Resolved
Resolved That planning permission be granted, and that the Head of Planning be authorised to issue the decision notice, subject to the completion of a Section 106 Agreement to provide an off site contribution towards public open space, education facilities and recycling infrastructure, and to conditions, inter alia including the following:- T002 Detailed Planning Permission T009 Amended Plan A004 Samples of Materials A014 Floorslab Levels of New Dwellings/Detail M009 Removal of Permitted Dev Rights M010 Construction Hours of Works U008 Garage Use Restrictions LS01 L/ scape details are req'd to be submitted H018 On Site Roads - Submission of Details H019 On Site Roads – Phasing H021 Wheel Washing H027 Parking for Site Operatives L017 Tree and Hedge Retention Z001 Development shall not begin until drainage works have been carried out for the disposal of foul and surface water in accordance with details to be submitted to and approved in writing by the Local Planning Authority. The means of foul and surface water drainage shall be constructed in accordance with the approved details prior to the first occupation of the development hereby approved. Reason - To ensure a satisfactory means of drainage is available to serve the development and to reduce the risk of flooding. Z002 Construction work shall not begin until a detailed survey of the level of noise that the dwellings will be subjected to and a scheme for protecting the dwellings from noise from the adjoining railway line has been submitted to and approved in writing by the Local Planning Authority. All works which form part of the scheme shall be completed before any of the dwellings are occupied. The site layout, internal design and building specification of the proposed development shall be such that noise levels within the dwelling with windows closed shall not exceed 35 dB(A). Reason - To safeguard the amenities of the occupiers. Z003 No development shall take place until there has been submitted to and approved in writing by the Local Planning Authority a plan indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed before the use hereby permitted is commenced or before any dwelling is first occupied. Development shall be carried out in accordance with the approved details and thereafter retained. Reason -In order to ensure that there is an acceptable form of screening with adjacent properties and to the site boundaries. Z004 The first floor rear bathroom window on the east elevation of plot 3 shall in the first instance and on all subsequent occasions be obscurely glazed ... view the full minutes text for item 142.