Item20
Resolved
Resolved Conditionally approved:- T002 Detailed Planning Permission CON2 Stonework CON5 Roofing Materials A004 Samples of Materials LS02 L/scape scheme submitted as part of Application Z001 Prior to the commencement of the use of the building hereby approved the B1 office use of The Farmhouse, Harvey 's Place, The Potting Shed, The Stables and The Coach House shall cease and the buildings shall be used solely for the purposes stated on drawing number 3732/09. Reason - In order to justify the erection of a building of the size proposed and to ensure that the proposal does not result in an unacceptable intensification of the use of the site. Z002 In the event of contamination being encountered during development works that is different to that previously identified, then a risk assessment must be provided to the Local Planning Authority. In the event that remediation is now required or any proposed remediation requires an amendment as a consequence, a new or revised Remediation Proposal must be provided prior to development work continuing. Reason - To prevent unacceptable risks to human health, controlled waters and the environment. Z003 Full details of any soil or soil forming materials brought onto the site for use in garden areas, soft landscaping, filling and level raising must be provided. Where the donor site is unknown or is brownfield the material must be tested for contamination and suitability for use on the site. Full donor site details, proposals for contamination testing including testing schedules, sampling frequencies and allowable contaminant concentrations (as determined by appropriate risk assessment) must be submitted to and approved in writing by the Local Planning Authority prior to commencement of work on site. The approved testing must then be carried out and validatory evidence (such as laboratory certificates) submitted to and approved in writing by the Local Planning Authority prior to any soil or soil forming materials being brought on to the site. Reason - To prevent unacceptable risks to human health, controlled waters and the environment. Z004 Additional flow should not be discharged into existing watercourses so that any downstream flooding problems are not exacerbated or created. Discharge should be limited to an estimate of the green field run-off from the site and any surplus flows attenuated to cater for the return period storm that results in the 1% probability Return Period Flood. Reason - In the interests of flood prevention Z005 The development hereby permitted shall not be brought into use until the internal access road, turning areas and vehicle and cycle parking facilities shown on the approved plan have been properly consolidated, surfaced, drained and otherwise constructed in accordance with details to be submitted to and approved in writing by the Local Planning Authority and these areas shall thereafter ... view the full minutes text for item 20.
Word for word from the decision Wychavon published for this meeting.
Source: mgov.wychavon.gov.uk