens nextStart within three years [P65]Submit repair and bridge details for written approval [P70] [P77].
Who it affectsBandstand, bridge and park users [2.2] [P55]Access is restored while heritage significance is protected [7.7] [7.9].

What was decided

The Planning Committee granted Listed Building Consent, subject to the four conditions in section 9 [D].

The consent covers external redecoration and minor repairs to the bandstand, including roof tiles, gutters, rockery, stones and metalwork [P13]. Report P13

It allows replacement of the timber walkway bridge, reusing the brick and concrete piers and the existing metal drawbridge [P14]. Report P14

Why

The timber walkway bridge is in poor condition and beyond reasonable repair, so replacement is necessary and will restore functional access [7.7]. Report 7.7

The bandstand repairs address localised deterioration and use materials and detailing that match the existing structure [7.6]. Report 7.6

Reusing the historic piers and metal drawbridge limits alteration to original fabric [7.7]. The assessment found no harm to the bandstand's significance, no identified public objections and no material considerations against approval [7.9] [8.3]. Report 7.7, 7.9, 8.3

What happens next

Before any repair or replacement work, submit photographs showing existing and proposed materials, specifications for timber, ironwork, paint, stone and mortar, and elevation and cross section drawings of the replacement bridge and fixtures for written approval [P70] [P71] [P72] [P73] [P74] [P75] [P76]. Report P70, P71, P72, P73, P74, P75, P76

Carry out the work in line with the approved plans, documents, specifications and recommendations [P67] [P68]. Use materials, workmanship and detailing that match the existing fabric and appropriate traditional construction methods [P79]. Any alternative materials or methods must first be submitted for written approval under Condition 3 [P80]. Report P67, P68, P79, P80

Start work before the expiration of three years beginning with the consent date [P65]. If bats or roosting activity are found, stop work immediately and seek advice from a suitably qualified ecologist or Natural England [P82]. Report P65, P82

Options considered

  • Chosen: Grant Listed Building Consent subject to conditions. The assessment found that the scheme would conserve the bandstand, prolong its life and cause no harm to its significance [7.9] [8.1]. Report P64, 7.9, 8.1

Implications

  • Legal: Works must begin before the expiration of three years beginning with the consent date [P65]. Report P65
  • Legal: The scheme must follow the approved plans, documents, specifications and recommendations [P67] [P68]. Report P67, P68
  • Legal: Repair and replacement details must receive written approval before work starts [P70] [P77]. Report P70, P77
  • Legal: Repairs must match the existing fabric in composition, appearance and performance, using appropriate traditional methods [P79]. Report P79
  • Legal: Alternative materials or methods need prior written approval under Condition 3 [P80]. Report P80
  • Risk: If evidence of bats or roosting activity is found, work must stop and qualified advice sought [P82]. Report P82
  • Risk: The bridge is in poor condition and beyond reasonable repair, so replacement will restore functional access [7.7]. Report 7.7
  • Other: The works prolong the bandstand's life and maintain its park contribution, with no harm or public objections identified [7.9] [8.2] [8.3]. Report 7.9, 8.2, 8.3

Who and where

  • Park users Report 2.2, 8.2
  • The Grade II listed bandstand Report 2.2, 7.9
  • The timber walkway bridge Report P14, 7.7
  • The historic brick and concrete piers Report P14, 7.7
  • The existing metal drawbridge Report P14, 7.7
  • Potential bats using the park and river corridor Report P43, P82
  • Worcester City Council as applicant Report 1.2

Timeline

  • May 1923: The bandstand and bridge were donated as the park was laid out [P7]. Report P7
  • March 6 2006: Approval was given for the erection of a footbridge [P31]. Report P31
  • August 16 2007: Approval was given for permanent timber steps and a ramp to the existing timber bridge [P32]. Report P32
  • 30 September 2025: The application was registered [1.1]. Report 1.1
  • 25 November 2025: The application was due for a decision [1.1]. Report 1.1
  • 15 December 2025: An extended determination deadline was agreed [1.1]. Report 1.1
  • Before the expiration of three years beginning with the date of this consent: The works must be commenced [P65]. Report P65
  • c.1923: The listing description dates the bandstand and wooden bridge [P7]. Report P7

Plain English for the jargon

  • Listed Building Consent: Permission for works affecting a listed building or its setting [4.2] [7.1].
  • Grade II listed: Heritage status requiring special regard to preserving the structure [2.2] [4.2].
  • SWDP: South Worcestershire Development Plan, adopted February 2016 [4.3] [P21].
  • NPPF: National Planning Policy Framework 2024 [4.5].
  • Historic fabric: The existing materials that repairs must match in composition, appearance and performance [P79].
  • Drawbridge: The existing metal section reused in the new bridge design [P14].
  • Bat assessment: A check for bat use before work, recommended by the Landscape Officer [P43].
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item62

Resolved

RESOLVED That the Committee grant Listed Building consent, subject to the conditions set out in section 9 of the report. COUNCILLOR LEWING IN THE CHAIR
Word for word from the decision Worcester published for this meeting. Source: committee.worcester.gov.uk

Follow this further

Built from Worcester's papers

What the report saysPro

Report to Planning Committee, 9 pages

Background

1.1The application was registered on 30 September 2025 and was due for a decision on 25 November 2025. An extension of time for the determination of the application has been agreed until 15 December 2025 to allow determination by the Planning Committee.

1.2The application is presented to Planning Committee as the Applicant is Worcester City Council

2. The site and surrounding area

2.1This application relates to the bandstand and bandstand bridge located within Gheluvelt Park.

2.2Gheluvelt Park is a public park in Worcester located along the A449 (Barbourne Road) and stretches across to the River Severn. It is a Grade II Listed war memorial park, including homes for ex-servicemen, designed and laid out by Alfred Hill Parker and including parts of the layout of an earlier garden landscape on the site. The Barbourne Brook, which leads to the Severn, feeds a duck pond within which is a Bandstand. The park also contains a children's play area, Sons of Rest building, tennis courts and a splash pad. The bandstand is a grade II listed structure in its own right.

Photos of draw bridge and concrete pillars 2.3 The listing description for the bandstand provides the following description;

A cast-iron band stand and wooden bridge of c.1923, standing on an island in the middle of an ornamental pond. The band stand was the gift of the High Sheriff of Worcestershire, Alfred Wiggin, in May 1923, at the time that the park was being laid out as a municipal amenity and war memorial. The bridge across the pond was given by James Ward, at the same time.

PLAN: the octagonal band stand sits on a circular island. It is approached by a wooden bridge from the north shore of the pond.

EXTERIOR: the side of the circular island has stone blocks, and the upper surface is of concrete, with a brick kerb to the edge and a step up to the central bandstand. The bandstand has eight, cast-iron columns with decorative capitals and bases. A balustrade of wrought and cast iron encloses the lower body of the bandstand. Above the capitals of the columns are arched brackets with foliage tracery to their spandrels. The roof has wood shingles with lead flashings to the angles. At the apex is a wrought iron weather cock. At the base of each column is a makers mark, which has become illegible due to layers of paint. The bandstand is approached on its northern side by a wooden bridge which is supported by two concrete cut-waters. The deck supports balustrades to either side which have lattice panels. There is a drawbridge panel of decking to the northern end, between the northern cutwater and the shore.

INTERIOR: the ceiling is a flat sounding board.

3. The proposals

3.1This application seeks Listed Building Consent for:

• External redecoration and minor repairs to the bandstand, including refixing or replacing slipped or missing roof tiles, clearing gutters, clearing the rockery, refixing or replacing loose or missing stones, and carrying out repairs to metalwork.

• Replacement of the existing timber walkway bridge leading to the bandstand, which is now beyond repair. The proposal includes reusing the existing brick and concrete piers and incorporating the existing metal drawbridge into the new bridge design.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Application 25/00868/LB: Gheluvelt Park, Barbourne RoadReport 9 pages DownloadRead as text

At this meeting

Whole meeting

Who was there

12 of 13 attended
PA
Councillor Patricia AgarVice-Chair, present
AA
Councillor Alan AmosCommittee Member, present
JB
Councillor Jenny BarnesCommittee Member, present
SB
Stephanie Bartley-SmithCouncil Staff, expected
AC
Councillor Andrew CrossCommittee Member, present
JD
Councillor Jill DesayrahCommittee Member, present as substitute
EK
Councillor Ed KimberleyCommittee Member, present
AK
Councillor Alex KinnersleyCommittee Member, present
KL
Councillor Karen LewingChair, present
ER
Councillor Elena RoundCommittee Member, present
JR
Councillor John RudgeCommittee Member, present
SS
Councillor Sue SmithCommittee Member, present

All 13 on the meeting page

On this subject at Worcester

Search all
  1. Application 25/00868/LB - Gheluvelt Park, Barbourne RoadThis decision
  2. Application P17E0239 - Gheluvelt Park, Barbourne RoadDecided
  3. Application P16E0335 - Gheluvelt Park, Barbourne RoadDecided
  4. Application A16A0028 - Gheluvelt Park, Barbourne RoadDecided

More from Worcester Planning Committee

All decisions
MeetingDecisionOutcome
13 Aug 2026 Minutes of Previous Planning CommitteeThat the minutes of the meeting held on 23 rd July 2026 be approved as a correct record and signed by the Chair, subj... Approved Open
23 Jul 2026 Minutes of Previous Planning CommitteeThat the minutes of the meeting held on 21 st May 2026 be approved as a correct record and signed by the Chair. Approved Open
23 Jul 2026 Application 26/00440/LB - Worcester City Museum and Art Gallery, Foregate StreetThat the Committee grant Listed Building Consent, subject to conditions set out in section 9 of the report. Decided Open
23 Jul 2026 Planning Committee Annual Report 2025/26That the Committee approve the Planning Committee Annual Report and recommend it to Council for information. Approved Open
21 May 2026 Minutes of Previous Planning CommitteeThat the minutes of the meeting held on 16 th April 2026 be approved as a correct record and signed by the Chair. Approved Open